Laserfiche WebLink
° r <br /> RELOC EX -/ <br /> BUMPING POST <br /> DEMO 140LF EX RR ti <br /> / TRACKS TO NEW BUMPING \ <br /> POST LOCATION /— >_ <br /> RELOC EX <br /> DEMO 75LF BUMPING POST <br /> / EX CONC CURB /\ � /v T EX DWO BELOW GRADE PIP <br /> — <br /> \/ EX DWO ABOVE GRADE PIP qR--gyMp -pgST DEMO 21BF EX SENS SURE <br /> DEMO EX CONC SLAB / DEMO EX ACE AS NEEDED <br /> / EX UTILITY _� DEMO 120LF EX RR <br /> 1 VAULT,PIP TRACKS TO NEW DEMO 113LF EX 7'HIGH FOR COMM POLE CONSTRUCTION <br /> / DEMO 1/6LF EX 7'HIGH CLF,SEE F BUMPING POST LOCATION CLF,SEE NOTE 7. SALVAGE DEMO 40LF EX RR <br /> \ EX GATES,SEE NOTE 5 TRACKS TO NEW SAWCUT EX ACP ALONG <br /> EXTDW6 ABOVE GRADE NOTE 7.SALVAGE EX GATES,SEE �- /SAWCUT EX ACP ALONG <br /> — NOTE 5.SEE SHT C6.1 FOR NEW C WASTEWATER/STORMWATER I �� -�- —— BUMPING POST LOCATION PROP LINE&DEMO EX EX ACP TO PROP LINE <br /> PROP LINE&DEMO <br /> _ PIPELINE EASEMENT EX CONC BLOCK BARRI R&GAS UTILITY �- O_ V ` -� � PROP LINE <br /> DEMO EX CONC <br /> NEI <br /> J ■ ■ BLOCKS w/CAR <br /> DEMO 200LF EX T HIGH <br /> EX HOPE PIPE \ %-rTs ■•������� OLE,SES,BEE EE TE 7.SALVAGE <br /> ABOVE GRADE,PIP CORO FOOTING EX VAULT ■■Q•■������� �� <br /> x PIP DEMO EX CONC <br /> x / \ BOLLARD,TYP <br /> DEMO EX - �- ' �20� ax� - PROPERTY LINE <br /> CONIC SLABS <br /> NEW LOCATION FOR EX `-DEMO 1561 EX RR �,�,t - 11 / •■• <br /> BUMPING POST IN FRONT OF TRACKS TO NEW x -�- <br /> EX RR TRACK, �/- x <br /> EX GATES TO BE REMOVED. _ <br /> PROTECT-IN=PLACE BUMPING POST LOCATION <br /> CUT EX RR TRACKS ON THE DEMe 20OLF EX FIR TRAGIKS 22- 21 , <br /> PROJECT SITE SIDE OF RELOC EX FLAG POLE <br /> i-— CLEAR&GRUB AREA EAST <br /> BUMPING POST AND DEMO NEW LOCATION FOR EX B� �- &CONC BASE TO <br /> THE SITE RR TRACKS. —_. BUMPING POST IN FRONT OF TIES T �6ha HEA,REST OF EX CLF TO PROP LINE NORTH GATE, SEE <br /> ��- EX GATES TO BE REMOVED. To NEW BUMPING POST <br /> v CUT EX RR TRACKS ON THE EX RR TRACK, SET C2.2 DETAIL 2. <br /> INSTALLED IN FRONT OF EX yl -� <br /> PROJECT SITE SIDE OF GATE.CUT EX RR TRACKS PROTECT-IN-PLACEBEM8 EX RR TPOOKS <br /> J <br /> BUMPING POST AND DEMO ON THE PROJECT SITE SIDE EX 7' HIGH CLF, PIP <br /> _ THE SITE RR TRACKS. _BNSF RAILROAD R.O.W. _1 OF BUMPING POST AND TO PR PIERP` NE <br /> DEMO THE SITE RR TRACKS. <br /> DEMOLITION DETAIL DEMOLITION NOTES LEGEND <br /> D1.1 D1.7 SCALE: 1"=30' 1. THE EXISTING UTILITY LOCATIONS AND DEPTHS SHOWN ON DEMO EX ASPHALT <br /> THESE PLANS ARE APPROXIMATE. NO REPRESENTATION IS <br /> MADE AS TO THE ACCURACY OR COMPLETENESS OF THE DEMO EX CONCRETE <br /> INFORMATION. THE CONTRACTOR SHALL POTHOLE OR <br /> DEMO EX TREE, DEMO 19OLF Ex I IL V1 OTHERWISE CONFIRM EXISTING CONDITIONS PRIOR TO START SAWCUT LINE <br /> / EX OR, PIP (12 t 0 TRUNK) 7' HIGH CLF, OF WORK. IF CONDITIONS DIFFER FROM THOSE SHOWN ON <br /> SEE NOTE 7 1 THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER BUMPING POST <br /> N:363268.51/ \ 6/ 1 AND SHALL NOT BEGIN CONSTRUCTION UNTIL THE CHANGED <br /> x9 <br /> DEMO Ex TREE, E.1302170.27 x x x x CONDITIONS HAVE BEEN EVALUATED. THE CONTRACTOR SHALL <br /> (9"t 0 TRUNK) Ex UTILITY X \ TAKE PRECAUTIONARY MEASURES TO PROTECT FROM DAMAGE <br /> POLE,PIP DEMO EX TREE, I OR DESTRUCTION ALL UTILITIES AS SHOWN AND ALL UTILITIES <br /> EX DO <br /> w I I EASEMENT L� x (14i 0 