My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3322 BROADWAY COMPASS HEALTH 2025-10-03
>
Address Records
>
BROADWAY
>
3322
>
COMPASS HEALTH
>
3322 BROADWAY COMPASS HEALTH 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 3:03:26 PM
Creation date
9/3/2025 7:38:51 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3322
Tenant Name
COMPASS HEALTH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
997
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />PW 04- <br />4/24/2025 <br />4/24/2025 <br />CLEARING/GRADIN <br />JIM KNAPPERT <br />APPROVAL <br />G <br />Notes: <br />Removing all excess material from future site. <br />5/2/2025 <br />5/2/2025 <br />PW 19-CURB OR <br />JIM KNAPPERT <br />APPROVAL <br />SIDEWALK FINAL <br />Notes: <br />All concrete poured. <br />5/9/2025 <br />5/9/2025 <br />PW 22-OTHER <br />JIM KNAPPERT <br />APPROVAL <br />Notes: <br />Painting parking and fog lines. <br />PW 04- <br />5/13/2025 <br />5/13/2025 <br />CLEARING/GRADIN <br />JIM KNAPPERT <br />APPROVAL <br />G <br />Notes: <br />Next phase is graded and ready for topsoil and hydro seeding. <br />5/21/2025 PM <br />1 5/21/2025 PM <br />PLNG - <br />Dustin Gray <br />APPROVAL <br />sending bond info. okay to final. <br />LANDSCAPING <br />Notes: <br />PW 25-SITE <br />5/22/2025 <br />5/22/2025 <br />FINAL/PERMIT <br />JIM KNAPPERT <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />CLOSE OUT <br />Notes: <br />5/9/2025 10:29 AM Lilly Knapp <br />Contact Name: Lilly Knapp <br />Site Address: 3322 BROADWAY <br />Phone:4259857329 <br />e-Mail: Lilly.Knapp@BNBuiIders.com <br />Need to fill planter boxes with soil for next phase. Replace vaned grate with solid lid. Install rod and handle for sheer gate. <br />6/12/2025 <br />F6/12/2025 <br />PW ASBUILTS <br />JIM KNAPPERT <br />APPROVAL <br />SUBMITTED <br />Notes: <br />6/16/2025 <br />6/16/2025 <br />PW ASBUILTS <br />JIM KNAPPERT <br />APPROVAL <br />SUBMITTED <br />Notes: <br />I <br />Printed: Tuesday, 19 August, 2025 8 of 9 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.