Laserfiche WebLink
REFRIGERATION KEYNOTES REFRIGERATION SYMBOLS GENERAL NOTES <br /> 10.12.1) .31 20 <br /> X## CIRCUIT NUMBER (CIRCUIT INFO) 1. PLANS INDICATE GENERAL ROUTING OF <br /> 15.601 SLOPE REFRIGERANT LINES BACK TO XXX MODEL NUMBER REFRIGERANT LINES,WITH A SINGLE LINE <br /> COMPRESSORS AT 1"PER 20'OF RUN.LOCATE SHOWN INDICATING BOTH SUCTION AND LIQUID <br /> HIGHEST POINT OF REFRIGERATION LINES JUST CO IF CLEANOUTS(CO) LINE ROUTING FOR EACH SYSTEM. <br /> BELOW BOTTOM CHORD OF JOIST OR BEAM. CONDENSATE DRAIN LINE(CD) <br /> COORDINATE ELEVATION TO AVOID CONFLICTS 2. REFRIGERATION SYSTEM INSTALLATION SHALL <br /> WITH DUCTWORK,LIGHTING,SKYLIGHTS,ETC. CONNECT TO EXISTING BE IN COMPLETE CONFORMANCE WITH <br /> 15.602 SUPPORT HORIZONTAL RUNS OF REFRIGERANT �� CONTINUATION SPECIFICATIONS,AND WITH ALL REQUIREMENTS <br /> LINES ON 1-5/8"X 1-5/8"UNISTRUT CHANNELS ON OF REFRIGERATION EQUIPMENT <br /> MANUFACTURER. <br /> MAXIMUM OF 6 FOOT CENTERS. DETAIL NUMBER <br /> 15.603 AT ALL POINTS WHERE SUCTION LINES RISE, X# SHEET NUMBER (DETAIL REFERENCE) 3. REFRIGERATION DRAWINGS ARE PROVIDED AS <br /> PROVIDE A SUCTION LINE TRAP AT THE BASE OF AN AID TO BIDDERS AND TO INDICATE DESIRED <br /> THE RISER. ROUTING OF REFRIGERATION LINES; <br /> 15.604 PROVIDE AIRTIGHT SEAL AROUND ALL PIPING EVAPORATOR COIL CONTRACTOR SHALL ASSUME FULL <br /> AND BOLT PENETRATIONS THROUGH RESPONSIBILITY FOR CORRECT INSTALLATION <br /> COOLER/FREEZER BOX WALLS OR CEILINGS. OF PIPING AND ACCESSORIES TO PROVIDE A <br /> 15.605 SUPPORT EVAPORATORS WITH BOLTS THROUGH �§ ISOLATION VALVE COMPLETE AND FULLY OPERATING SYSTEM. <br /> ROOF TO 1-5/8"X 1-5/8"X 10'LONG 14 GA. <br /> GALVANIZED UNISTRUT SPANNING THREE ROOF ELBOW-TURNED DOWN 4. REFER TO SPECIFICATION 15600 FOR w % <br /> PANELS.PROVIDE DOUBLE NUTS ON EACH BOLT. INSULATION THICKNESS.INSIDE DIAMETER OF <br /> 15.606 CONDENSATE DRAIN;PITCH DRAIN LINES DOWN ELBOW TURNED UP INSULATION SHALL MATCH PIPE DIAMETER TO w w w g C u <br /> APPROXIMATELY I/8"PER 12'TOWARD DRAIN. MINIMIZE AIR GAPS BETWEEN PIPING AND rc :gLLw:p000" <br /> PROVIDE COPPER PIPING WITH ELECTRIC HEAT REFRIGERATION KEYNOTE REFERENCE INSULATION.PROVIDE FACTORY PRE- o a W..: <br /> TAPE AND INSULATION ON ALL CONDENSATE REFRIGERATION PIPING(ABOVE) MANUFACTURED FITTINGS AT ALL TRAPS AND "O a ao�a