Laserfiche WebLink
OTHER CONSTRUCTION PROJECTS PORT GARDNER BAY <br /> ❑A NORTON TERMINAL-PRELOAD&MTCA 3RD INTERIM ACTION -SEPARATE PRELOAD CONTRACT CONSTRUCTION WILL OCCUR EAST WATERWAY OUTER HARBOR LINE <br /> DURING SUMMER AND EARLY FALL 2021 (ANTICIPATED TO BE COMPLETE BY MID-OCTOBER).THIS PROJECT WOULD SHARE <br /> ACCESS AT BOTH THE NORTH AND SOUTH ENDS DURING CONSTRUCTION. _ _ _ _ _ _ _ _ _ _ INNER HARBOR LINE_ <br /> r F� <br /> ©CITY FORCEMAIN CONSTRUCTION -THE CITY OF EVERETT WILL HAVE A SEPARATE PROJECT THAT INSTALLS A FORCEMAIN THRU I ♦♦ <br /> THE WORK AREA FROM FEDERAL AVENUE AT THE SOUTH TO THE PORT GARDNER STORMWATER FACILITY AT THE NORTH AS <br /> SHOWN, CONSTRUCTION IS ANTICIPATED DURING FIRST QUARTER 2022 AND WILL PROGRESS FROM SOUTH TO NORTH.THIS - - <br /> CONTRACTOR WILL GENERALLY OCCUPY SEGMENTS OF THE EASEMENT AREA SHOWN IN THE DRAWINGS AS THE WORK 0 <br /> PROGRESSES.THEY MAY DEMOBILIZE IF THE PRELOAD MATERIAL AT THE NORTHERN PORTION OF THE ALIGNMENT IS NOT 61 5 <br /> REMOVED AND WILL RETURN AS SOON AS THAT AREA IS AVAILABLE, THE CONTRACTOR SHALL COORDINATE AND ALLOW ACCESS O �p 0 <br /> FOR THIS CONTRACTOR TO INSTALL THE NEW FORCEMAIN THROUGH THE NORTON TERMINAL WORK AREA. <br /> ©EXXON MOBIL/ADC MTCA CLEANUP EXXON MOBIL WILL BE PERFORMING CLEAN-UP EXCAVATION ON BOTH SIDES OF THE PORT GARDNER BAY <br /> FEDERAL AVENUE ROW BETWEEN MAY AND SEPTEMBER 1 2022.THIS PROJECT WILL SHARE ACCESS FROM THE SOUTH VIA m o <br /> FEDERAL AVENUE ,W/ / ® `�STORAGE ARE <br /> O EAST WATERWAY ♦♦`FD FR <br /> SNOPUD WORK AT FEDERAL AVENUE - SNOPUD MAY BE REMOVING A GUY POLE AT THE NORTH AND SOUTH ENDS OF FEDERAL � J ''- <br /> AVENUE AND RELOCATING SOME OVERHEAD POWER LINES ON FEDERAL AVENUE DURING THE COURSE OF THE PROJECT. / <br /> SEPARATE WAREHOUSE TENANT LEASEHOLD CONTRACT CONSTRUCTION WILL OCCUR DURING SUMMER AND EARLY FALL 2021 <br /> (ANTICIPATED TO BE COMPLETE BY OCTOBER).WORK WILL INCLUDE THE PLACEMENT AND COMPACTION OF A 1-FOOT THICK ,y:� �,� \N` CESF TREATMENT SYSTEM© <br /> LAYER OF CRUSHED SURFACING BASE COURSE. IMMEDIATELY FOLLOWING CONSTRUCTION,THE PORT WILL USE THE AREA TO '7 <br /> STORE EMPTY CARGO CONTAINERS.THIS PROJECT WILL SHARE ACCESS VIA FEDERAL AVENUE.THE CONTRACTOR SHALL m o <br /> COORDINATE DEMOLITION AND UTILITY PIPE FILL AND ABANDONMENT WORK IN THIS AREA WITH THE PORT AND THE PORT'S r o ° v <br /> CONTRACTOR <br /> HEWITTTERMINAL EVERETT SHIP <br /> (PORT OF EVERETT) REPAIR f NT—HML-01 NT—HML-02 NTJHML-03 <br /> o — jz <br /> (PORT OF EVERETT) <br /> to <br /> @APPROX EXXON-MOBIL 5 I EX PUD <br /> / u SUBSTATION c <br /> MTCA SITE BOUNDARY \ <br /> _oHw uNE <br /> I� <br /> ® -----� DUNLAPn I B <br /> ��. x (PORTOF L — NTB P-30 1 <br /> \1411 8 FED ERALAVE ��` EVERETT) 13 0 0 0 0 0 0 o a o o a o 0 o p T-L-1 ROFR IIN�l� <br /> k D ♦ °o <br /> 0 0 <br /> IF <br /> NT-HML-OS` <br /> o mcr <br /> D r" -" o° ❑ NT-HML-06 NT-HML-07 <br /> __ NT-HML-08 NT-HML-09 <br /> ® 11 8 < \ CITY