Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />PW 14-ASPHALT <br />4/9/2025 <br />4/9/2025 <br />SUBGRADE <br />JIM KNAPPERT <br />PARTIAL <br />APPROVAL <br />EVALUATION <br />Notes: <br />Regrading alley. <br />PW 14-ASPHALT <br />4/10/2025 <br />4/10/2025 <br />SUBGRADE <br />JIM KNAPPERT <br />PARTIAL <br />APPROVAL <br />EVALUATION <br />Notes: <br />removing asphalt from alley. <br />PW 14-ASPHALT <br />4/14/2025 <br />F4/14/2025 1AM <br />SUBGRADE <br />Andy Erickson <br />PARTIAL <br />APPROVAL <br />EVALUATION <br />Notes: <br />Grading alley for asphalt paving <br />PW 18-CURB OR <br />4/15/2025 <br />4/15/2025 <br />SIDEWALK <br />Andy Erickson <br />PARTIAL <br />APPROVAL <br />SUBGRADE <br />Notes: <br />Pouring sidewalk radius on NE corner of site. ADA ramps ok, ok to make sidewalk grades work with existing conditions. <br />PW 14-ASPHALT <br />4/16/2025 <br />4/16/2025 0AM <br />SUBGRADE <br />Andy Erickson <br />PARTIAL <br />APPROVAL <br />EVALUATION <br />Notes: <br />Paving alley <br />PW 18-CURB OR <br />4/16/2025 <br />4/16/2025 0AM <br />SIDEWALK <br />Andy Erickson <br />PARTIAL <br />APPROVAL <br />SUBGRADE <br />Notes: <br />Continued work on frontage sidewalk and radius <br />4/18/2025 <br />4/18/2025 <br />PW 15-ASPHALT <br />Andy Erickson <br />APPROVAL <br />PAVING FINAL <br />Notes: <br />asphalt paving complete <br />PW 04- <br />4/23/2025 <br />4/23/2025 <br />CLEARING/GRADIN <br />JIM KNAPPERT <br />APPROVAL <br />G <br />Notes: <br />Hauling out excess material from future site. <br />NPDES MID <br />4/24/2025 <br />4/24/2025 <br />PROJECT <br />JIM KNAPPERT <br />APPROVAL <br />INSPECTION <br />Notes: <br />APPROVED: All 13 Elements for Construction SWPPP compliance have been adequately addressed and are installed correctly, and are being maintained <br />correctly. <br />I <br />Printed: Tuesday, 19 August, 2025 7 of 9 rk <br />SUPERION <br />