Laserfiche WebLink
Upper Roof Area (only one roof but insulation is saturated) <br /> • Install Guardrail and screen net around entire parapet walls <br /> • Demo existing roof down to concrete substrate <br /> • Adhere EPS Type II Taper System at 1/8" per ft, w/ R-38 average <br /> • Adhere Coverboard to taper insulation throughout <br /> • Cant Stripping at all vertical junctions <br /> • Adhere torch applied base sheet to coverboard <br /> • Adhere torch applied interply sheet <br /> • Adhere torch applied granulated cap sheet (standard white) <br /> • Run Membrane up and over parapet walls <br /> • Run Membrane up inside walls minimum 8" and terminate <br /> • Flash around all RTU's, VTR's, and cellular stanchions using <br /> PMMA <br /> • Flash around roof drains using PMMA <br /> • Install PMMA Traffic Coat walk pad from access point to <br /> cellular towers, and mechanical shed <br /> • Install new 24ga Standing Seam Prefinished Metal Coping Cap <br /> at parapets <br /> • 20 Year NDL Manufacturer Warranty Included <br />