1.
<br /> CITY OF EVERETT 2017 TO 2022 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT PE RAN CONST. Est 2015-20 LEAD MAP
<br /> Number TYPE 4- PROJECT NAME TERMINI START START START Expenditures AGENCY NO.
<br /> 1 'Interstate I 1 I-5 Downtown interchange improvements Pacific,Everett,Hewitt Aves.,and US 2 Jan.17 Jun.18 Sep.18 $28,500,000 • EVERETT I 1
<br /> 2 Interstate 2 1-5/100th Street SE HOV AccessAlndercrossing 1-5 at 100th Street SE Jul.17 Jan.18 Jan.18 $68,500,000 • EVERETT 2
<br /> 3 I Interstate 3 INB Everett Mal Way to SB I-5 Onramp Everett Mall Way to southbound 1-5 I Jan.17 I May.18 $3,500,000 • WSDOT 3
<br /> 4 Interstate 4 I-5/Smith Island interchange 12th Ave.NE or SR 529 Jan.17 I Jun.18 Jul.18 $10,000,000 • EVERETT 4
<br /> 5 Interstate 5 1-5/East Marine View Drive Interchange 1-5 at East Marine View Drive Jan.17 Jun.18 Jun.18 $16,000,000 • EVERETT 5
<br /> 6 Interstate 6 I-5 HOV Lanes US 2 to SR 528 Jan.17 Jun.17 May.19 $5,000,000 • WSDOT 6
<br /> 7 Interstate 7 I-5/128th Street Interchange 1-5 at 128th Street Jan.17 Jan.19 May.21 $2,000,000 • WSDOT 7
<br /> 8 Interstate 8 1-5/128th Street HOV Ramps(Mariner PNR) I-5 at 128th Street/Mariner Park and Ride Jan.17 Jan.18 May.18 $6,000,000 WSDOT 8
<br /> 9 Interstate I 9 1-51112th Street Interchange Study I-5 at 112th Street SE Jan.17 $3,000,000 ' WSDOT 9
<br /> 10 Freeway 1 US 2 Improvements I-5 to SR 204 Jun.17 Jun.18 Jun.18 $3,000,000 • WSOOT 10
<br /> 11 Freeway 2 SR 526/1riardeson Road Interchange SR 526 at Hardeson Road Jun.17 Jun.18 Jun.18 _ $2,000,000 * WSDOT 11
<br /> 12 Freeway 3 SR 526 Extension Study SR 526 to US 2 Jun.17 $8,500,000 • WSDOT 12
<br /> 13 Freeway 4 SR 526/Evergreen Way Interchange SR 528 at Evergreen Way Jun.17 Jun.18 Jun.18 $38,000,000 • WSDOT 13
<br /> 14 Freeway 5 SR 526/40th Avenue West Interseclon SR 526 and 40th Avenue West Jun.17 Jun.18 Jun.18 $500,000 • EVERETT 14
<br /> 15 Freeway _ 6 SR 529/Smith Island Ramps SR 529 at Smith Island Jun.17 Jun.18 I Jun.18 $250,000 • WSDOT 15
<br /> 16 Principal Arterial 1 W.Marine View DrJRuckerAveJ41st St Freight W.Marine View Dr.,Rucker Ave,41st Street Sep.11 Jun.13 Jun.16 $42,800,000 ' EVERETT 16
<br /> 18 Principal Arterial 2 Broadway Corridor Improvements SR 526 to SR 529 Feb.18 Feb.17 I Jun.19 $4,000,0001• EVERETT 17
<br /> 19 Principal Arterial 3 SE Everett Mall Way SR 99 to SR 526 Feb.18 Feb.18 I Jun.18 51,000,000 • EVERETT 18
<br /> 20 Principal Arterial 4 Arterial Safety Projects(Forest Pk entrances;1-5 Various Locations Jan.17 I Mar.18 $900,000 • EVERETT
<br /> 21 Principal Arterial 5 Evergreen Way Improvements,41st to Airport Rr4lst to Airport Road Jan.18 Jul.18 I $1,000,000 • EVERETT 19