o.oi-»rpa <br /> LINES EXPOSED TO FREEZING TEMPERATURES. ELBOWS.WHERE PRE-MANUFACTURED z °���'o„„W,p 6 H o W o <br /> ---------- REFRIGERATION PIPING(BELOW) FITTINGS ARE UNAVAILABLE MITER CUT ALL O 3«s�^=o��"+::�: <br /> 15.607 SEE SCHEDULES FOR EVAPORATOR TYPES, F oe"��rcw-�Fpo�a <br /> SIZES,AND CAPACITIES;CONTROL METHOD;AND ETR EXISTING TO REMAIN FITTINGS TO ENSURE PROPER SEAL BETWEEN6S <br /> ALL REFRIGERATION PIPING SIZES,ETC. INSULATION SEGMENTS. o yw w o <br /> lz <br /> sa, oa� s <br /> 15.608 END CONDENSATE LINE OVER RECEPTOR W/AIR (TYP) TYPICAL 5. PIPE INSULATION SHALL BE BLACK,UNLESS ai a �'�'�a: <br /> GAP.CONTRACTOR SHALL ENSURE FLOOR DRAIN(S)AND DRAIN LINE OTHERWISE STATED ON PLANS OR <br /> SERVING WALK-IN SPECIFICATIONS. <br /> ARE FREE OF OBSTRUCTIONS AND FUNCTION 24 HOURS PRIOR TO SHUTTING DOWN ANY <br /> PROPERLY.WHERE EXTENSIVE DAMAGE EXISTS REFRIGERATION SYSTEMS,HVAC SYSTEMS OR BUILDING 6. COORDINATE REFRIGERATION DEMOLITION <br /> AND/OR PROPER DRAINAGE CANNOT BE AUTOMATION CONTROLS SYSTEMS,SEND EMAIL TO ISSUES WITH THE ARCHITECTURAL DRAWINGS. <br /> OBTAINED COORDINATE WITH WALMART NSRM@WALMART.COM.THE E-MAIL SHALL STATE WHAT, REFER TO ARCHITECTURAL PLANS FOR <br /> MECHANICAL CONSTRUCTION MANAGER. WHY,AND WHEN IT IS BEING SHUT DOWN AND HOW LONG REFRIGERATION EQUIPMENT DEMOLITION AND Z <br /> 15.609 PROVIDE PVC DRAIN LINE FROM EACH CASE IT IS ANTICIPATED TO BE SHUT DOWN.THEN SEND A COOLER REPAIR AND REMODELING. ¢ HI <br /> DRAIN CONNECTION SAME SIZE AS CASE FOLLOW UP EMAIL TO NSRM@WALMART.COM AFTER THE <br /> OUTLET,AND END OVER FLOOR RECEPTOR WORK IS COMPLETE AND THE SYSTEM IS BACK UP AND 7, REFRIGERATION SYSTEM SHALL REMAIN Z o <br /> W/AIR GAP;PITCH DRAINS 1/8"PER 12".PROVIDE RUNNING. OPERATIONAL DURING REMODELING.DURING F <br /> DRAIN COVER GRATE TO MATCH EXISTING. THE PHASING OF OLD TO NEW SYSTEMS,BOTH Z <br /> CONTRACTOR SHALL ENSURE RECEPTOR(S)AND REFERENCE ARCHITECTURAL DRAWINGS FOR ALL NEW NEW AND OLD REFRIGERATION SYSTEMS MAY <br /> DRAIN LINE(S)SERVING CASE LINE-UP ARE FREE CASES BEING INSTALLED FOR CONNECTION LOCATION OF BE REQUIRED TO OPERATE AT THE SAME TIME j t] <br /> OF OBSTRUCTIONS AND FUNCTION PROPERLY. UTILITIES.