Laserfiche WebLink
�o\\ DEMO Ex ASPH PATH, Ex OUTFALL 114 PORT GARDNER BAY <br /> 2•.` ,.••'.•'l:• yh\\� SEE NOTE 4 (DECOMMISSIONED) <br /> w NF\ EAST WATERWAY <br /> SALVc� \ F'rgsp ^^ •" +• \ \\ AGE EX SS ENCLOSURE LIGHTING O BOARDPANEL CONTRO S. REMVE WIRING AND <br /> '�'\ \ -.- A/ '•s••• ' BACK TO SOURCE NEAR BARGE DOCK. FULLY <br /> CLEAR&GRUB AREA WEST OF EX JERSEY <br /> ® ® ^• "`,y",`.,•' \ BARRIER TO EX SHORELINE ROCKERY. REMOVE OR CUT AND CAP EX UNDERGROUND <br /> ' CONDUIT AND ABANDON IN PLACE <br /> REMOVE AND DISPOSE OF TOP 6"OF SOIL <br /> AND REPL W/4 (CONTRACTOR TO VERIFY SOURCE LOCATION) <br /> "STREAMBED COBBLES <br /> \� \ �. •'�::`• \�\ EX CONC BASE/ DEMO ALL EX LIGHTING BOLLARDS AND WIRING BACK TO <br /> \ ��\ TRANSMISSION POLE, PIP SS ENCLOSURE,TYP. FULLY REMOVE OR CUT AND CAP <br /> EX UNDERGROUND CONDUIT AND ABANDON IN PLACE <br /> EX CONC STEPS, \ \ ^''�; '•LP;•.�,� DEMO EX POWER EQUIPMENT DEMO EX TREE, <br /> PIP,TYR(6) \ \ " <•.' ,•. \\ <br /> r +,�"1 •• .�.1 \\\ SEE PHOTO 12 <br /> DEMO EX CB. y ,•.. :.ob.�--•�-_ _ r..^-.._ .C.,_r. <br /> SEE NOTE 1 & 5 CUT,CAP&ABAN �- ••• �' V __ �\ <br /> EX 6' HIGH CSBC EX 10"SO PIPE, EX JERSEY c •p.°P,•. _�' .;,,, •,••• {_�. �^t^+r•i ='• "�' \ <br /> RIM=14.88 ��`o•+,•�'PRE AREA IE=13.1 (10"E) SEE DETAIL X ON SIFT XX BARRIER, PIP ��•„ , :�-".: \\ <br /> EX MONITORING 17 <br /> IE=13.1 (10"N) �-J WELL PIP,TYP��.. ..X; •' pp:.,•:.`:",. .:� >I <br /> EX ASPH ROAD /� � '•+�•� J <br /> u IL-1 <br /> ., _, •+++ �,.:a... DEMO EX <br /> DEMO EX MH, s --•-�-�,,� 4 GVL PATH <br /> RIM=15.36 x <br /> EX POP �' <br /> \ SEE NOTE 1 &/5 - v,..•:. ` <br /> x x 76 ��.,:� '''•, <br /> IE=11.5(10° ) _I X(� \ \ �~;'\.; ` EX MONITORING <br /> \ I FILL EX 10"SD w/CDF J / l ~ :; p \ WEELNOTE 6 P <br /> \ i 4 <br /> &ABANDON-IN-PLACE <br /> x . o• . <br /> I EX BERM \ •• `r;'•;+'�?`�` r "ti <br /> I \ " X PUD \' ✓ \ \ \\ \ `:• �...•,+• •4°, �" END OF CLEAR <br /> EX PUD SUBSTATION J` SUBSTATION \ ,.J •. <br /> �.:..',:•�> iS`7U y,.. - &GRUB AREA <br /> FENCE,PIP •...� a.S F�s r\ •.+ <br /> 16-� DEMO EX MH, <br /> SEE NOTE 1 &5 1 \ �/ J �13— �i+��� �• ,��`c V �\ A BEX ULKHEAD <br /> RIM=15.81 <br /> op <br /> x� x ,� <br /> Ty <br /> DEMOLITION NOTES DEMOLITION DETAIL LEGEND \l <br /> = <br /> 1. THE EXISTING UTILITY LOCATIONS AND DEPTHS SHOWN ON D1.1 D1.6 SCALE: 1" 30' DEMO EX ASPHALT <br /> THESE PLANS ARE APPROXIMATE. NO REPRESENTATION IS MADE 5. CONTRACTOR SHALL DEMO EXISTING CB AND MH STTRUCTURES {•'s + <br /> AS TO THE ACCURACY OR COMPLETENESS OF THE TO ELEVATION 14' OR LOWER. FILL REMAINING STRUCTURES ;r;+? tfe DEMO EX GRAVEL <br /> INFORMATION. THE CONTRACTOR SHALL POTHOLE OR OTHERWISE AND PIPE WITH CDF. PLACE GEOGRID OVER EXISTING SD <br /> CONFIRM EXISTING CONDITIONS PRIOR TO START OF WORK. IF STRUCTURES BEFORE BACKFILL PLACEMENT AND COMPACTION. UPSTREAM MH EX GRADE DOWNSTREAM MH CLEAR & GRUB AREA <br /> CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLANS, THE EXTEND GEOGRID 3' MIN ON ALL SIDES EXCEPT EXTEND TO <br /> CONTRACTOR SHALL NOTIFY THE ENGINEER AND SHALL NOT EXISTING FENCE ON NORTH SIDE. SEE SHEET C3.21. ———— SAWCUT LINE <br /> BEGIN CONSTRUCTION UNTIL THE CHANGED CONDITIONS HAVE CONTRACTOR SHALL USE CARE TO PROTECT THE ADJACENT \��\�\\ <br /> BEEN EVALUATED. THE CONTRACTOR SHALL TAKE SNOHOMISH PUD FENCE, BUILDING AND EQUIPMENT FROM �� \��\��\��\��\��\��\ \//�\//�\//�\//�\//�\//�\//�\// /�\//�\//�\//�\/j 0 EXISTING MONITORING WELL, <br /> PRECAUTIONARY MEASURES TO PROTECT FROM DAMAGE OR DAMAGE. DAMAGE TO PUD INFRASTRUCTURE BY THE PROTECT-IN-PLACE, SEE NOTE 6 <br /> DESTRUCTION ALL UTILITIES AS SHOWN AND ALL UTILITIES NOT CONTRACTOR SHALL BE REPAIRED AT NO COST TO THE PORT <br /> SHOWN THAT MAY BE ENCOUNTERED DURING CONSTRUCTION TO THE SATISFACTION OF THE PUD. <br /> DUE TO NO RECORD OF THEIR EXISTENCE. J 5X PIPE CIA MIN 5X PIPE DIA MIN <br /> 6. CLEARING, GRUBBING & DEMOLITION ACTIVITIES SHALL NOT <br /> 2. UTILITIES, STRUCTURES AND SITE FEATURES NOT INDICATED FOR DISTURB AN AREA WITHIN ABOUT 1' AROUND PERIMETER OF <br /> DEMOLITION SHALL BE PROTECTED-IN-PLACE. EXISTING MONITORING WELLS TO PROTECT THE WELLS IN PLACE. ° a <br /> BRUSH AND WEEDS TALLER THAN 12 INCHES THAT ARE <br /> 3. ALL ITEMS MARKED FOR DEMOLITION (DEMO) SHALL BE LOCATED WITHIN THE 1' OF UNDISTURBED AREA AROUND EACH <br /> DEMOLISHED AND REMOVED FROM THE SITE AND DISPOSED OF MONITORING WELL SHALL BE REMOVED BY HAND WITH SHOVEL. q <br /> AT AN APPROVED UPLAND DISPOSAL SITE IN ACCORDANCE WITH VEGETATION REMOVAL SHALL INCLUDE REMOVAL OF ROOTS. <br /> THE SPECIFICATIONS. ANY FEES REQUIRED FOR DISPOSAL ARE °4 a <br /> THE RESPONSIBILITY OF THE CONTRACTOR. 7. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEW OF THE CALL 48HOURS <br /> EXISTING SHORELINE CONDITIONS AND SHALL CHOOSE THE FILL EX PIPE W/ FILL EX PIPE W/ v EX CDF PLUG, TYP BEFORE YOU DIG <br /> 4 CONTRACTOR SHALLEXISTING ASPHALT ATH IS APPROXIMATELY 4"FIELD VERIFY THICKNESS AND°K.REMOVE THE STREAOMB DTCOBBLESENT SO ADS TOENOT DAMAGE GE OR AND PLACES <br /> RIGGER NON—SHRINK GROUT NON—SHRINK GROUT K E V NOTES DIAL 811 <br /> FULL THICKNESS OF ACP MARKED FOR DEMO. FAILURE OF THE SHORELINE ROCKERY. DAMAGE TO THE <br /> ROCKERY CAUSED BY THE CONTRACTOR SHALL BE REPAIRED iO EXPOSE AND BREECH EXISTING PIPE 5. PIPE DIAMETERS VERT DATUM: NAVD 88 <br /> BY THE CONTRACTOR AT NO COST TO THE PORT, TO THE pp FROM UPSTREAM AND DOWNSTREAM MANHOLES. IF PIPE PLUG CONV TO MLLW = NAVD88+2.03 <br /> PORT'S SATISFACTION. 2 GRAVITY P 0 P E A R A N D O N-I N-PLACE D E TA I L� IS ENCOUNTERED, EXPOSE AND BREECH PIPE AN ADDITIONAL HORZ DATUM: NAD 83/91 Z <br /> 2 PIPE DIAMETERS FURTHER FROM STRUCTURE UNTIL AN IF SHEEP IS LESS THAN 22x34 <br /> C.X.X CX.X SCALE: NTS UNOBSTRUCTED SECTION OF PIPE IS BREECHED EACH END. REDUCE SCALE ACCORDINGLY <br /> a <br /> PROJECT N. WATSONENGINEER: SCALE: PORT OF EVERETT °W° N° D1 6 <br /> RECORD CONDITIONS N. W AS SHOWN <br /> ILLUSTRATED IN THESE <br /> Port of PLANS REFLECT DESIGNED BY: DATE: NORTON TERMINAL DEVELOPMENT <br /> J. BECKER 06/21/2021 CIP No. <br /> 1Tff INFORMATION OC <br /> 0 D7/D5/2823 NW RECORD DRAWING PROVIDED BY THE DRAWN BY: CHECKED BY & MTCA 3RD INTERIM ACTION 1-8—goo—os <br /> EVERETT O <br /> 16015th Avenue,Suite 1300 07/23/2021 NW ADDENDUM 3 CONTRACTOR.RECORD K. EDWARDS, D. YU N. WATSON PROJECT <br /> P.o, BOX 538 Seattle,Washington 98101 APPROVED BY: DEMOLITION DETAILS No. MT—NT-2021—02.2 tU <br /> ® 06/21/2021 NW ISSUED FOR BID CONDITIONS WERE NOT <br /> EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 <br /> W <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE I BY REVISION NO. DATE BY REVISION VERIFIED BY ENGINEER. (3 OF 5) SHEET NO. 16 OF 150 <br />