My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2022 PORT OF EVERETT Plans 2025-09-11 (3)
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
Plans
>
2600 FEDERAL AVE 2022 PORT OF EVERETT Plans 2025-09-11 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2025 9:19:41 AM
Creation date
9/11/2025 9:18:07 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Permit
B2201-016
Year
2022
Notes
MODULAR GUARDSHACK ON TOP OF CONCRETE FOUNDATION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATION SHEET <br /> "" ` 20080 - PORT OF EVERETT <br /> RESTROOM <br /> DESIGN LOADS: <br /> Date: 12/9/2021 Size: 10x46 Floor: 50 <br /> Customer: Pacific Mobile Description: Restroom Wind: 125/C <br /> Location: Everett, Washington Mobile Roof: 30 <br /> Project: Port of Everett - RR Unit Insignias: Washington <br /> THIS IS PART OF A "BUY AMERICAN" Install insignias on exterior of building as shown on A-3 <br /> CERTIFICATION PROJECT MBI Seal Provided <br /> FOUNDATION <br /> Block and level - Provided and installed on site by others -Tie down straps provided and installed by others <br /> STEEL FRAME <br /> Size: (1) 9'-8" x 46'-0" <br /> Type: Blazer built frame (no outriggers - Full width front and rear crossmembers) <br /> Main Rail: W 10 x 12 <br /> Axles: 4-Brake with 8:00x14.5 - 14 ply tires <br /> Hitch: Detachable <br /> FLOOR SYSTEM <br /> Joists: 2x8 @ 16" oc <br /> Rims: Single LVL 7-1/8" <br /> Frame Openings For: (3) Floor Drains <br /> NOTE: Recess floor at ADA showers <br /> Bottom Board: Class "A" woven polyethylene fabric <br /> Insulation: R30 - Use two layers of R15 unfaced fiberglass batt <br /> Decking (1 st): 23/32" (3/4") APA rated Sturd-I-Floor T&G — Glued and Nailed - PointSIX (turquoise edge) <br /> Decking (2nd): 1/4" U-PLYX - Entire Building <br /> WALL FRAMING <br /> Framing (Exterior): 2x6 and 2x4 @ 16" oc - Height = 114-1/2" and 117-1/2" <br /> Framing (Interior): 2x4 @ 16" oc - Plumbing walls to be 2x6 or 2x8 <br /> NOTE: Crosswall between restrooms built full height to bottom of rafters <br /> Plenum Wall: None <br /> Frame For: Doors and Wall Mount HVAC Unit <br /> ROOF STRUCTURE <br /> Style: Shed - Roof pitch = 1/4 / 12 <br /> Framing: 2x8 Rafters @ 24" oc <br /> Bottom cover: Class "A" woven polyethylene fabric <br /> Rims: Single LVL 1-1/2" x 7-1/8" <br /> Insulation: Cellulose blow in between rafters (R24) with two layers 1-1/2" rigid (R17) on top of roof framing <br /> Sheathing: 3/4" CDX plywood <br /> Venting: None <br /> SPEC-20080- Port of Everett(10x46 RR) Page 1 of 5 12/9/2021 10:21 AM AFC: <br />
The URL can be used to link to this page
Your browser does not support the video tag.