My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS <br /> Backflow Excessive amounts of water Check discharge check Valve repaired or <br /> Valves flows back into wetwell valve or duckbill at end replaced so that only a <br /> when pump shuts off. of pipe for debris or small amount of water <br /> damage clean or replace flows back into <br /> wetvault after pump <br /> shutoff. <br /> Shutoff Closing valve(s)does not Inspect valve for proper Valves are replaced <br /> Valves stop flow when pumps are seat movement replace and fully operational. <br /> turned on. valve if defective <br /> Valve handle missing or Check valve stem Handle repaired or <br /> Valve Vault inoperable. condition replace handle replaced. <br /> or valve <br /> Pressure Gauge is broken or missing. Gauge is replaced and <br /> Gauges(if functional. <br /> present) <br /> Gauge does not register Remove valve open port Gauge is repaired or <br /> change in pressure after to check for water replaced and registers <br /> pump on,shutoff valve pressure,check with pressure change with <br /> closure. known good gauge, <br /> replace if faulty pump operation or <br /> valve shutoff. <br /> Operations Operations and A copy of the manual Operations and <br /> Manual maintenance manual is not should be available to maintenance manual is <br /> on site or readily available, maintenance and onsite and readily <br /> or materials are missing. operation personnel available,and includes <br /> information on all <br /> Documentation components including <br /> catalog cuts,part <br /> numbers, <br /> manufacturer's <br /> recommended <br /> rocedures,etc. <br /> No. 26—Private Stormwater Pumps(Continued) <br /> Pump(font.) Operations Operations and When equipment or Operations and <br /> Manual maintenance manual does operating procedures maintenance manual is <br /> (Cont.) not reflect updates or changes to manual should up to date with <br /> changes to the system such be updated in reasonable information for <br /> as pump replacement or time equipment currently <br /> control panel modifications. installed <br /> Control Wiring Schematic is not An accurate copy of Wiring schematic is <br /> Panel present in control panel. wiring should be present in control <br /> available to maintenance panel. <br /> and operation personnel <br /> Pump operation labels Replace illegible labels Labels are present and <br /> missing or unreadable. readable. <br /> No information regarding Place personnel contact Contact information is <br /> contacts in case alarm is sheet in control posted on exterior for <br /> tripped during off hours. documents. 24 hour contact in case <br /> of alarm. <br /> STORM AND SURFACE WATER 4-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.