My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4614 COLBY AVE 2025-09-09
>
Address Records
>
COLBY AVE
>
4614
>
4614 COLBY AVE 2025-09-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 2:23:33 PM
Creation date
8/29/2025 2:23:33 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4614
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID:24F4D92F-AOF1-464F-B60B-F16AO31867A7 <br /> Raising the Roof A <br /> on Quality and Service •� NBA <br /> BBB <br /> I I iol <br /> MASTER BUILDERS <br /> E-� <br /> -JOB PREPARATION: Our Production team will communicate with you regarding the arrival of the dumpster <br /> to your home,which will be before the job begins.When our crew arrives,our Site Foreman assess how to best <br /> cover and protect the perimeter of your home before removal begins. <br /> -EXISTING ROOF REMOVAL: Completely tear off TWO layers of existing roofing and all underlayment,and properly <br /> recycle all of the old material.Additional costs will apply for removal of all additional layers of roofing.We will also <br /> inspect inside all viewable attic areas for possible pest problems, structural damage,or other possible concerns. <br /> -ROOF DECK PREPARATION: Inspect the plywood sheeting or skip sheeting for defects and/or rot issues,and <br /> drive in all existing fasteners left over from the tear off. <br /> -ROOF SHEETING:Elite Roofing will install 1/2" CDX plywood substrate over existing <br /> skip sheathing. 1/2"cDxPlywood - <br /> \71111111111111 -�� <br /> -UNDERLAYMENT:We install Defender synthetic underlayment to the roof deck. <br /> -ICE AND WATERSHIELD:We will install Certainteed Grace Select ice and water shield <br /> loop" around all roof penetration,behind all chimneys and skylights,and under all valleys for additional leak <br /> -� protection. <br /> GENERAL FLASHING SPECIFICATIONS:All of our metal flashings are 26 Gauge steel <br /> with an enamel finish that is baked on. Standard colors used to best match the roof <br /> system are brown or black. Copper or stainless steel and other colors are also available. <br /> -PERIMETER FLASHING:We will install a 1"x3"Hemmed Starter Metal on all gutter <br /> edges. We will then install.2 1/2"xl"xl" "D" Metal to all rake edges of the roof. These <br /> "D"Metal Standard OW1.1 protect the fascia,rafters,and roof deck from moisture. <br /> -STEP FLASHING:New step flashing will be installed over each course of roofing,and tucked <br /> „T y:t._ {,• under the siding. It is standard that we will have to pull nails to remove the old metal step flashing, <br /> and facilitate the installation of the new metal.Although we will be as careful as possible,if the <br /> siding is damaged,we will make the necessary repair at a time and materials cost basis. <br /> Signed by: r—DocuSigned by: <br /> DATE_3/17/2025 `F `"'" 'tfi Roofing-John Tracy <br /> PO Box 12721 425-482-0676 PAGE 1 <br /> Mill Creek,WA98082 www.ElitePoofNW.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.