Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 5/27/2021 <br /> City of Everett Permit Services Public Works Permit#: PW2105-051 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> E V E R E T T <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $7,385.11 <br /> ...CONTINUED ON PREVIOUS PAGE <br /> 15. If this project includes installation of communications conduit that the Port intends to own and retain in Federal Avenue,such <br /> installation must be as approved by the City and prior to finaling this permit the Port must execute an agreement acceptable to the <br /> City containing the terms and conditions for long-term retention of the conduit in the right of way. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control .................................................... $200.00 <br /> Paving(14,020SF)................................................... $70.10 <br /> Grade/Fill/Excavate(130CY).................................. $70.00 <br /> PW Plan Review................................................ $1,117.85 <br /> PW Site Inspection............................................ $2,235.69 <br /> Stormwater System Development Fee.............$3,691.47 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> � � may arise because of installation and maintenance the <br /> 10/26/2021 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> XAPPLICANT/JOB SITE COPY _TREASURER _ADDRESS FILE <br />