Laserfiche WebLink
r <br /> 1 <br /> CITY OF EVERETT <br /> 2017 To 2022 Six-year Transportation Improvement Program <br /> Interstate Local Access and Other Projects(continued) <br /> 1. I-5 /Downtown Everett Interchange Access Improvements 1. Bridge Rehabilitation Program (Maintenance) <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave) 2. Annual Street Overlay Program (Maintenance) <br /> 2. I-5/100th Street SE HOV Access/Undercrossing 3. Sidewalk repair and replacement (l\faintenance) <br /> 3. NB Everett Mall Way/SB I-5 Onrarnp 4. Pavement marking projects (Maintenance) <br /> 4. I-5/Smith Island Interchange(12th St.or SR 529) <br /> 5. I-5/East Marine View Drive Interchange Improvements 1. 106th Place SE Improvements (Street) <br /> 6. I-5 HOV Lanes(US 2 to SR 528) 2. 3rd Avenue SE Improvements (Street) <br /> 7. I-5/128th Street Interchange 3. Local Street Improvements (Street) <br /> 8. I-5/128th Street HOV Ramps(Mariner Park&Ride) 4. Upper&Lower Ridge Rd.Improvements (Street) <br /> 9. I-5/112th Street Interchange Study 5. Riverfront Site Access Improvements (Street) <br /> 6. Downtown Streetscape Improvements (Street) <br /> Freeways <br /> 1. US 2 Improvements(1-5 to SR 204) 1. Traffic Signal Central Control RepL (Traffic Signals) <br /> 2. SR 526/Hardeson Road Interchange 2. Traffic Signal Interconnect (Traffic Signals) <br /> 3. SR 526 Extension(1-5 to US 2) 3. Traffic Signal Improvements (Traffic Signals) <br /> ' 4. SR 526/Evergreen Way Interchange 4. Traffic Sign Improvements (Traffic Signals) <br /> 5. SR 529/Smith Island Ramps <br /> 6. SR 526/40th Avenue W.Intersection Improvements 1. Neighborhood Block Grants (Neighborhoods) <br /> 2. Neighborhood Traffic Studies/Project (Neighborhoods) <br /> Principal Arterials 3. Residential Sidewalks (Neighborhoods) <br /> 1. W.Marine View Dr./Rucker/41st Freight Route Improvements Non-Motorized Trail/Path Improvements <br /> 2. Broadway Corridor Improvements(SR 529 to SR 526) 1. 36th St(or vicinity)/BNSF Rail T.ine Ped/Bike Crossing <br /> 3. SE Everett Mall Way(SR 99 to SR 526) 2. Smith Island Bike and Pedestrian Improvements <br /> 4. Arterial Safety Projects 3. Bicycle Master Plan Implementation <br /> 5. Evergreen Way Improvements(41st St to Gibson Road) 4. Riverside Bus Pk.Ped.Trail(16th to N.Broadway) <br /> 6. Evergreen Way Streetscape Improvements 5. West/East Marine View Drive Bike-Ped Improvements <br /> 7. I-5 to Port of Everett Truck Route 6. 47th Street Ped Improvements(Evergreen to Black Forest Lane) <br /> 8. Mnkilteo Blvd.Safety Imp.(Friday Ave.to City Limits) 7. Pigeon Creek No.1/BNSF Rail Line Crossing <br /> 9. Arterial Needs Study 8. Grand Avenue/North Marina Ped-Bike Connection <br /> 9. Shoreline Access Imp.(Various Locations) <br /> Minor Arterials 10. Snohomish River Bike/Pedestrian Bridge Evaluation <br /> 1. 116th Street SE Street Improvements(SR 527 to 35th) 11. Henry M.Jackson Ped.Bridge <br /> 2. 100th Street SW Street Improvements(4th Ave.W.to Airport) 12. Pigeon Creek Rd.No.1 Improvements <br /> 3. Casino Rd_Safety improvements(Evergreen to 5th Ave.) 13. Everett Non-motorized Projects(Various Locations in Everett) <br /> 4. 4th Avenue West Improvements(104th to 112th) 14. Lowell Snohomish River Road.Bike/Ped Connection <br /> 5. 100th Street SE Improvements(SR 527 to 7th Ave SE) 15. Riverfront District Bike/Ped Paths <br /> 6. 100th Street SE Improvements(7th Ave to Evergreen) 16. Interurban Trail Bike/Ped Path improvements <br /> 7. 110th Street SE Improvements(SR 527 to 35th St.) 17. Bicycle Detection Signals <br /> 8. Lenora St/Lowell-River Rd./BNSF Rail Line Xing 18. ADA Signals <br /> 9. Minor Arterial Streetscape Improvements 19. ADA Ramps <br /> 20. IVaterfr ont Place E.+planaele <br /> Collector Arterials Transit <br /> 1. East Everett Avenue/BNSF Overcrossing 1. Bus Replacements-2017 to 2022 <br /> 2. Bond Street Ped/Bike Improvements.(Kromer to Terminal) 2. Implementation of State CTR Law <br /> 3. Chestnut St. /Eclipse Mill Road.Improvements(Pacific to 36th) 3. Everett Station Repair and Updates <br /> 4. Silver Lake Road-121st Street SE Ped.Improvements 4. Operation Base Relocation and Construction <br /> 5. 37th Street Improvements(Rucker to Broadway) 5. Broadway Corridor Improvements <br /> 6. Collector Arterial Streetscape Improvements 6. Safety and Security Enhancements <br /> 7. On Board ITS replacement&upgrade <br /> Local Access and Other Projects 8. Service Planning&Development Software/Hardware <br /> 1. BNSF RR safety improvements (Safety) 9. Next Generation ORCA Project <br /> 2. Local roadway safety projects (Safety) <br /> 3. Safe routes to schools (Safety) Port-Marine Industrial Transportation Improvements <br /> 1. Marine Terminals Maintenance and Expansion(in accordance <br /> High Capacity Transit with adopted Marine Terminals Master Plan) <br /> 1. Light Rail-Lynnwood to Everett Extension 2. Marine Terminals.South Terminal Modernization Project <br /> 2. I ht Rail Stations 3. Harbor and Snohomish River Federal Navigation Channel <br /> 3. HCT Support Program Improvements <br /> 3 <br />