FORCEMAIN ESMT © 1 2 ETI Q0 <br /> (50' PERMANENT PLUS 4 9 12 16 I PRELOAD AREA e T- -3z <br /> \\11 POLE CP10 o C _ 25' CONSTRUCTION ESMT) N HML-10 0 <br /> \� 1�% N���TENANT -� + <br /> � • i' <br /> LEASEHOLD e <br /> CITY OF <br /> ♦♦ Y <br /> L� �� ♦♦♦♦ - EX WAREHOUSE BLDG \ 1 ma mn mn mn - TLP 33 <br /> \ NT-HML-1 NT-HML-12 NT-HML-13 EVERETT PORT <br /> NT—HML-14 � I U GARDNER <br /> STORMWATER <br /> ® FACILITY <br /> -�� ® 3 <br /> \ o e <br /> \\\ \ I NT-HML-1F <br /> 1 -— ----- �® _ _ 12 J O 00 X <br /> 1 ----- ---- �ERLY-CLARK ♦ __ <br /> 1 ------- MTCA SITE BOUNDAR <br /> �<a,M -- ------� -- 100' 0 100' 200' <br /> K E Y NOTES WEST MARINE VIEW DRIVE(SR 529) - 1 6 50' 150' <br /> O THE PROJECT HAS A DUAL PURPOSE AS A COMBINED DEVELOPMENT OF OOUTFALL REPLACEMENT(SEE STORMWATER DRAWINGS)IS SUBJECT TO @CONTRACTOR SHALL COMPLETE INSTALLATION OF THE NEW WATERLINE, 11 CONTRACTOR SHALL COORDINATE WITH PORT(AND SEPARATE 14 SEE SHEET G4.1 FOR SITE ACCESS REQUIREMENTS. LEGEND SCALE: 1"=100' <br /> NORTON TERMINAL AND A 3RD INTERIM ACTION CLEANUP FROM THE IN-WATER CONSTRUCTION WINDOWS AND SHALL BE COMPLETED BETWEEN ELECTRICAL AND COMMUNICATIONS DUCTBANKS(INCLUDING ASSOCIATED COMMUNICATIONS CONTRACTOR)TO MINIMIZE CHANGE-OVER DURATION <br /> FORMER KIMBERLY-CLARK OPERATIONS.THE NORTON TERMINAL IS WITHIN JULY 16 AND FEBRUARY 15.WORK SHALL ALSO BE PERFORMED IN THE TRENCHING, BACKFILL& REPAVING) LOCATED WITHIN THE FEDERAL BETWEEN EXISTING COMMUNICATIONS POLE AND NEW COMMUNICATIONS 15 NOT USED KIMBERLY-CLARK MTCA SITE BOUNDARY <br /> THE KIMBERLY-CLARK MTCA SITE. SEE SPECIFICATIONS FOR FURTHER "DRY'AT LOW TIDES.SEE SPECIFICATIONS FOR FURTHER ENVIRONMENTAL AVENUE ROW PRIOR TO THE MAY 1,2022 START OF EXXON-MOBIL POLE(AND INTERCEPTION OF CONDUITS IN HEWITT TERMINAL). NEW <br /> ENVIRONMENTAL REQUIREMENTS. REQUIREMENTS AND BMPS. SEE SPECIFICATIONS FOR DEWATERING REQUIREMENTS AND -------- EXXON MOBIL MTCA SITE BOUNDARY <br /> CLEANUP.CONTRACTOR SHALL NOTE THAT WORK WITHIN FEDERAL AVENUE COMMUNICATIONS POLE CP10 AND ADJACENT CONDUITS SHALL BE <br /> IS WITHIN THE EXXON-MOBIL/ADC MTCA SITE AS SHOWN ON G1.4.SEE INSTALLED AND READY FOR WORK BY OTHERS ON MARCH 1,2022. 16 POTENTIAL CITY SANITARY SEWER DISCHARGE LOCATIONS NEAR <br /> O SEE SHEET G2.1 AND THE SPECIFICATIONS FOR FURTHER INFORMATION ON @ CESF TREATMENT SYSTEM SHALL BE COMPLETE AND OPERATIONAL PRIOR SPECIFICATIONS FOR FURTHER ENVIRONMENTAL REQUIREMENTS. SEE ELECTRICAL DRAWINGS FOR FURTHER DETAILS. NORTH AND SOUTH GATES AS SHOWN ON SHEET C1.1. <br /> REMAINING KNOWN BELOW GRADE FOUNDATIONS FROM THE FORMER TO OFF-SITE DISCHARGE OF STORM WATER RUNOFF.CONTRACTOR SHALL Al <br /> KIMBERLY-CLARK FACILITY. INFILTRATE ALL STORMWATER ON-SITE UNTIL NEW PAVEMENT IS PLACED. @THE CONTRACTOR SHALL COMPLETE THE PROJECT ON-SITE 12 THE CONTRACTOR WILL INSTALL THE BELOW GRADE INFRASTRUCTURE REFER TO SHEET C1.1 FOR AREA AVAILABLE TO CONTRACTOR <br /> ANY NEW PAVED AREAS SHALL TEMPORARILY