My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2508 GRAND AVE 2025-09-30
>
Address Records
>
GRAND AVE
>
2508
>
2508 GRAND AVE 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 10:24:19 AM
Creation date
9/17/2025 11:34:35 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2508
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2311-048 Description: FULL INTERIOR REMODEL WITH STRUCTURAL <br /> IMPROVEMENTS <br /> Applied: 11/16/2023 Approved: 12/15/2023 Site Address: 2508 GRAND AVE <br /> Issued: 12/18/2023 Finaled: City,State Zip Code:EVERETT,WA 98201-2718 <br /> Status: PERMIT ISSUED Applicant: FITCH DESIGN COMPANY <br /> Parent Permit:W2304-007 Owner: RYAN LINTON <br /> Parent Project: Contractor:SIGMA CONSTRUCTION LLC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> BLDG 05- CORRECTION <br /> 3/19/2024 3/19/2024 UNDERFLOOR RAKEEB KHAN REQUIRED SEE ATTACHMENT <br /> FRAMING <br /> Notes: <br /> TAVO GEMX@YAHOO.COM <br /> SPECIAL INSPECTION FOR CRAWL SPACE AND CEILING FRAMING IS IN ATTACHMENTS <br /> Missing triple Ivls at stair supports.Holdowns installed without special inspection.Will need special inspection for post installed holdowns.Framing <br /> doesn't match details provided.Provided updated engineering details.Recommend having engineer perform site visit.Need plumbing permit and <br /> inspection approval for work in the crawl. <br /> 4/11/2024 4/11/2024 BLDG 02- RAKEEB KHAN APPROVAL <br /> FOOTING/SETBACK <br /> Notes: <br /> (2)24"square post footings specified in new engineer letter.Upload new letter to permit. <br /> (2)24"square post footings specified in new engineer letter.Upload new letter to permit. <br /> BLDG 05- PARTIAL <br /> 4/11/2024 4/11/2024 UNDERFLOOR RAKEEB KHAN APPROVAL <br /> FRAMING <br /> Notes: <br /> TAVO_GEMX@YAHOO.COM <br /> rfk changed Inspection Type from BLDG 08-FRAMING to BLDG 05-UNDERFLOOR FRAMING <br /> Do not cover area where plumbing is located.Need new engineer letter uploaded to permit that was provided on site.Ok to cover floor as discussed. <br /> Do not cover area where plumbing is located.Need new engineer letter uploaded to permit that was provided on site.Ok to insulate floor <br /> 4/15/2024 4/15/2024 BLDG 12- RAKEEB KHAN PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> TAVO GEMX@YAHOO.COM <br /> Floor insulation. Do not cover floor area where plumbing is located. <br /> 6/7/2024 6/7/2024 BLDG 16-RE-ROOF RAKEEB KHAN OTHER <br /> FINAL" <br /> Notes: <br /> TAVO_GEMX@YAHOO.COM <br /> Wrong inspection.Contractor was expecting a plumbing rough in inspection not a building inspection. <br /> I <br /> Printed: Monday,02 June, 2025 1 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.