Element 5: Stabilize Soils (2.1.5) <br />West of the Cascade Mountains Crest <br />Season <br />Dates <br />Number of Days Soils Can <br />be Left Exposed <br />During the Dry Season <br />May 1 — September 30 <br />7 days <br />During the Wet Season <br />October 1 — April 30 <br />2 days <br />Soils must be stabilized at the end of the shift before a holiday or weekend if needed based on <br />the weather forecast. <br />Anticipated project dates: Start date: 8/1/2022 End date: 8/1/2023 <br />Will you construct during the wet season? <br />Yes <br />List and describe BMPs: BMP C121, Mulching: During construction, mulch can be <br />placed to prevent raindrops from impacting exposed soils causing erosion. Straw is the <br />most common method of mulching. <br />BMP C107, Construction Road/Parking Area Stabilization: The staging area will be <br />stabilized with rock (pulverized concrete). Foundations and walkways will be stabilized <br />with the base course of rock. <br />BMP C123, Clear Plastic Covering: This involves covering a bare area with clear plastic <br />that protect it from erosion from rainfall. This BMP will be used on this site to provide <br />cover of temporary stockpiles. <br />Installation Schedules: In planting areas the exposed soils will be stabilized per BMPs C121, <br />C123. In paved areas the soils will be stabilized by the placement of the rock base course as <br />part of C107. Temporary stockpiles will be mulched, seeded or covered with plastic. <br />Inspection and Maintenance plan: These measures will be implemented throughout the site <br />construction until exposed surfaces are finally stabilized. <br />Responsible Staff: CESCL and Contractor <br />