|
GENERAL NOTES
<br /> 1.-GENERAL NOTES ARE APPLICABLE TO ALL 21.CCONTRACTOR IS RESPONSIBLE TO FIELD VERIFY
<br /> I MECHANICAL AND PLUMBING DRAWINGS. ❑ LOCATION AND SIZES OF ALL EXISTING PIPING THAT
<br /> ❑ IS BEING CONNECTED TO OR MODIFIED,AND TO
<br /> 2.0 PROVIDE ALL MATERIALS FOR A COMPLETE ❑ VERIFY THAT PROPER SLOPES AND ELEVATIONS ARE
<br /> ❑ INSTALLATION PER PROJECT SPECIFICATIONS AND ❑ AVAILABLE BEFORE CUTTING FLOOR SLAB.MAINTAIN
<br /> ❑ READY FOR INTENDED USE AND IN STRICT ❑ MINIMUM SLOPE OF 1/8"PER FOOT FOR SAN SEWER
<br /> ❑ ACCORDANCE WITH STATE AND LOCAL CODES AND ❑ PIPING 3"OR LARGER.MAINTAIN MINIMUM SLOPE OF
<br /> ❑ MANUFACTURERS RECOMMENDATIONS. ❑ 1/4"PER FOOT FOR SAN SEWER PIPING SMALLER
<br /> ❑ THAN 3".[MAINTAIN 1/4"PER FLOOR SLOPE FOR
<br /> 3.0 STORE MUST BE KEPT IN OPERATION.ARRANGE ALL ❑ GREASE WASTE PIPING.]REF ARCH.FOR TRENCHING
<br /> ❑ WORK TO KEEP DISRUPTIONS TO STORE ❑ REQUIREMENTS.
<br /> ❑ OPERATIONS TO A MINIMUM.COORDINATE WITH ❑
<br /> ❑ EXISTING AND NEW CONSTRUCTION.PAY ALL 22.ESLOPE INTERIOR CONDENSATE PIPING AT 1/8"PER
<br /> ❑ NECESSARY FEES AND PERMITS. ❑ FOOT WHEN NOT INSTALLED PARALLEL TO ROOF
<br /> ❑ SLOPE.
<br /> 7 7.6 8 4.❑IF NEW CONSTRUCTION DISRUPTS EXISTING
<br /> J SERVICES(GAS,SEWER,DOMESTIC WATER,ETC.), 23.EPROVIDE ACCESS DOORS TO NEW WATER VALVES
<br /> PROVIDE ALL MATERIALS AND LABOR AS REQUIRED ❑ AND CLEANOUTS AS NECESSARY WHEN INSTALLED
<br /> RAG ,r _ 1 7 TO MAINTAIN THEIR PROPER OPERATION. ❑ IN INACCESSIBLE AREAS.
<br /> 12"ETR ETR 14"z14"� rn H ��o wwLLi�
<br /> --- - _ --- - B 5.❑EMPLOY OWNER APPROVED ROOFING 24.EPLUMBING CONTRACTOR SHALL PROVIDE ONE YEAR w L'i wppwa i;��
<br /> 0
<br /> LL
<br /> -- --- --- -'CD - ❑ CONTACTORS FOR CUTTING AND PATCHING ROOF. ❑ WARRANTY FOR PROPER SEWER SYSTEM
<br /> SAW ETR RAG IG ❑ REFERENCE SPECIFICATIONS FOR APPROVED ❑ OPERATION.
<br /> ETR ETR CD' ETR / RAG ❑ ROOFING CONTRACTORS. rcr$y°'a
<br /> RTUd ETR bCD ETR 25.ESANITARY DRAINAGE LINES AND FITTINGS(DRAIN, Z `�E�.A
<br /> O u,
<br /> EAG 3 TON FAMII2! ETR 6.❑INSTALL OWNER FURNISHED RTU CURB AND ❑ WASTE AND VENT)SHALL BE PVC-DWV PLASTIC r w��3rc°3 Fad
<br /> ETR a 1200 T ❑ TEMPORARY COVERCURB PERARCH DETAIL(IF ❑ SCHEDULE 40.WHERE REQUIRED BY LOCAL CODES,
<br /> ETR CD ❑ USED).RTU'S SHALL BE FURNISHED BY OWNER AND ❑ CAST IRON,COATED INSIDE AND OUTSIDE SHALL o ok w$W o o rc 3
<br /> [ RTU-4 ETR ❑ INSTALLED BY CONTRACTOR.CURB ADAPTOR(IF ❑ BE USED IN LIEU OF PVC.ALL PHOTOLAB PLUMBING
<br /> 8.9 3 TON ❑ USED)SHALL BE FURNISHED BY OWNER AND ❑ SHALL BE PVC.REFERENCE SPECIFICATIONS.