(TOP FED VS BOTTOM FED) FOR A SHORT PERIOD. z d <br /> WHERE EXTENSIVE DAMAGE EXISTS AND/OR O <br /> PROPER DRAINAGE CANNOT BE OBTAINED SEPARATE CONTRACTOR IS RESPONSIBLE FOR RE-SKIN 8. WHERE NEW REFRIGERATED EQUIPMENT IS U <br /> COORDINATE WITH WALMART MECHANICAL OF EXISTING REFRIGERATED CASES TO REMAIN. INDICATED ON THE DRAWINGS,PROVIDE <br /> CONSTRUCTION MANAGER. DEMOLITION,REMOVAL,AND TEMPORARY <br /> 15.610 PROVIDE 0.020"PVC JACKET ON ALL ALL WORK ON THIS SHEET IS TO BE COMPLETED BY A STORAGE OF OLD EQUIPMENT PER WALMART <br /> REFRIGERATION LINES EXTERIOR TO BUILDING. WALMART APPROVED CONTRACTOR. MECHANICAL SERVICES CONSTRUCTION <br /> 15.617 COORDINATE REFRIGERATION LINE MANAGER'S INSTRUCTIONS,AND <br /> PENETRATIONS THROUGH ROOF.REINFORCE REFRIGERATION CONTRACTOR IS RESPONSIBLE FOR ALL REFRIGERATION DEMO NOTES. O O <br /> ROOF STRUCTURE AS NECESSARY.CUT ROOF FINAL REFRIGERATION ELECTRICAL TERMINATIONS TO z <br /> OPENING FOR THE REFRIGERATION PIPE REFRIGERATION EQUIPMENT. 9. COORDINATE REMOVAL AND DISPOSAL OF O C\ <br /> PENETRATION AND SUPPLY ROOF CURB WITH EXISTING EVAPORATORS,REFRIGERATED O O Q <br /> WEATHERTIGHT SHEETMETAL COVER. VERIFY EXACT LOCATION OF ALL REFRIGERATED CASES CASES,AND CONDENSING UNITS,WITH <br /> PROPERLY FLASH,PATCH,AND REPAIR ROOF AS WITH FINAL MERCHANDISE PLAN. WALMART MECHANICAL SERVICES r~r� Q <br /> REQUIRED FOR NEW PENETRATION. CONSTRUCTION MANAGER. Z J COORDINATE EXACT SIZE AND LOCATION OF COORDINATE LOCATION OF REFRIGERATED CASES WITH <br /> ROOF PENETRATIONS WITH STRUCTURAL PLUMBING CONTRACTOR PRIOR TO CUTTING OF FLOOR 10. REMOVE COPPER LINES,EVAPORATORS,AND = Q 0 <br /> DRAWINGS. AND SETTING DRAINS. CONDENSATE LINES FROM COOLERS/ y <N a <br /> �J <br /> 15.621 REFRIGERATION CONTRACTOR SHALL RECEIVE, FREEZERS BEING REMOVED FROM SITE. <br /> SET EQUIPMENT IN PLACE,LEVEL,AND START ALL EXISTING REFRIGERATED CASES ARE TO REMAIN COORDINATE WITH WALK-IN PANEL VENDOR U l <br /> UP OWNER'S SELF-CONTAINED REFRIGERATED UNLESS NOTED OTHERWISE. FOR TIME LINE OF REPLACEMENT.REFERENCE > W z o <br /> SPECIFICATION FOR CONTACT INFORMATION. <br /> EQUIPMENT.INSTALLATION AND START-UP w w N <br /> SHALL BE IN STRICT CONFORMANCE WITH THE IF REPLACED REFRIGERANT LINE SIZES ARE LARGER o <br /> EQUIPMENT MANUFACTURER'S WRITTEN THAN SUCTION OR LIQUID HEADER STUB SIZES,REPLACE 11. WALK-IN PANEL VENDOR SHALL PROPERLY w Or ^' <br /> INSTALLATION AND START-UP INSTRUCTIONS. STUB WITH SAME SIZE AS