TRUNK) _17- NOT SHOWN THAT MAY BE ENCOUNTERED DURING <br /> _ EX GRASS \ CONSTRUCTION DUE TO NO RECORD OF THEIR EXISTENCE. <br /> SALVAGE EX SWING / oar ��_11EXPVMT I 2. UTILITIES, STRUCTURES AND SITE FEATURES NOT INDICATED <br /> GATES,SEE NOTE 5 °P oa _ FOR DEMOLITION SHALL BE PROTECTED-IN-PLACE. <br /> �-a-I- DEMO EX TREE, op�� {I�� PROPERTY <br /> DEMO 14LF Ex CONC CURB (15"t o TRUNK) DEMO EX TREE, I oIN=— 3. ALL ITEMS MARKED FOR DEMOLITION (DEMO) SHALL BE <br /> + DEMO Ex TREE (12"i 4 TRUNK) <br /> N:36325 .71 DEMOLISHED AND REMOVED FROM THE SITE AND DISPOSED <br /> E:13021 2.37 (22"t °TRUNK) moo_ I OF AT AN APPROVED UPLAND DISPOSAL SITE IN <br /> a° '^ N:363269.05 EMo Ex TREE, ° �c ACCORDANCE WITH THE SPECIFICATIONS. ANY FEES REQUIRED <br /> DEMO 2 LF EX 9 ^' m E:1302172.20 �c <br /> +M GONG CURB\ �M_ / (15'f 0 TRUNK) mac_ FOR DISPOSAL ARE THE RESPONSIBILITY OF THE <br /> owing■■I■■ SAWCUT& DEMO I ACP F R N:363268.83 <br /> DEMO soLF EX EX PVMT �`M �,III CONTRACTOR. <br /> ■ NEW DRIVEWAY.SEE NOTE DEMO 60LF EX 6'HIGH CLF —�^-{� <br /> , ` M 4. CONTRACTOR SHALL COORDINATE WITH CITY TO SHUT—OFF <br /> 7'FocH G F, Runs■■■■■■■.�■■■ E.1302173.91 M WATER SERVICE AS NEEDED TO CONSTRUCT WATERMAIN <br /> _ SEE NOTE 7 M ■■■■■ .■■.■ I M_ EXTENSION AND TO DECOMMISSION AND ABANDON EXISTING <br /> x x x RELOC Ex JERSEY BARRIER \ ■■■■■■■■■■■■■■i WATER SERVICES AS NOTED ON THE DRAWINGS. <br /> N:130363204.2900.8 I 0 18LF EX TO BLOCK STRORAGE AREA NORTON AVE I <br /> E:1302200.80 s � �� <br /> GONG CURB csNEAR WHARF 5. CONTRACTOR SHALL USE CARE TO REMOVE AND NOT DAMAGE <br /> ITEMS MARKED FOR SALVAGE. CONTRACTOR SHALL RETURN <br /> �-1 \ Ex DWG BELOW SALVAGED ITEMS TO THE PORT AT COVERED LOADING DOCKS <br /> PROPE EX UTILITY ME, PIP ss \ I GRADE, PIP — <br /> - ss—ss— \ 18- <br /> RTY LINE 1 AND 2 ALONG WEST SIDE OF EXISTING WAREHOUSE. <br /> 363212.14 s \s n�ss \ 6. EXISTING ACP IN NORTON AVE IS APPROXIMATELY 6" THICK. CALL 48HOURS <br /> \ N: _ \ <br /> E13O2207.00 ��_ - - � �cs� CONTHHETFULLOR SHALL HICKNESSIOFD VERIFY ACP AREIDKFORS AND EMO.REMOVE BEFORE YOU DIG <br /> DIAL 811 <br /> 7. DEMOLITION OF EXISTING CHAINLINK FENCE SHALL INCLUDE <br /> DEMOLITION OF EXISTING POSTS, CONCRETE FOUNDATIONS, VERT DATUM: NAVD 88 <br /> BARBED WIRE, AND FASTENERS. CONV TO MLLW = NAVD88+2.03 0 <br /> DEMOLITION DETAIL HORZ DATUM: NAD 83/91 Z <br /> D1.1 D1.7 SCALE: 1"=10' IF SHEET IS RECORD DRAWING EDUCE SCALE EACCORDI ACCORDINGLY <br /> SS THAN 4 a <br /> PROJECT ENGINEER: SCALE: PORT OF EVERETT °W°� N°� D1 7 � <br /> RECORD CONDITIONS N. WATSON AS SHOWN <br /> ILLUSTRATED IN THESE <br /> Port o,f PLANS REFLECT DESIGNED BY: DATE: NORTON TERMINAL DEVELOPMENT <br /> J. BECKER 06/21/2021 CIP NO. <br /> EVERETT INFORMATION 0 <br /> e D7/D5/2D23 NW RECORD DRAWING DRAWN BY: CHECKED BY: & MTCA 3RD INTERIM ACTION 1-8-goo—os � <br /> PROVIDED BY THE K. EDWARDS, D. YU N. WATSON PROJECT <br /> Box 53a <br /> 16015th Avenue,Suite 1300 10/15/2021 NW REVISED PER RFI 024 CONTRACTOR.RECORD DEMOLITION DETAILS NO. MT-NT-2021-02.2. V EVE Seattle,Washington 98101 <br /> ® 06/21/2021 NW ISSUED FOR BID CONDITIONS WERE NOT APPROVED BY: <br /> EVERETT, WA 98206 (206)382-0600 Fax(206)382-0500 W <br /> (425) 259-3I64 PROJECT NO.1600120 1 NO. I DATE I BY REVISION NO. DATE BY REVISION VERIFIED BY ENGINEER. ( 4 OF 5) SHEET NO. 17 OF 150 <br />