<br /> ® ALCOVE 1200 ❑ INSTALLED BY CONTRACTOR.RTU SHALL BE[SET ON
<br /> ETR _ _ \ 8"ETR O ETR CASH ❑ ROOF CURB.DO NOT SET RTU DIRECTLY ON ROOF.El26.LWATER PIPING ABOVE GRADE SHALL BE TYPE"L"
<br /> ISD ❑ COORDINATE RTU INSTALLATION WITH WALMART ❑ HARD DRAWN COPPER JOINED WITH WROUGHT rn
<br /> EAG L- I I I ❑ CONSTRUCTION MANAGER AND AES AS REQUIRED ❑ COPPER FITTINGS.MAKE JOINTS USING LEAD-FREE
<br /> ETR' ❑ FOR RTU/AHU CURB ADAPTERS. ❑ SOLDER AND A NON-CORROSIVE,PASTE-TYPE FLUX. 1p e
<br /> AP �/ MEN ❑ MAKE PIPING CONNECTIONS TO A FIXTURE WITH
<br /> CD CD OMEN 12"ETR ETR ETR �41EG
<br /> ETR 7:14.NOT USED. ❑ CHROME-PLATED SEAMLESS BRASS TUBE.INSULATE C
<br /> ❑ HOT&COLD WATER PIPING WITH RIGID GLASS FIBER U s
<br /> A 15.ECOORDINATE DUCTWORK WITH LIGHT FIXTURES. 0 A MINIMUM OF 1/2"THICK WITH WHITE ALL-SERVICE
<br /> AG CD 7 LIGHT FIXTURE LOCATIONS TAKE PRECEDENCE. ❑ JACKET(VAPOR RETARDER).AT CONTRACTOR'S
<br /> _ �� p1
<br /> ] FIELD VERIFY STRUCTURAL CONDITIONS BEFORE ❑ OPTION(U.N.0),IN LIEU OF COPPER WATER PIPING, F
<br /> ETR ETR r_____ ❑ FABRICATION OF DUCTWORK. ❑ PEX OR AQUATHERM PIPING MAYBE USED.REFER❑ Q a�
<br /> ❑ TO D SPECIFICATIONS.
<br /> NOMINAL PIPE SIZES SCHEDULE n �� c �
<br /> 16.LFUEXIBUE RELOCATDUCTCONNECTIONSTO NEW OR ❑ AND SPECIFICATIONS. y
<br /> ❑ RELOCATED DIFFUSERS AND GRILLES ARE
<br /> 12 13 ❑ PROHIBITED. ❑7 TYPE TRAPS AL P7IC ROTECTIONIMERS OR BARRIER-ON FLOOR DRAINS 00
<br /> G)�IITT
<br /> OFFICE AREA MECHANICAL DEMO PLAN 17.EDUCTSIZESSHOWNONDRAWINGSARENETFREE WHERE NOT OTHERWISE NOTED IF REQUIRED BY
<br /> ❑ AREA.CONTRACTOR'S OPTION,ROUND DUCTWORK ❑ LOCAL PLUMBING CODES.