NEW REFRIGERANT LINE. PREPARE ALL COOLER/FREEZER PANELS, O W w <br /> CONTRACTOR SHALL VERIFY CASE OPERATION COORDINATE WITH CONSTRUCTION MANAGER AND RACK GLASS DOORS,SLIDER OR SWING DOORS, <br /> AND NOTIFY WALMART MECHANICAL OEM. PALLETIZE,AND PREPARE THE EQUIPMENT TO � o <br /> CONSTRUCTION MANAGER IF EQUIPMENT IS NOT SHIP OFF SITE. m <br /> OPERATING PROPERLY. CONTRACTOR TO RE-USE EXISTING CASE DRAINS. w <br /> 12 COORDINATE WITH FIRE PROTECTION <br /> 15.625 ROUTE REFRIGERATION LINES IN BASE OF CASE REPLACE DRAIN IF MORE THAN 1/2 OF DRAIN IS EXPOSED <br /> TO SALES FLOOR.FIELD VERIFY EXACT LOCATIONS. CONTRACTOR FOR THE REMOVAL OF w <br /> FOR ALL BOTTOM FED CONNECTED CASES. W <br /> SPRINKLERS FOR ALL REMOVED ro <br /> SLOPE BACK TO COMPRESSOR AT 1"PER 20'-0" j <br /> OF RUN. PROJECT COORDINATED WITH REFRIGERATION VENDOR COOLER/FREEZER BOXES. Z <br /> 15.635 REFRIGERATION CONTRACTOR SHALL INSTALL (OEM)AS INDICATED ON REFRIGERATION SCHEDULE(S). 13. COORDINATE WITH ELECTRICAL CONTRACTOR <br /> REFRIGERATION MANUFACTURER-FURNISHED PRIOR TO INSTALLING ANY EQUIPMENT OR ADJUSTING FOR THE REMOVAL OF ALL REMOVED <br /> LIQUID LINE SOLENOID VALVE AND EVAPORATOR PRESS RE REGULATOR IN A SERVICE RACK PARAMETERS,REFRIGERATION CONTRACTOR COOLER/FREEZER BOXES ELECTRICAL WIRING <br /> ACCESSU .IBLE LOCATION INSIDE CASE DRAIN PAN SHALL REQUEST A SUCTION GROUP REPORT FOR ALL DEVICES. <br /> CONTRACTOR SHALL FURNISH AND INSTALL RACKS AND SUCTION GROUPS WHERE WORK IS 14. COORDINATE WITH SAS CONTRACTOR FOR THE ISSUE BLOCK <br /> FULL PORT ISOLATION BALL VALVE IN A SERVICE PERFORMED.REQUEST VIA EMAIL AT B.PTEAM1@WAL- REMOVAL OF ALL REMOVED COOLER/FREEZER <br /> ACCESSIBLE LOCATION INSIDE CASE DRAIN PAN. MART.COM BOXES BAS WIRING AND DEVICES. <br /> INSTALL CONTROL WIRING FROM VALVES BACK <br /> TO CASE OR RACK CONTROLLER.REFER TO <br /> REFRIGERATIONSUBMITTALS/SCHEDULES AND EPA CLEAN AIR ACT US 15. EXISTING REFRIGERATION PIPING MAY BE RE- <br /> ED UNLESS OTHERWISE NOTED ON PLANS. <br /> BAS PLANS FOR EXACT REQUIREMENTS.REFER REFER TO SCHEDULES FOR PIPE SIZE <br /> TO SPECIFICATIONS FOR ASSET TAGGING REQUIREMENTS. <br /> REQUIREMENTS. COMPLY WITH CLEAN AIR ACT,TITLE VI,SECTION 608 <br /> 15.636 REFRIGERATION CONTRACTOR SHALL INSTALL AND CODE OF FEDERAL REGULATION TITLE 40,PART 82 16. BUILDING