Laserfiche WebLink
Element 8: Stabilize Channels and Outlets (2.1.8) <br />Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br />adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all <br />conveyance systems. <br />List and describe BMPs: BMP C201 Temporary Surface Channel: Installed south end of the <br />Phase 3 construction and staging area. The surface channels convey the runoff to the site <br />discharge point into the combined sewer system. <br />Installation Schedules: Install after the existing building has been demolished. <br />Inspection and Maintenance plan: Regularly check channel for debris and clear blockages. <br />Responsible Staff: CESCL and Contractor <br />