Laserfiche WebLink
I <br /> CITY OF EVERETT 2017 TO 2022 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM <br /> Project PROJECT -t- PROJECT NAME PE RAN CONST. Est.2015-20 LEAD MAP <br /> Number TYPE START START START Expenditures AGENCY NO. <br /> 42 Local Access-SAF 1 1 EBNSF RR safety improvements I Jan.17 I I Jun.16 $600,001 • EVERETT43 Local Access-SAF 2 Local Roadway Safety Projects Jan.17 I Jun.16 $120,000• EVERETT <br /> 44 Local Access-SAF I 3 Safe Routes to Schools Jan.17 I Apr.16 $600,000 * EVERETT <br /> 45 Local Access-PR/M 1 Bridge Rehabifdation Program Jan.17 f{I 1.11.16 $3,000,000 • EVERETT 1 <br /> Jan.17 Jul.16 $6,000,000 EVERETT I <br /> 46 Local Access-PR/M 2 Annual Street Overlay Program Jan.17 May 16 $360,000 EVERETT <br /> 47 Local Access-PR/NT3 Sidewalk repair and replacement Jan.17 May 16 $210,000 EVERETT <br /> 48 Local Access-PR/M 4 Pavement Marking Project <br /> 49 Local AccessSTR 1 106th Place SE Improvements Nov.10 I Jun.16 $650,000 ' EVERETT 34 <br /> 50 Local Access-STR 2 3rd Avenue SE Street Improvements Jan.17 Apr.16 $675,000 ` EVERETT 35 <br /> Jul 17 May 16 $580,000 • EVERETT <br /> 51 Local AccessSTR 3 Local&LoImprovements Au 17 I -Jun.16 $300,000 ` EVERETT 36 <br /> 52 Local AccessSTR 4 Upper&LowRidR <br /> Lower Ridge Rd.SV.Improv. g <br /> 53 Local Access-STR 5 Simpson Site Access Improvements Aug.17 Jun.16 $2,000,000 • EVERETT 37 <br /> 54 Local AccessSTR 6 Downtown Streetscape Improvements JuL14 Jan.15 Apr.16 $8,000,000• EVERETT 38 <br /> Jan.17 Jul.15 $600,000 ' EVERETT <br /> 55 Local Access-SIG 1 Traffic Signal CentralController Replacement Jan.17 May.15 $240,000 ` EVERETT <br /> 56 Local SIG <br /> 3 Traffic Signal InterconnectJan.17 Jun.15 $900,000 • EVERETT <br /> 58 <br /> 57 Local Access-SIG 3 Traffic Signal Improvements <br /> 58 Local Access-SIG 4 Traffic Sign Improvements Jan.17 Jun.15 $500,000 * EVERETT <br /> 59 Local Access-NEI 1 Neighborhood Block Grants I Jan.17 May.15 $360,000 • EVERETT <br /> 60 Local Access-NEI 2 Neighb.Traffic Mitigation Studies&Projects I Jan.17 May.15 $2,400,000 •'EVERETT <br /> 61 Local Access-NEI 3 Residential Sidewalks I Jan.17 May.15 $2,400,000 • EVERETT <br /> Jan.06 Nov.16 I Jun.18 $2,800,000 ` EVERETT 39 <br /> 64 Local Access-NM 1 tith SIBike/Ped <br /> Rail Line Pemense Crossing I Jan.10 Jan.16 I May 18 $1,000,000 ' EVERETT' 40 <br /> 65 Local Access-NM 2 Smith Island Plan nements 1 Jan.16 Jan.16 $200,000 • EVERETT <br /> 66 Local Access-NM 3 BicyleMastergsPlan Park Implementation 16 $700,000 • EVERETT 41 <br /> 67 ILocal Access-NM 4 Riverside Business Park Pad trail Apr.09 Apr.16 <br /> Apr.16 I $500,000 • EVERETT 42 <br /> 66 ILocal Access-NM 5 WestlEast Marine View Drive Bike-Ped Improvements Aug.09 <br /> Jan.17 I Jun.16 $500,000 ` EVERETT 43 <br /> 69 Local Access-NM 6 Pigeon47tStreCreek Pedestrian Cussing Jan 10 I JuL 16 Jan.17 I $925,000 * EVERETT 44 <br /> 70 'Local Access-NM 7 Hnry No.rk P dF Crossing <br /> 71 Local Access-NM 8 Henry Jackson Park Ped Bridge Jan.07 May.16 Ju120 $2,700,000 ` EVERETT 45 <br /> I $1,050,000 •• EVERETT <br /> 72 ILocal Access-NM Grand AveJN.Marina Ped-Bike Connection Jan.15 Jan.16 May.17 Apr.15 I Jan.16 I $2,400,000 • EVERETT <br /> 73 Local Access-NM 10 Shoreline <br /> hsmi h ccessRiver Improvements Nov.01 I Jan.16 I $9,000,000 ` EVERETT 46 <br /> 74 Local Access-NM 11 Snohomish River Bike and Ped.Bridge Apr.17 Jan 18 I $1,000,0001• EVERETT 47 <br /> 75 Local Access-NM 12 Pigeon Creek Road No.l Improvements May.15 Aug.16 Jan.17 $1,500,000 • EVERETT 146 <br /> 76 Local Access-NM 13 Lowell Snohomish River Rd.Bike/Ped Connection y g• 1 <br /> 77 Local Access-NM 14 Everett Non-Motorized Projects May.15 I Aug.16 Jan.17 5760,0001` EVERETT <br /> 78 Local Access-NM 15 Riverfront District Bike/Ped Paths Jul.09 I Jan.16 $500,0001'IEVERETf <br /> 79 Local Access-NM 16 Interurban Trail Bike/Ped Path Improvements JuL 10 Jan.16 Jan.16 I I Jan.17 $500,OOD1` IEVERET I <br /> 80 Local Access-NM 17 Bicyle Detection Signals Jan.16 I Jan.17 $200,000 'EVERETT <br /> 82 T <br /> 81 I Local Access-NM 19 IADA Ramps Local Access-NM 18 ADA Signals I Jan.16 I j Jan.17 1 $200,0001" 'EVERETT I <br /> $57,130,000 <br /> NOTE:Projects shown in bold type(if any)were not included in the 2016-2620 Six-year TIP. <br /> •A portion or at of the funding for this project has not yet been committed. <br /> Codes: SAF=Safety; PR/M=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement <br /> NEI=Neighborhood Projects, LS=Landscaping Project NM=Non-Motorized Improvement <br /> 5 <br />