Laserfiche WebLink
Y <br /> DONE! <br /> You have now completed the Small Project Stormwater Report. <br /> Please review any sections you may have skipped to ensure all areas have been completed. <br /> Ensure the following attachments have been added: <br /> ❑ Project Specific Stormwater Site Plan <br /> ❑ Topographic Survey <br /> ❑ Declaration of Covenant and Grant of Easement <br /> ❑ Construction SWPPP Drawings <br /> ❑ Underground Injection Well(UIC)Registration* <br /> *You mayneed to register with the Washington State Department of Ecology at least 60 <br /> days prior to commencing UIC Construction.For more information, visit: <br /> e verettwa.gov/1985/Stormwater-Technical-Resources <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 22 <br /> the Combined Sewer Area-April 2021 <br />