<br /> 22 Principal Arterial 6 Evergreen Way Streetscape Improvements 41st to Airport Road Jan.17 Jan.18 Jan.18 $20,000,000 • EVERETT
<br /> 23 Principal Arterial I 7 Interstate 5 to Port of Everett Truck Route Plan Port of Everett to 1-5 Jan.18 $200,000 * EVERETT I
<br /> 24 I Principal Arterial 8 Muklteo Blvd.Safety Improvements Friday Avenue to city limits Feb.17 Apr.18 $3,300,000• EVERETT 20
<br /> 25 Principal Arterial 9 Arterial Needs Study Various arterials within city limits Feb.17 $200,000 • EVERETT
<br /> 26 Minor Arterial 1 116th Street SE Improvements SR 527 to 35th Street SE Jan.17 JuL18 May.17 $3,000,000• EVERETT 21
<br /> 27 Minor Arterial 2 100th Street SW Improvements Airport Road to 4th Avenue West Feb.12 Jan.18 Jun.17 $3,600,000 • EVERETT 22
<br /> 28 Minor Arterial 3 Casino Road at 5th Ave.W.Road Intersection Ir Casino Road at Hardeson Road Mar.11 I Mar.12 May.18 5500,000 • EVERETT 23
<br /> 29 Minor Arterial 4 4th Avenue West Widening and Improvement 104th Street to 112th St SW Jan.11 Jan.12 May.18 $9,000,000 • SNO.ChTY. 24
<br /> 30 Minor Arterial 5 100th Street SE Improvements SR 527 to 7th Avenue SE Jan.17 Jan.18 May.18 $1,000,000 • EVERETT 25
<br /> 31 Minor Arterial 6 100th Street SE Improvements 7th Avenue SE to Evergreen Way Jan.17 Jan.18 May.18 I $1,000,000 * EVERETT 26
<br /> 32 Minor Arterial 7 110th Street SE Improvements SR 527 to 35th Street SE Jan.17 Jan.18 May.18 $2,000,000 • EVERETT 27
<br /> 33 Minor Arterial 8 Lenora St/BNSF Rail Line Overcrossing Lenora St&Lowell Sno.River Rd. Jul.17 Jul.18 May 18 $1,800,000 • EVERETT { 28
<br /> 34 Minor Arterial 9 Minor Arterial Expansions and Streetscaping Various Locations Jan.17 Jan.18 May.18 $400,000 * EVERETT
<br /> 35 Collector Arterial 1 East Everett AveJ BNSF Overcrossing East Grand Ave.to Railway Ave. Jan.17 Sep.18 Jun.18 $7,000,000 • EVERETT 29
<br /> 36 Collector Arterial 2 Bond Street Perl/Brke Improvements Kromer to Terminal Ave. Jun.17 Jan.14 Jul.15 $100,000 • EVERETT 30
<br /> 37 Collector Arterial 3 Chestnut StJEclipse Mill Rd.Improvements Pacific Ave.to 36th Street Jan.17 Jun.18 $3,350,000 • EVERETT 31
<br /> 38 Collector Arterial 4 Silver Lake Road-121st Si.SE Ped.Improv. 112th Street to SR 527 Jun.15 Jun.17 Jul.18 $1,600,000 ' EVERETT 32
<br /> 39 Collector Arterial 5 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave. Jun.17 Jun.18 $500,000 • EVERETT 33
<br /> 40 (Collector Arterial 6 IColectorArterial Streetscape Improvements Various Locations Jan.17 I Jun.15 Jul.18 $400,000 • EVERETT
<br /> $304,200,000
<br /> 0 A portion or all of the funding for this project has not yet been committed.
<br /> NOTE: Projects shown in bold type(if any)were not included in the 2016-2020 Six-Year TIP.
<br /> 4
<br />
|