CONVEY RUNOFF TO AN COMMUNICATIONS DUCTBANKS,VAULTS AND POLES PRIOR TO AUGUST 1, FOR THE SNOPUD EQUIPMENT WITHIN NORTON TERMINAL AND SHALL 17 FOR LAYDOWN/STOCKPILE AREA ON NORTH SIDE OF WAREHOUSE. <br /> O THE CONTRACTOR SHALL BE AWARE THAT THE NORTHERN PORTION OF INFILTRATION AREA OR TO THE CESF SYSTEM FOR TREATMENT PRIOR TO 2022 AND ALLOW THE PORT ACCESS TO THIS INFRASTRUCTURE To PULL COORDINATE WITH SNOPUD TO ALLOW INSTALLATION OF THEIR <br /> THE SITE RAS KNOWN WOOD WASTE DEPOSITS THAT IMPACT VARIOUS SITE OFF-SITE DISCHARGE.SEE SPECIFICATIONS AND TESC DRAWINGS FOR COMMUNICATIONS CABLES AND INSTALL EQUIPMENT ONTO POLES PRIOR EQUIPMENT AND CABLING. SEE ELECTRICAL DRAWINGS FOR DETAILS. VERT DATUM: NAVD 88 <br /> DESIGN ELEMENTS. SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS. FURTHER REQUIREMENTS. TO TERMINAL OPENING. SEE ELECTRICAL DRAWINGS FOR FURTHER DETAILS. <br /> CONV TO MLLW = NAVD88+2.03 <br /> 13 CONTRACTOR SHALL NOTE THAT THE MODULAR LONGSHORE BUILDINGS <br /> 4 SEE SPECIFICATIONS FOR TERMINAL OPENING AND SUBSTANTIAL 7 PRELOAD ANTICIPATED TO BE COMPLETE IN FIRST QUARTER 2022. <br /> COMPLETION MILESTONE REQUIREMENTS. CONTRACTOR SHALL ASSUME THAT SOME PORTIONS OF PRELOAD MAY 1 O DUE TO EXXON-MOBIL CONSTRUCTION,THE CONTRACTOR SHALL WAIT TO AND GUARD SHACK WILL BE DEFERRED SUBMITTALS FROM THE CITY HORZ DATUM: NAD 83/91 Z <br /> INSTALL NEW FEDERAL AVENUE SLIDE GATE FROM HEWITT TERMINAL(AND BASED ON CONTRACTOR DESIGN. CONSTRUCTION CAN NOT BEGIN <br /> THAT PORTIONS OF THE PRELOAD MAY BE AVAILABLE NEED TO STAY IN PLACE UNTIL MID-MARCH AILABLE E022. IT IS ANTICIPATED FOR RELOCATION ASSOCIATED ELECTRICAL POWER) UNTIL SEPTEMBER 1,2022. UNTIL THE CONTRACTOR OBTAINS REQUIRED PERMITS FROM THE CITY. /'► IF SHEET IS LESS THAN 22X34 2 <br /> SOONER BASED ON RESULTS of SETTLEMENT MONITORING. <br /> ARCHITECTURAL SPECIFICATIONS. <br /> c. RECORD DRAWING REDUCE SCALE ACCORDINGLY Q <br /> PROJECT WATSON1"ENGINEER: SD PORT OF EVERETT DWG. N° G5 1 0 <br /> 2/18/2022 NW MARITIME TENANT SITE DEVELOPMENT RECORD CONDITIONS N. W 1" = 1 OO' <br /> ILLUSTRATED IN THESE <br /> 8 12/02/2021 JB DELETE ECOLOGY BLOCK WALL, DESIGNED BY: DATE: <br /> ADD EX WHS GRAVEL PAD PLANS REFLECT 0 <br /> Port of f CONTOURSGRADES &AND <br /> D UPDATMENT E <br /> ES J.INFORMATION BECKER 06/21/2021 NORTON TERMINAL DEVELOPMENT CIP No. <br /> EVERETT ® 12/02/2021 NW 2-INCH TO 9-INCH PVMT PROVIDED BY THE DRAWN BY: CHECKED BY: & MTCA 3RD INTERIM ACTION -8-900-05 0 <br /> j�i� 16015th Avenue,Suite 1300 Q 07/28/2021 NW ADDENDUM 4 K. EDWARDS, D. YU N. WATSON PROJECT <br /> P.D. BOX 538 CONTRACTOR.RECORD Seattle,Washington 98101 CONSTRAINTS AND PHASING PLAN NO. MT—NT-2021-02.2 U <br /> ® 06/21/2021 NW ISSUED FOR BID ® 07/05/2023 NW RECORD DRAWING CONDITIONS WERE NOT APPROVED BY: <br /> EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 WN <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION VERIFIED BY ENGINEER. SHEET NO. 10 OF 150 Ids <br />