Laserfiche WebLink
Lower Roof Area (only one roof layer <br /> • Install Guardrail and screen net around entire parapet walls <br /> • Demo existing roofing at all vertical junctions <br /> • Pressure wash existing roof to remove debris <br /> • Remove existing roofing around all vents and walls <br /> • Prime existing roofing in preparation for new roof system <br /> • Adhere torch applied base sheet to coverboard <br /> • Adhere torch applied interply sheet <br /> • Adhere torch applied granulated cap sheet (standard white) <br /> • Run Membrane up and over parapet walls <br /> • Run Membrane up inside walls minimum 8" and terminate <br /> • Flash around all RTU's, VTR's using PMMA <br /> • Flash around roof drains using PMMA <br /> • Install new 24ga Standing Seam Prefinished Metal Coping Cap <br /> at parapets <br /> • 20 Year NDL Manufacturer Warranty Included <br />