<br /> ❑ OFEQUIVALENT FREEAREA MAYBE USED IN LIEU OF
<br /> ❑ RECTANGULAR.INCREASE RECTANGULAR SHEET 28.EFLOOR CLEANOUTS SHALL BE INSTALLED FLUSH
<br /> ❑ METAL SIZE AS REQUIRED FOR LINER.REFER TO❑ ❑ WITH FLOOR FINISH MATERIAL OR FLUSH WITH
<br /> ❑ SPECIFICATIONS ❑FOR THE INSULATION THICKNESS. CONCRETE SLAB IF NO FLOOR FINISH MATERIAL IS
<br /> ❑ CALLED OUT FOR ON ARCHITECTURAL DRAWINGS. O 0 Z
<br /> 7 7•V 18.EDUCT SUPPORT AND GRILLE DETAIL IS APPLICABLE O O O
<br /> ❑ THROUGHOUT THE STORE.DO NOT USE FASTENERS 29.LCUT AND PATCH EXISTING CONCRETE FLOOR SLAB
<br /> InmPICKUP 2 ❑ THAT PENETRATE ROOF DECK. ii FOR INSTALLATION OF NEW❑ PLUMBING PIPE.FLOOR CUTS SHALL BE STRAIGHT O 0 Q
<br /> FREEZER 15.705
<br /> M2 TYP 6.0 12"x12" '?ET
<br /> 1 - 1 2 13 9.TYPICAL BRANCH DUCT FITTING DETAIL IS ❑ AND CLEAN,REPLACE REMOVED SLAB WITH
<br /> z0"ETR .. ._ ❑ APPLICABLE THROUGHOUT THE STORE. ❑ CONCRETE FLUSH AND SMOOTH WITH ADJACENT N r
<br /> CD STORE AGi ❑ FLOOR SLAB.MATCH EXISTING CONSTRUCTION = Q O
<br /> P11 470 MANAGER 80 EXIST 20.dNSTALL ASSET TAGS ON ALL NEW RTUS,AHUS, ❑ REFERENCE SPEC SECTION 01721.COORDINATE (I) a
<br /> MOTHER'S ERAGTR i MEN ❑ EXHAUST FANS,AND SPLIT SYSTEMS❑'.ND ❑ WITH WALMART CONSTRUCTION MANAGER. � O
<br /> +72" 120 ETR EO f LAV I I I �11)1 Q �M
<br /> a 15.713 ROOM ETR ❑ COMPLETE THE DATA COLLECTION INFORMATION.
<br /> CO =--- -- - ___ - - - - - - [� I XIST ❑ DELETE DEMOED ASSETS FROM ASSET TAGGING 30.CCAP ALL PIPING OPENINGS DURING CONSTRUCTION O
<br /> �/ RFD' C C C ❑ APPLICATION.REFER TO SPECIFICATIONS. ❑ UNTIL FINAL CONNECTIONS TO EQUIPMENT AND W Z
<br /> \ AG ® XIS ❑ ACCESSORIES ARE MADE. W W
<br /> SAW � 12"x12" EAG CD7 ETR / yyC 15.425 W 0
<br /> 3/4"PUMPED D 100 12"0 ETR CDi ETR ETR CD7 RAG 15.448 TYP NEW SINKFURNISHED BY MILLWORK 31.m0 NOT INSTALL PIPING WITHIN COOLER PANELS. W W
<br /> DISCHARGE ETR gp OUNTI G ETR ETR TYP MODULAR PANEL MFG.INSTALLED BY Cl INSTALL EXPOSED PIPING IN PREP AREAS A MINIMUM N
<br /> DOWN TO PUMP RTU4 I GC.CONNECT TO EXISTING DWV AND ❑ OF 1/2"FROM PANEL WALL AND 6"ABOVE FINISHED
<br /> AG 6"O [JJ o
<br /> a ETR 3 TON EXIST WATER SERVICE, 15.406 15.436 ❑ FLOOR TO ALLOW FOR CLEANING.USE ONLY NOW co
<br /> 120 80 ETR I I I WC ❑ CORROSIVE MATERIALS FOR SPACERS AND
<br /> ® ETR ETDR EXIST ��IFDIST ❑ ANCHORS. W w
<br /> 0 AV / 32.LPROVIDE ESCUTCHEON PLATES FOR PLUMBING
<br /> PICKUP E R 1 ❑ PENETRATIONS THROUGH GROCERY CEILINGS AND
<br /> COOLER EG M2 _ MEN ❑ , ❑ WALLS.PROVIDE AIR TIGHT SEAL AROUND PIPING m
<br /> AP ETR ADJUST TOP OF EXISTING FD FLUSH / ❑ PENETRATIONS THROUGH COOLER/FREEZER WALLS O
<br /> EAG FFIC TYP CDi CD1 EG WITH EXISTING CONCRETE. ❑ AND CEILINGS.FINISH WITH ESCUTCHEON PLATE.
<br /> WOMEN ETR ETR 12"0 ETR ETR REPLACE FD WITH NEW IF EXISTING WOMENS
<br /> ETR FD CANNOT BE ADJUSTED FLUSH BREAKROOM 33.EPROVIDE HEAT TAPE AND INSULATION ON ALL WATER
<br /> CD WITH CONCRETE TYP. 15.450
<br /> ❑ AND DRAIN PIPING EXPOSED TO FREEZING. ISSUE BLOCK
<br /> OGP PLUMBING PLAN \ 550 34.❑NSTALL CONTINUOUS SEALANT JOINT AT ALL
<br /> a ETR Illr-- I ❑ EXTERIOR WALL PENETRATIONS.
