Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 5/27/2021 <br /> City of Everett Permit Services <br /> Public Works Permit#: PW2105-051 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $7,385.11 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PORT OF EVERETT PORT OF EVERETT <br /> PO BOX 538 PO BOX 538 <br /> EVERETT,WA,98206 EVERETT,WA,98206 <br /> PHONE:4253880633 PHONE:4253880633 <br /> TAX PARCEL ID#:29051900300100 SITE ADDRESS:2600 FEDERAL AVE <br /> DESCRIPTION:SITE WORK FOR FEDERAL AVE IMPROVEMENTS RELATED TO NORTON TERMINAL <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 10/26/2021.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 7.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.This work to be <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by the Water Department.Work shall be <br /> scheduled 3-4 weeks in advance. <br /> 8.The proposed connection to the combined sewer for water quality treatment shall be constructed and operational prior to paving unless <br /> the City's treatment system is in place at that time. <br /> 9.The City of Everett issues this permit in recognition that the work authorized herein to upgrade existing stormwater systems in Federal <br /> Avenue has independent utility separate from any development approval and it is not reliant on or a precursor to any other permit or <br /> development approval. Nothing in this permit approval limits the City's authority to approve,condition,amend,suspend,rescind,or deny this <br /> permit or any other permits under Everett Municipal Code titles 13, 14, 15, 16, 19,or 20,or any other applicable codes,rules, policies,existing <br /> agreements,the laws of the State of Washington,and/or the laws of the United States.This reservation of rights includes,without limitation, <br /> the potential amendment of the City's letter to the Port of Everett dated August 10,2021 with the subject heading"MTCA 3rd Interim Action <br /> &Mills to Maritime at Norton Terminal Development". <br /> 10.The applicant shall obtain a revision to the existing sewer discharge authorization to include the proposed surface water connection prior <br /> to connecting to the City's sanitary sewer system. <br /> 11.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to the PW Inspector per City Design and <br /> Construction Standards and Specifications for Development prior to final approval/close out of the permit. <br /> 12. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvements shall be submitted to the City prior to <br /> final approval/close out of the permit. <br /> 13. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be <br /> submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 14.This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW 25-Site Final/Permit Close <br /> Out within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br /> CONTINUED ON NEXT PAGE... <br />