COMPONENTS ABANDONED BY THE <br /> REFRIGERATION MANUFACTURER-FURNISHED WHEN ADDING OR REMOVING REFRIGERATED SCOPE OF WORK SHALL BE SECURED TO <br /> LIQUID LINE SOLENOID VALVE AND EVAPORATOR EQUIPMENT.RECORD ALL EQUIPMENT IDENTIFICATION PREVENT FALLING,LOOSENING,OR CREATING <br /> PRESSURE REGULATOR IN A SERVICE NUMBERS,MODEL AND SERIAL NUMBERS,THE AMOUNT DAMAGE OF ANY KIND IN THE FUTURE. <br /> ACCESSIBLE LOCATION ON TOP OF WALK-IN OF REFRIGERANT RECOVERED FROM EACH UNIT,THE <br /> BOX.CONTRACTOR SHALL FURNISH AND DATE OF DECOMMISSIONING,COMPANY NAME AND 17. IF ANY RACK SYSTEMS WILL BE OPENED TO ADD <br /> INSTALL FULL PORT ISOLATION BALL VALVE IN A SIGNATURE OF ON-SITE SUPERVISOR. OR REPLACE CASES,EVAPORATORS,ETC.THEN <br /> SERVICE ACCESSIBLE LOCATION ON TOP OF 24 TO 48 HOURS AFTER THE WORK IS <br /> WALK-IN BOX.INSTALL CONTROL WIRING FROM COMPLETED AND ALL FINAL ADJUSTMENTS <br /> VALVES BACK TO CASE CONTROLLER OR HAVE BEEN MADE,PROVIDE AND CHANGE <br /> CONDENSING UNIT.REFER TO REFRIGERATION LIQUID LINE FILTER CORES,OIL SYSTEM FILTER <br /> SUBMITTALS/SCHEDULES AND BAS PLANS FOR USING SPORLAN OF STYLE FILTER,AND <br /> EXACT REQUIREMENTS.REFER TO REPLACE SUCTION FILTERS.FILTERS ARE TO BE <br /> SPECIFICATIONS FOR ASSET TAGGING RATED FOR WAX REMOVAL.CONTRACTOR TO <br /> REQUIREMENTS. PROPERLY DISPOSE OF OIL AND COMPONENTS <br /> REPLACED.REFER TO SPECIFICATION 15600. <br /> 18. REFER TO GROCERY ARCHITECTURAL CHECKED BY. DL <br /> DRAWINGS FOR ADDITIONAL WORK BY <br /> REFRIGERATION CONTRACTOR. DRAWN BY: GM <br /> 19. INSTALL ASSET TAGS ON ALL NEW PROTO: 90 <br /> PIPING SCHEDULE RACK MTC REFRIGERATED CASES AND COMPLETE THE <br /> VERTICAL ESTIMATED DATA COLLECTION INFORMATION.DELETE PROTO CYCLE: 11/11/22 <br /> DEMOED ASSETS FROM ASSET TAGGING <br /> PIPE HORIZONTAL SUCTION RISER TOTAL APPLICATION.REFER TO SPECIFICATIONS. DOCUMENT DATE: 02/22/23 <br /> DESIGNATION SUCTION AS REQUIRED LIQUID LENGTH" <br /> 1C 31/8 15/8&25/8 15/8 16 20. UPON START-UP OF ALL NEW REFRIGERATED <br /> 1.1C 15/8 1 5/8' 7/8 22 EQUIPMENT,CONSTRUCTION MANAGER SHALL <br /> C01 1 1/8 7/8 112 38 REQUEST THE BUILDING PERFORMANCE <br /> REPORT FOR ALL RACKS AND SUCTION GROUPS <br /> 1.12C 13/8 1 3/8' 5/8 15 WHERE WORK IS PERFORMED.ANY DEVIATIONS <br /> 1 2 3 CO2 7/8 5/8 1/2 31 NOTED ON THE REPORT MUST BE CORRECTED <br /> 1.13C 13/8 1 1/8' 5/8 33 PRIOR TO PROJECT CLOSE OUT.REQUEST VIA <br /> CO3 7/8 5/8 1/2 19 EMAIL AT B.PTEAM10WAL-MART.COM <br /> C04 11/8 11/8 112 45 <br /> 12 13 1.2C 31/8 31/8' 13/8 13 FOOD PREP AREA NOTES <br /> 1.21 C 15/8 1 5/8' 718 5 <br /> 1.22C 13/8 13/8 7/8 22 <br /> to 5/8 5/8 1/2 49 ❑ ROUTE ALL PIPING CONCEALED WITHIN STUD <br /> C06 1 1/8 7/8 1/2 27 ❑ WALLS WHEREVER POSSIBLE. <br /> 2.❑ ALL EXPOSED PIPE INSULATION SHALL BE <br /> 1 15.604 4 C16 1 1/8 7/8 1/2 51 ❑ CLAD PER SPECIFICATIONS.EXPOSED <br /> 3 6 15.605 C07 5/8 5/8 1/2 17 ❑ PIPING SHALL COMPLY WITH ONE OF THE <br /> 15.607 R3 ® 1.3C 25/8 25/8' 11/8 26 ❑ FOLLOWING INSTALLATION OPTIONS. <br /> RCU 1&2 MOUNTED ON ROOF. R3 R3 RGO_ A.SURFACE MOUNTING PIPING WITH <br /> REFER TO STRUCTURAL AND 8 \ C08 5/8 5/8 1/2 46 <br /> OEM SUBMITTALS FOR SUPPORT. R3 15.603 KRD44E-148TDAK NON-CORROSIVE ANCHORS;SEAL <br /> 1.4C 2 5/8 2 5/8' 1118 28 <br /> ALL EMERSON CONDENSING TYp (NEW) 15.604 4 1.41C 718 5/8• 112 7 BOTH SIDES L PIPE S SURFACE <br /> UNITS SUPPLIED WITH OWNER- 15.610 15,605 CONTINUOUSLY WITH SEALANT. <br /> �Q-� 15.607 R3 C09 5/8 1/2 12 34 B.INSTALL PIPING 1/2"OFF FACE OF <br /> 15.609 FURNISHED,CONTRACTOR- TYP P FREEZER R -1 C10 5/8 5/8 1/2 37 SURFACE TO ALLOW FOR CLEANING. <br /> INSTALLED WIND SCREEN.TYP. <br /> 15.625 USE ONLY NON-CORROSIVE <br /> NEW MT S/C CASE KRD44E 48TDAK L 1.5C 25/8 21/8' 1118 16 <br /> 15.635 MATERIALS FOR ANCHORS AND❑ <br /> 15C-05 .621 w - (N W) 1.51C 15/8 7/8&11/8 7/8 34 SPACERS. <br /> MTUMD j -� C71 13/8 11/8' 1/2 34 <br /> C.COVER PIPING WITH 20 GAUGE <br /> 15.636 <br /> L - (REPLACEDI CO TYP C12 13/8 1 1/8• 5/8 71 STAINLESS STEEL BENT PLATES <br /> 1 NEW PIPE CHASE IN tRCU-1 TYP ��� 1.6C 21/8 1 5/8" 7/8 44 MOUNTED TO SURFACE WITH NON- <br /> ROOF.COORDINATE CORROSIVE ANCHORS;APPLY <br /> R3 7 1.61C 15/8 13/8" 7/8 6 <br /> SIZE AND LOCATION 15.606 CONTINUOUS SEALANT ALONG EDGES <br /> E15.617 WITH STRUCTURE(TYP) " - -- ryp R3 C13 1 1/8 1 1/8 1/2 25 <br /> J j AND JOINTS. <br /> U I C14 13/8 11/8 5/8 �14 <br /> NEW HOT CASE D - 2 - REFRIGERATION - - .O�Tc rnNDENSATE - C15 L-1 7/8 1/2 3.❑ PROPER INSTALLATION OF SEALANTS IS <br /> R3 PIPING DOWN LINE 17�0 PUMP MOUNTED C15a 1/8 5/8 11 ❑ CRITICAL TO MEETING WALMART QUALITY <br /> - - - - - eTHROUGH ROOF.