My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NRFROMRAFFIC k —TRUCK TRAFFIC— NORTH EBEY �k KEY NOTES <br /> OUT TO NORTH <br /> TRUCK TRAFFIC O THE MAJORITY OF THE SITE WAS BACKFILLED <br /> —— TO AND FROM <br /> -- ' I-5 BOTH DIRECTIONS WITH APPROXIMATELY 1 TO 5 FEET OF SAND <br /> NORTN AVENUE �, STD BACKFILL IN FALL 2020 DURING THE 2ND <br /> ❑ PRIEST 9G� <br /> INTERIM ACTION CLEANUP. THE CONTRACTOR <br /> 11 POINT BO NORTH EBEY SHALL BE AWARE THAT THERE IS THE <br /> 8 9TS�0 POTENTIAL THAT SOME CONSTRUCTION <br /> SMITH ISLAND G2 SOH EQUIPMENT OR TRUCKS MAY EXPERIENCE <br /> POOR TRACTION OR GET STUCK DRIVING OVER <br /> _ 111 N THE EXISTING SAND IN PORTIONS OF THE <br /> /OHAUL <br /> EX SITE. SEE SPECIFICATIONS FOR ADDITIONAL <br /> NORTH SPENCER INFORMATION. <br /> ROAD IL NORTH \ _ = BIRINGER FARM MID <br /> 0 SITE EBEY O2 SEPARATE PRELOAD CONTRACT WILL LEAVE A <br /> GRAVEL HAUL ROAD FROM FEDERAL AVENUE <br /> f m TO THE PRELOAD THAT WILL BE AVAILABLE <br /> JETTY <br /> O LAND FOR USE BY T GRAVEL ROAD ALSO CONTRACTOR. TING <br /> ALSOAV AVAILABLE AT THE <br /> PORT GARDNER I ' W I - - C NORTH END. <br /> EAST WATERWAY 11 i � �y POINT O3 MID UNLESS OTHERWISE SHOWN OR APPROVED BY <br /> C� F� THE ENGINEER, THE CONTRACTOR SHALL <br /> x x C O JF SyO PENCE LOCATE ALL STOCKPILES AND THEIR <br /> CONSTRUCTION TRAILER WITHIN THE WORK <br /> MAULSBY MAULSBY s AREA LIMITS SHOWN. SEE SHEET C1.1 FOR <br /> x N O MUD SWAMP FURTHER REQUIREMENTS. <br /> G <br /> EX / Q ID FLAT <br /> W A OTTER ISLAND <br /> Y • I' z o z - ® CONTRACTOR MAY SHARE CONSTRUCTION <br /> BARGE Z n BOAT N <br /> ' K � -_ � � „ ACCESS POINTS WITH OTHER CONTRACTORS. <br /> DOC <br /> ©PRELOAD AREA JETTY RAMP 1 �� ISLAND UNION SEE SHEET G5.1 AND SPECIFICATIONS FOR <br /> I SLOUGH FURTHER DETAILS. <br /> Q BERM <br /> li 12th z <br /> 1 STREET O CONTRACTOR SHALL PROVIDE TRAFFIC <br /> 1 MARINA SOUT EBEY CONTROL AND MAINTAIN ONE LANE OF <br /> i 1 TRAFFIC DURING ALL WORK WITHIN THE <br /> MARINA FEDERAL AVENUE ROW. THIS WILL BE <br /> EVERETT REQUIRED TO MAINTAIN ACCESS TO EXISTING <br /> I <br /> 1 EBEY TENANTS ALONG FEDERAL AVENUE EVERETT <br /> 3 II <br /> SLOUGH PROJECT PROJECT SITESHIP REPAIR, DUNLAP AND MAIN TERMINAL <br /> UUUc NAVAL SOUTH ST. SOUTH SPE CER TRAFFIC) AND OTHER CONSTRUCTION <br /> SITE STATION <br /> EVERETT STEAMBOAT PROJECTS AS SHOWN. <br /> SLOUGH © CONTRACTOR SHALL PROVIDE ACCESS TO <br /> O HAUL o ,n PORT SURVEYORS TO THE SETTLEMENT <br /> 0 <br /> ROAD U C, I MONITORING POINTS ON THE PRELOAD <br /> z m FOOTPRINT BETWEEN SEPTEMBER 2021 AND <br /> o a�Z DEADMAN J MARCH 2O22. <br /> SLOUGH <br /> EVERETT O7 CONTRACTOR CAN UTILIZE EXISTING NORTH <br /> CONSTRUCTION ACCESS SHOWN ON SHEET <br /> P3 MA SB C1.1 FOR THE MAJORITY OF THE PROJECT <br /> w�w _ FEDERAL �Q5 HEWITT UNTIL DIRECTED BY ENGINEER TO UTILIZE THE <br /> HWY 2 <br /> NAVIGATION A O FEDERAL NEW NORTH GATE ALIGNMENT. <br /> CHANNEL PACIFIC <br /> ® NO CONTRACTOR TRAFFIC QUEUING IS <br /> LL r TRUCK TRAFFIC �� > I DEADWATER <br /> ALLOWED ON EITHER TERMINAL AVENUE OR <br /> OUT TO NORTH <br /> a SLOUGH FEDERAL AVENUE. <br /> G,oJ�PO� w � <br /> EX WAREHOUSE TRUCK TRAFFIC <br /> SOUTH I FROM 1-5 �i TRUCK TRAFFIC <br /> GATE SOUTHBOUND TO -5 <br /> NORTHBOUND <br /> -x� _ VERETT AVENUE <br /> @(D@ FEDERAL AVENUE SP 41ST E LOWELL <br /> G MDK�V�ED <br /> TRUCK TRAFFIC IN FROM / W TRUCK TRAFFIC <br /> NORTH AND SOUTH / OUT TO SOUTH <br /> z PIGEON Q <br /> CREEK <br /> Q W <br /> MUKILTEO BLVD. <br /> TRUCK TRAFFIC <br /> MAIN MARINE W o FROM 1-5 <br /> TERMINAL TRAFFIC Z PIGEON No. 1 TRUCK TRAFFIC NORTHBOUND <br /> TERMINAL AVENUE® CREEK C'a TO 1-5 <br /> No. 2 o SOUTHBOUND <br /> i <br /> SITE ACCESS PLAN TRUCK HAUL ROUTES z <br /> SCALE: 1" = 200' SCALE: 1" = 2000' RECORD DRAWING IF SHEET LESS THAN 22 <br /> REDUCE SCC ALE ACCORDINGLY <br /> Q <br /> PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. NO. G4 1 <br /> RECORD CONDITIONS N. WATSON AS SHOWN Q <br /> Port of ILANSREFLECTATED IN THESE NORTON TERMINAL DEVELOPMENT • <br /> DESIGNED BY: DATE: <br /> INFORMATION <br /> ATIO T J. BECKER 06/21/2021 CIP NO. <br /> EVERETT INFORMATION -8-900-05 O <br /> PROVIDED BY THE DRAWN BY: CHECKED BY: & MTCA 3RD INTERIM ACTION <br /> 16015th Avenue,Suite 1300 o7/D5/2o23 NW RECORD DRAWING RECORD K. EDWARDS, D. YU N. WATSON PROJECT <br /> P,0. BOX 538 Seattle,Washington98101 CONTRACTOR. APPROVED BY: SITE ACCESS AND STOCKPILE PLAN NO. MT-NT-2021-02.2 C� <br /> EVERETT, WA sa2os ® 06/21/2021 NW ISSUED FOR BID CONDITIONS WERE NOT W <br /> EVER) T WA 4 (206)382-0600 Fax(206)382-0500 .VERIFIED BY ENGINEER <br /> PROJECT NO.1600120 No. DATE BY REVISION No. DATE BY REVISION SHEET NO. 09 OF 150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.