My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 5/27/2021 <br /> City of Everett Permit Services <br /> Public Works Permit#: PW2105-051 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $7,385.11 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PORT OF EVERETT PORT OF EVERETT <br /> PO BOX 538 PO BOX 538 <br /> EVERETT,WA,98206 EVERETT,WA,98206 <br /> PHONE:4253880633 PHONE:4253880633 <br /> TAX PARCEL ID#:29051900300100 SITE ADDRESS:2600 FEDERAL AVE <br /> DESCRIPTION:SITE WORK FOR FEDERAL AVE IMPROVEMENTS RELATED TO NORTON TERMINAL <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 10/26/2021.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 8.The proposed connection to the combined sewer for water quality treatment shall be constructed and operational prior to paving unless <br /> the City's treatment system is in place at that time. <br /> 9.The City of Everett issues this permit in recognition that the work authorized herein to upgrade existing stormwater systems in Federal <br /> Avenue has independent utility separate from any development approval and it is not reliant on or a precursor to any other permit or <br /> development approval. Nothing in this permit approval limits the City's authority to approve,condition,amend,suspend,rescind,or deny this <br /> permit or any other permits under Everett Municipal Code titles 13, 14, 15, 16, 19,or 20,or any other applicable codes,rules, policies,existing <br /> agreements,the laws of the State of Washington,and/or the laws of the United States.This reservation of rights includes,without limitation, <br /> the potential amendment of the City's letter to the Port of Everett dated August 10,2021 with the subject heading"MTCA 3rd Interim Action <br /> &Mills to Maritime at Norton Terminal Development". <br /> 10.The applicant shall obtain a revision to the existing sewer discharge authorization to include the proposed surface water connection prior <br /> to connecting to the City's sanitary sewer system. <br /> 11.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 12. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 13. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br /> submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 14.This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW 25-Site Final/Permit Close <br /> Out within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> CONTINUED ON NEXT PAGE... <br />
The URL can be used to link to this page
Your browser does not support the video tag.