(TYP) ON FF�EEZER WALL 15.608 <br /> V J C156 7/8 5/8 1/2 ❑ STANDARDS.PROVIDE SEALANTS IN DOCUMENTS THAT DO NOT <br /> \ RCU-3 MOUNTED ON ROOF. ❑ ACCORDANCE WITH DRAWINGS AND HAVE THE ARCHITECT OR <br /> 1.2C ❑ SPECIFICATIONS.REFERENCE SECTION 07900 ENGINEER OF RECORD <br /> REFER TO STRUCTURAL AND RISER SIZE IS SHOWN EVEN WHERE A RISER IS NOT EXPECTED.THIS IS FOR ❑ FOR SEALANT SCHEDULE. SEAL AND SIGNATURE <br /> H \ ro OEM SUBMITTALS FOR SUPPORT. RCU- REFERENCE ONLY AND TO BE USED IN THE EVENT THAT A PIPING CONFLICT <br /> lul 1.21C 4.❑ INTERIOR SEALANTS USED IN FOOD PREP SHALL BE CONSIDERED <br /> 1J'C16 GLD66D 268TDAA CAUSES THE NEED FOR A RISER.IF RISER LENGTH EXCEEDS 4 FEET,IT MUST BE ❑ AREAS <br /> OF SHALL MEET THE REQUIREMENTS FOR NOT FOR CONSTRUCTION <br /> S COORDINATE ROUTINGTT 7 _ IN W) APPROVED BY ENGINEER OF RECORD. ❑ USE IN USDA REGULATED FACILITIES. <br /> REFRIGERATION 15.604 <br /> `03 C05 R3 4 5.❑ PROVIDE CONTINUOUS USDA APPROVED <br /> PIPING WITH EXISTING PICKUP COOLER 1 15.605 ❑ SEALANT AT ALL JOINTS BETWEEN MATERIALS <br /> PIPING,DUCTWORK,AND 15.607 R3 THIS IS <br /> TOTAL LENGTH INCLUDES HORIZONTAL AND VERTICAL PIPE SECTIONS. ❑ ON WALLS IN FOOD PREPARATION COOLER <br /> 15.602 LIGHTS.(TYP) THIS IS ONLY AN ESTIMATE AND ACTUAL LENGTH WILL VARY. ❑ AND FREEZER AREAS. REFRIGERATION <br /> f� 6.❑ ALL JOINTS BETWEEN DISSIMILAR MATERIALS PLANS <br /> GT EXISTING 'TM'NEW PIPING ❑ SHALL BE SEALED AS REQUIRED FOR A <br /> e RACK MTC HCR DOOR FURNISHED ❑ COMPLETE AND PROPER INSTALLATION, <br /> AND INSTALLED BY ❑ REGARDLESS OF WHETHER SHOWN ON <br /> MECH#1 OTHERS.TYP. ❑ DRAWINGS OR NOT. <br /> A - T - - - - - - - - - - - <br /> EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING <br /> ORIGINFRONT REFRIGERATION PLAN PICKUP REFRIGERATION PLAN SEXACTALDRAWINGSANDMAY NOT REFLECT ATHOROUGONS INT THEIR <br /> REL OF ATELL D FIELD.THE FAILURE <br /> EXACT"AS-BUILT'CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE <br /> •1 SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES <br /> PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING <br /> SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET: <br /> DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF R 1 <br /> EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO <br /> FAMILIARIZE WORKERS WITH THIS KNOWLEDGE. <br />