<br /> TY 35.[INSTALL VTR'S A MINIMUM OF 24"FROM ROOF EDGE
<br /> ❑ AND/OR PARAPET WALLS AND A MINIMUM OF 10 FT
<br /> ❑ FROM OUTSIDE AIR INTAKE OF ROOFTOP UNITS.
<br /> FRONT OFFICE AREA MECHANICAL PLAN ��BREAKROOM PLUMBING PLAN 36.�ROMICZO EREQ REQUIREMENTS
<br /> ERSMA APPROPRIATE
<br /> G o ❑ SEISMIC ZONE REQUIREMENTS PER SMACNA
<br /> ❑ PUBLISHED SEISMIC DETAILS,LOCAL AND NATIONAL
<br /> ❑ CODES.CONTRACTOR'S RESPONSIBILITY INCLUDES
<br /> ❑ STRUCTURAL ENGINEER'S CERTIFICATION ON
<br /> ❑ DETAILS SUBMITTED FOR PERMITTING.
<br /> PRIOR TO STARTING DEMOLITION NENTS ABANDONED BY THE SCOPE
<br /> AND/OF FLOOR SINKS W EXPANDABLE DAB E MECHANICAL PLUG(SIMILAR INS 7 LAR ❑ OF WORK O WORK SHA UDING COMP
<br /> SECURED TO PREVENT FALLING,
<br /> TO CHERNE ECON-O-GRIP).AFTER WORK IN THE RESTROOMS AREA IS ❑ LOOSENING,OR CREATING DAMAGE OF ANY KIND IN
<br /> COMPLETE,THOROUGHLY CLEAN ALL DEBRIS FROM FLOOR DRAIN ❑ THE FUTURE.
<br /> EXIST AND/OR FLOOR SINK GRATES AND BODIES,CAMERA SCOPE FROM 1 2 3.1 4 5 6 7 7.6 8 9 1 11 12 13 14
<br /> EWC LOCATION OF WORK THROUGH SANITARY MAINS TO THE MANHOLE
<br /> 15448 OUTSIDE THE BUILDING.IF SANITARY LINES HAVE ANY OBSTRUCTIONS, KEYNOTES
<br /> HYDRO-JET LINES AS NEEDED TO CLEAR OBSTRUCTIONS.
<br /> -- CHECKED BY: JEE
<br /> OT ER'S 15.403 CONNECT TO EXISTING SANITARY PIPE OF
<br /> REPLACE OM FDI / / EQUAL OR LARGER SIZE.VERIFY SIZE, DRAWN BY: RGD
<br /> MOP SINK EXIST 15.429 \ 1 2 LOCATION,ELEVATION,AND FLOW DIRECTION AT
<br /> MECH SSi TYCP7 FAMILY M1 M1 SITE. PROTO: 90
<br /> 15.406 15.448 TOIL T EXIST RTU-22 TRAINING 15.405 PROPERLY CAP,PLUG AND CONCEAL ANY
<br /> EWC MANAGER PIPING LEFT IN PLACE.CAP ABANDONED SEWER PROTO CYCLE: 11/11/22
<br /> O ° EXIS 15.448 5 TON SUPPORT PIPING A MINIMUM OF 8"BELOW FINISHED
<br /> AV - - - - MEN - - F FLOOR.MATCH EXISTING FLOOR DOCUMENT DATE: 02/22I23
<br /> 5.448
<br /> ® ARCH TAND VENT
<br /> PLANS.IREMO E UNUSED
<br /> RTON WATER AND VENT PIPING ABOVE CEILING AND
<br /> O EXIST RTU-1 ® ® `" S TON CAP REMAINING PIPE.
<br /> FD4SS MEN ®5 TON RTU-18
<br /> WOMEN 15.429 UR RTU-17 STONy ---t ,RTU-20 15.406 PLUMBING CONTRACTOR TO MAKE ALL
<br /> FD4SS TYP3 10 TON RTU-19 5TON Mpi NECESSARY DISCONNECTS AND RECONNECTS
<br /> REPLACE FD 15 429 15.448 5 TON OF PLUMBING FIXTURES BEING RELOCATED OR
<br /> L17 WCO ® 0 O EXIST --r NEW.
