My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/06/22 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/06/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 10:19:23 AM
Creation date
6/24/2016 10:18:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g <br /> INTERLOCAL AGREEMENT <br /> BETWEEN <br /> THE CITY OF EVERETT AND PORT OF EVERETT REGARDING <br /> IMPROVEMENTS TO PUGET SOUND OUTFALL 1 <br /> This Interlocal Agreement("Agreement") is dated for reference purposes <br /> , 2016, and is between the CITY OF EVERETT(the"City")and the PORT OF <br /> EVERETT(the"Port")(individually a"Party"and collectively the"Parties"). <br /> RECITALS <br /> A. The City owns and operates Puget Sound Outfall No. 1 ("PSO 1"). A portion of <br /> PSO 1 needs to be replaced,which portion is on Port property. <br /> B. The Port is preparing to call for bids on a project near West Marine View Drive <br /> (the"New Port Project"). As part of this upcoming project, it would be efficient for the Port's <br /> contractor to install for the City the segment of PS 0 1 pipe in 14th Street west of West Marine <br /> View Drive,which will carry combined sewer overflow, eventually connecting to the PSO 1 and <br /> PSO 2 (the"New City Work"). The New City Work is schematically shown in the attached <br /> Exhibit 1. The New City Work will be paid for solely by the City. <br /> C. The City has provided to Port design and construction specifications for the New <br /> City Work,which the Port has approved(the"New City Work Approved Plans and <br /> Specifications"). The Parties have or shortly will have all permits necessary for the New City <br /> Work. <br /> D. The purpose of this Agreement is for the City and Port to formalize their <br /> understandings regarding the New City Work/New Port Project. _ <br /> AGREEMENT <br /> The Parties agree as follows: <br /> SECTION 1: NOT USED <br /> SECTION 2: NEW CITY WORK <br /> A. Not Used. <br /> B. Not Used. <br /> C. Procurement. <br /> 1. Construction Contract. After receipt of all necessary permits for the New <br /> City Work, the Port will call for bids and execute a construction contract for the New Port <br /> 126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.