My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 9:02:28 AM
Creation date
8/28/2025 8:59:29 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />2025 TDP – FINAL DRAFT 5 <br /> <br />EMPLOYEES <br />As of January 2025, the Transit Division was authorized to employ 160.6 full-time equivalents allocated to the <br />following sections: <br /> <br />Fixed-Route: 117.6 (1 unfilled as of Jan. 2025) <br />Demand Response: 30 (3 unfilled as of Jan. 2025) <br />Everett Station: 13 (1 unfilled as of Jan. 2025) <br /> <br /> <br />The Organization Chart below depicts the staffing levels and distribution as of January 2025: <br /> <br /> <br />OFFICES & FACILITIES <br />Everett Transit has the following office and facility locations: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Administrative Offices <br />3201 Smith Ave., Suite 200 <br />Everett, WA 98201 <br /> <br /> <br /> <br />Operations Center <br />3225 Cedar St. <br />Everett, WA 98201 <br /> <br /> <br />Maintenance Facility <br />3227 Cedar St. <br />Everett, WA 98201 <br />Everett Station <br />3201 Smith Ave. <br />Everett, WA 98201 <br />College Station <br />2200 Tower St. <br />Everett, WA 98201 <br />Mall Station <br />1330 SE Everett Mall Way <br />Everett, WA 98204
The URL can be used to link to this page
Your browser does not support the video tag.