<br /> FD4SS - Fm - _ - - HALLWAY WOMEN BREAKROOM 15.425 REMOVE CONCRETE CLOSE TO RIM OF EXISTING
<br /> 15429 - -ETR WCO \ /"1 / FCO
<br /> \ 1 ETR �/ EXIST � � E FLOOR CLEANO.I CONTACTOR SHALL BID TO
<br /> ADJUST TOP OF FLOOR CLEAN OUT FLUSH WITH
<br /> FD4SS 15.425 FINISHED FLOOR.IF FLOOR CLEANOUT CANNOT NOT FO R
<br /> Pi REPLACE LAVATORY(TYP 2) ❑ RTU-14 BE ADJUSTED FLUSH WITH FINISHED FLOOR,
<br /> 15.429 7yp RTU-15
<br /> PROVIDE BRANCH WASTE AND VENT EXIST CO N ST R U CT I O N�T P 5 RTU-12 O RTU-13 ❑ AHU-2 5 TON 5 TON REPLACE EXISTING FLOOR CLEANOUT WITH NEW
<br /> PIPING IN WALL AS REQUIRED FOR- FCO PICKUP
<br /> LOWER 10 TON 10 TON 800 MBH ❑® DIFFERENCE.
<br /> AND SUBMIT CHANGE ORDER FOR WORK
<br /> EXIST WCO INDIVIDUAL P-TRAPS AT EACH BASIN. STORAGE DIFFERENCE.
<br /> TO 15.406 15.436 ADJUST TOP OF XISTING FD FLUSH / 15.429 CUT AND PATCH EXISTING CONCRETE FLOOR
<br /> 5 gOgg APPRON BELOW ® WITH EXISTING CONCRETE.REPLACE FREEZER _ AC SLAB FOR INSTALLATION OF NEW
<br /> TYP FD WITH NEW IF EXISTING FD CANNOT O EXIST 1 UNDERGROUND PLUMBING PIPE.MATCH
<br /> FRONT RESTROOM PLUMBING PLAN BE ADJUSTED FLUSH WITH CONCRETE FCO I I EXISTING CONSTRUCTION AND FINISHES.
<br /> 4 1/8„=itp^ - - =TYP. 15.450 - - - - - - 3_ D 15.436 REPLACE SINK AND ASSOCIATED TRIM.
<br /> RTU-11 ❑ CONTRACTOR SHALL FIELD VERIFY COOLER I M2 INCLUDING THE FAUCET,TAILPIECE,P-TRAP,
<br /> TENANT SPACE WHERE FLOOR FINISH IS SUPPLY LINES,AND SHUT-OFF VALVES.
<br /> PRIOR TO STARTING DEMOLITION WORK,PLUG ALL FLOOR DRAINS ADJUST TOP OF EXISTING FCO FLUSH 10 TON BEING REMOVED TO CONVERT TO - 15.442 TRENCHING AND BACKFILL BY GC,REF ARCH
<br /> 1 2 AND/OR FLOOR SINKS UNDER REFRIGERATED CASES TO BE REPLACED WITH EXISTING CONCRETE.REPLACE
<br /> WITH EXPANDABLE MECHANICAL PLUG(SIMILAR TO CHERNE ECON-O-GRIP). FCO WITH NEW IF EXISTING FCO CANNOT FINISHED CONCRETE.ADJUST EXISTING PLANS.COORDINATE WITH GC FOR
<br /> AFTER WORK IN THE AREA IS COMPLETE,AND PRIOR TO SETTING NEW RTU-10, FD'S AND FCO'S AS NEEDED TO BE INSTALLATION SCHEDULE.
<br /> Ip1 BE ADJUSTED FLUSH WITH CONCRETE. FLUSH WITH FINISH FLOOR.
<br /> REFRIGERATED CASES,THOROUGHLY CLEAN ALL DEBRIS FROM FLOOR 5 TON 7 15.448 PLUMBING CONTRACTOR TO MAKE ALL
<br /> EXIST
<br /> DRAIN AND/OR FLOOR SINK GRATES AND BODIES,REMOVE PLUG AND O MPi NECESSARY DISCONNECTS AND RECONNECTS
<br /> \ 15.403 HYDRO-JET EACH FLOOR DRAIN AND/OR FLOOR SINK TO THE MAIN. � FCO 0 OF PLUMBING FIXTURES FOR FINISHES WORK.
<br /> CAMERA SCOPE MAIN LINE TO CONFIRM LINE IS CLEAR.IF MAN LINE HAS ANY RTU-S PROVIDE CONTINUOUS SEALANT ALONG THE
<br /> 0\\\I OBSTRUCTIONS,COORDINATE SOW WITH CM AS AN ADDITIONAL SERVICE. - -10 TON _ _ EDGES OF RECONNECTED FIXTURES.
