Laserfiche WebLink
NRFROMRAFFIC k —TRUCK TRAFFIC— NORTH EBEY �k KEY NOTES <br /> OUT TO NORTH <br /> TRUCK TRAFFIC O THE MAJORITY OF THE SITE WAS BACKFILLED <br /> —— TO AND FROM <br /> -- ' I-5 BOTH DIRECTIONS WITH APPROXIMATELY 1 TO 5 FEET OF SAND <br /> NORTN AVENUE �, STD BACKFILL IN FALL 2020 DURING THE 2ND <br /> ❑ PRIEST 9G� <br /> INTERIM ACTION CLEANUP. THE CONTRACTOR <br /> 11 POINT BO NORTH EBEY SHALL BE AWARE THAT THERE IS THE <br /> 8 9TS�0 POTENTIAL THAT SOME CONSTRUCTION <br /> SMITH ISLAND G2 SOH EQUIPMENT OR TRUCKS MAY EXPERIENCE <br /> POOR TRACTION OR GET STUCK DRIVING OVER <br /> _ 111 N THE EXISTING SAND IN PORTIONS OF THE <br /> /OHAUL <br /> EX SITE. SEE SPECIFICATIONS FOR ADDITIONAL <br /> NORTH SPENCER INFORMATION. <br /> ROAD IL NORTH \ _ = BIRINGER FARM MID <br /> 0 SITE EBEY O2 SEPARATE PRELOAD CONTRACT WILL LEAVE A <br /> GRAVEL HAUL ROAD FROM FEDERAL AVENUE <br /> f m TO THE PRELOAD THAT WILL BE AVAILABLE <br /> JETTY <br /> O LAND FOR USE BY T GRAVEL ROAD ALSO CONTRACTOR. TING <br /> ALSOAV AVAILABLE AT THE <br /> PORT GARDNER I ' W I - - C NORTH END. <br /> EAST WATERWAY 11 i � �y POINT O3 MID UNLESS OTHERWISE SHOWN OR APPROVED BY <br /> C� F� THE ENGINEER, THE CONTRACTOR SHALL <br /> x x C O JF SyO PENCE LOCATE ALL STOCKPILES AND THEIR <br /> CONSTRUCTION TRAILER WITHIN THE WORK <br /> MAULSBY MAULSBY s AREA LIMITS SHOWN. SEE SHEET C1.1 FOR <br /> x N O MUD SWAMP FURTHER REQUIREMENTS. <br /> G <br /> EX / Q ID FLAT <br /> W A OTTER ISLAND <br /> Y • I' z o z - ® CONTRACTOR MAY SHARE CONSTRUCTION <br /> BARGE Z n BOAT N <br /> ' K � -_ � � „ ACCESS POINTS WITH OTHER CONTRACTORS. <br /> DOC <br /> ©PRELOAD AREA JETTY RAMP 1 �� ISLAND UNION SEE SHEET G5.1 AND SPECIFICATIONS FOR <br /> I SLOUGH FURTHER DETAILS. <br /> Q BERM <br /> li 12th z <br /> 1 STREET O CONTRACTOR SHALL PROVIDE TRAFFIC <br /> 1 MARINA SOUT EBEY CONTROL AND MAINTAIN ONE LANE OF <br /> i 1 TRAFFIC DURING ALL WORK WITHIN THE <br /> MARINA FEDERAL AVENUE ROW. THIS WILL BE <br /> EVERETT REQUIRED TO MAINTAIN ACCESS TO EXISTING <br /> I <br /> 1 EBEY TENANTS ALONG FEDERAL AVENUE EVERETT <br /> 3 II <br /> SLOUGH PROJECT PROJECT SITESHIP REPAIR, DUNLAP AND MAIN TERMINAL <br /> UUUc NAVAL SOUTH ST. SOUTH SPE CER TRAFFIC) AND OTHER CONSTRUCTION <br /> SITE STATION <br /> EVERETT STEAMBOAT PROJECTS AS SHOWN. <br /> SLOUGH © CONTRACTOR SHALL PROVIDE ACCESS TO <br /> O HAUL o ,n PORT SURVEYORS TO THE SETTLEMENT <br /> 0 <br /> ROAD U C, I MONITORING POINTS ON THE PRELOAD <br /> z m FOOTPRINT BETWEEN SEPTEMBER 2021 AND <br /> o a�Z DEADMAN J MARCH 2O22. <br /> SLOUGH <br /> EVERETT O7 CONTRACTOR CAN UTILIZE EXISTING NORTH <br /> CONSTRUCTION ACCESS SHOWN ON SHEET <br /> P3 MA SB C1.1 FOR THE MAJORITY OF THE PROJECT <br /> w�w _ FEDERAL �Q5 HEWITT UNTIL DIRECTED BY ENGINEER TO UTILIZE THE <br /> HWY 2 <br /> NAVIGATION A O FEDERAL NEW NORTH GATE ALIGNMENT. <br /> CHANNEL PACIFIC <br /> ® NO CONTRACTOR TRAFFIC QUEUING IS <br /> LL r TRUCK TRAFFIC �� > I DEADWATER <br /> ALLOWED ON EITHER TERMINAL AVENUE OR <br /> OUT TO NORTH <br /> a SLOUGH FEDERAL AVENUE. <br /> G,oJ�PO� w � <br /> EX WAREHOUSE TRUCK TRAFFIC <br /> SOUTH I FROM 1-5 �i TRUCK TRAFFIC <br /> GATE SOUTHBOUND TO -5 <br /> NORTHBOUND <br /> -x� _ VERETT AVENUE <br /> @(D@ FEDERAL AVENUE SP 41ST E LOWELL <br /> G MDK�V�ED <br /> TRUCK TRAFFIC IN FROM / W TRUCK TRAFFIC <br /> NORTH AND SOUTH / OUT TO SOUTH <br /> z PIGEON Q <br /> CREEK <br /> Q W <br /> MUKILTEO BLVD. <br /> TRUCK TRAFFIC <br /> MAIN MARINE W o FROM 1-5 <br /> TERMINAL TRAFFIC Z PIGEON No. 1 TRUCK TRAFFIC NORTHBOUND <br /> TERMINAL AVENUE® CREEK C'a TO 1-5 <br /> No. 2 o SOUTHBOUND <br /> i <br /> SITE ACCESS PLAN TRUCK HAUL ROUTES z <br /> SCALE: 1" = 200' SCALE: 1" = 2000' RECORD DRAWING IF SHEET LESS THAN 22 <br /> REDUCE SCC ALE ACCORDINGLY <br /> Q <br /> PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. NO. G4 1 <br /> RECORD CONDITIONS N. WATSON AS SHOWN Q <br /> Port of ILANSREFLECTATED IN THESE NORTON TERMINAL DEVELOPMENT • <br /> DESIGNED BY: DATE: <br /> INFORMATION <br /> ATIO T J. BECKER 06/21/2021 CIP NO. <br /> EVERETT INFORMATION -8-900-05 O <br /> PROVIDED BY THE DRAWN BY: CHECKED BY: & MTCA 3RD INTERIM ACTION <br /> 16015th Avenue,Suite 1300 o7/D5/2o23 NW RECORD DRAWING RECORD K. EDWARDS, D. YU N. WATSON PROJECT <br /> P,0. BOX 538 Seattle,Washington98101 CONTRACTOR. APPROVED BY: SITE ACCESS AND STOCKPILE PLAN NO. MT-NT-2021-02.2 C� <br /> EVERETT, WA sa2os ® 06/21/2021 NW ISSUED FOR BID CONDITIONS WERE NOT W <br /> EVER) T WA 4 (206)382-0600 Fax(206)382-0500 .VERIFIED BY ENGINEER <br /> PROJECT NO.1600120 No. DATE BY REVISION No. DATE BY REVISION SHEET NO. 09 OF 150 <br />