My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2326 MCDOUGALL AVE 2025-09-12
>
Address Records
>
MCDOUGALL AVE
>
2326
>
2326 MCDOUGALL AVE 2025-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2025 8:57:19 AM
Creation date
8/27/2025 11:00:37 AM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
2326
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPLETE IF USING INFILTRATION (2A or 2B) TO MEET FLOW <br /> CONTROL REQUIREMENT <br /> Determine whether infiltration has been pre-determined to be infeasible for any portion of your <br /> project site. <br /> ■ Review the infiltration infeasibility mapping tool available on "Map Evereff <br /> . everettwa.gov/mapeverett. <br /> ■ On the mappingtool,select"Geotechnical/I nfiltration Infeasibility Area"and the <br /> applicable"Property"layers from the Layer List. <br /> ■ Zoom into your project site and printthe resulting map to showthe project site <br /> boundaries and the infiltration infeasibility mapping results. <br /> ■ Areas mapped as red have been pre-determined to be infeasible for infiltration. <br /> ■ Areas mapped as green are potentially feasible for infiltration and must be <br /> assessed further for infiltration feasibility,as discussed further below. <br /> 0 ■ Attach a printed copy of the map clearly showing your project site boundary and the <br /> infiltration infeasibility mapping results. <br /> * If you selected Downspout Full Infiltration (2A), submit I and 2 below. <br /> If you selected Rain Garden/Bioretention (2113), on-site soils information for sizing is <br /> required from I through 3 below. <br /> Submit the following information to Permit Services with this report: <br /> . A USDA Custom Soil Report from https://websoilsurvey.sc.egov.usda.gov <br /> 2. USDA Soil Type(s)= <br /> 3. Measured Infiltration Rate = in/hr, measured at BMP location on-site. Use Rain Garden <br /> Handbook methodology for infiltration test. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 20 <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.