<br /> 7 �� T FFFFFFFFFFFFFFFFF � - - - * O EXIST - t - - - - REFURBISH URINAL AND WC FLUSH VALVES TO
<br /> 3 u 910TON
<br /> RTU-7 FCO IFE
<br /> p LIKE NEW OPERATING CONDITION.
<br /> V \ - 4"SS ETR__ yyyyywww�vy yyyyyyy yyyy a
<br /> ^^ ALL REFRIGERATED 2�2�F 1 2 RTU-9 3/4"DRAIN LINE OVERHEAD,IN 15.450 REMOVE CONCRETE CLOSE TO RIM OF EXISTING
<br /> ® 15.442 CASE DRAIN OUTLETS :- MPHI MPH1 20 TON ROOF JOISTS.SLOPE 1/8"PER FLOOR DRAIN.CONTRACTOR SHALL BID TO
<br /> T EXIST EXIST FOOT TOWARD DISCHARGE POINT. ADJUST TOP OF FLOOR DRAIN FLUSH WITH
<br /> SHALL BE 2"IN SIZE. EXIST
<br /> 3"SS -AHU-1 FCO FCO FCO FINISHED FLOOR.IF FLOOR DRAIN CANNOT BE
<br /> 2 `m DEMO FD S00 MBH
<br /> 15.405 ADJUSTED FLUSH WITH FINISHED FLOOR,
<br /> P7 FD3 ALL REFRIGERATED T FIRE REPLACE EXISTING FLOOR DRAIN WITH NEW
<br /> 7 7+ CASE DIMENSIONS ARE PUMP PU PED DISCHARGE AND SUBMIT CHANGE ORDER FOR WORK
<br /> FROM EDGE OF CASE -"-"-" _ RTU-6-------- (PHARMACY DOWN TIGHT TO WALL DIFFERENCE.
<br /> 3TON
<br /> TO CENTER OF DRAIN. CCCJJJ CCCJJJ HOUSE
<br /> � rr RTU-4 15.705 CONNECT TO EXISTING SUPPLY/RETURN SE CE L JANITOR 3TON _ _ _ _ _ DUCTWORK INDICATED.
<br /> DEL - !RTU-2 I I -� I I
<br /> 15.713 REBALANCE AIR DEVICE TO CFM SHOWN.
<br /> r1 o FD TURNDOWN REDISTRIBUTE AIR FROM EXISTING DUCTWORK
<br /> RTU-1,1 0 [ e RTU-5 4 ETR DISCHARE OVER FD, TO MATCH NEW CFM REQUIREMENTS.
<br /> 1't.LAI j RTU-3 I� 3TON MP1 � MAINTAIN AIR GAP. A MECHANICAL
<br /> CCU C 570N - ❑W❑O❑MEN`' MEN- - ° °- ° ° - - - - AND
<br /> PLUMBING
<br /> r r o
<br /> MP1 5 6
<br /> MPi MP1 PLAN
<br /> o MECHANICAL AND PLUMBING PLAN
<br /> A I 1"=30'-0"
<br /> EXISTING CONDITIONS WERE TAKEN FROM EACH SUBCONTRACTOR IS RESPONSIBLE FOR HAVING
<br /> ORIGINAL DRAWINGS AND MAY NOT REFLECT A THOROUGH KNOWLEDGE OF ALL DRAWINGS AND
<br /> EXACT"AS-BUILT"CONDITIONS.CONTRACTOR SPECIFICATIONS IN THEIR RELATED FIELD.THE FAILURE
<br /> SHALL FIELD VERIFY ALL EXISTING CONDITIONS TO ACQUAINT THEMSELF WITH THIS KNOWLEDGE DOES
<br /> FRONT GROCERY PLUMBING PLAN PRIOR TO SUBMITTING FINAL BIDS.CONTRACTOR NOT RELIEVE THE RESPONSIBILITY OF PERFORMING
<br /> SHALL CAREFULLY COORDINATE NEW WORK AND THE WORK PROPERLY.NO ADDITIONAL SHEET
<br /> DEMOLITION WITH ALL OTHER DISCIPLINES AND COMPENSATION SHALL BE ALLOWED BECAUSE OF M P 1
<br /> EXISTING CONDITIONS. CONDITIONS THAT OCCUR DUE TO FAILURE TO
<br /> FAMILIARIZE WORKERS WITH THIS KNOWLEDGE.
<br />
|