Laserfiche WebLink
Project Information <br /> Taper Slope: 1/8" <br /> Cricket Slope: 1/4" <br /> Total Squares Handled: 72.80 <br /> Total Squares Applied: 63.66 <br /> Total Area of Roof: 63.26 <br /> Total Area Tapered: 63.26 <br /> Area of Non-Tapered: 0.00 <br /> Total Area of Crickets: 0.41 <br /> Average R-Value: 38.98 <br /> Taper Minimum: 6.75 <br /> Taper Maximum: 10.92 <br /> Cricket Minimum: 0 <br /> A22 A22 Cricket Maximum: 0.91 <br /> A21 Ae 1 Material Used: EPS <br /> A20 0 A20 <br /> CuN <br /> a A19 a9 A19 9a <br /> A18 P m A18 18m COMMERCIAL <br /> ^� J55 <br /> < Av ' 1 DISTRIBUTION SPECIALISTS <br /> ,n6 m6 A16 6,u ,/��,� <br /> At <br /> 5 15m These drawings are provided solely to facilitate <br /> !o �o tu N installation and quantity of tapered roof <br /> a s a a a a a a a a 4 a a a a a a a a a.. insulation systems,cricket panels,and fill. <br /> m 13 15 a Conditions such as,but not limited to, <br /> �6 A16 6' m a �6 A16 0 16 f + T i , construction debris,dimensions,and field <br /> ^ ^ a a ^ n j I I �, conditions are not the responsibility of SRS <br /> A17 A17 <br /> 7 7 �i a 7 7T q <br /> tin TA19 8m s m A18 18m Distribution. <br /> w A19 o a A19 a Customer LOBERG ROOFING <br /> 9 s Name: COMPANY <br /> A20 o A20 Project Name: Bank Of America <br /> A21 Everett <br /> Date Created: 05/23/2024 <br /> 113' c N Quote Number: 243-01905-111785-4 <br /> (EPS-1/8 AVG 38 <br /> MITER) <br /> Notes: 1.5#Denisty EPS <br /> (Mitered Valley Pieces) <br /> 1/8"/ft Tapered Slope <br /> 6.75"Starting <br /> Thickness to achieve <br /> Avg.R-38 1/4"/ft <br /> Cricket Slope <br />