My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2508 GRAND AVE 2025-09-30
>
Address Records
>
GRAND AVE
>
2508
>
2508 GRAND AVE 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 10:24:19 AM
Creation date
9/17/2025 11:34:35 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2508
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> BLDG 05- <br /> 8/16/2024 8/16/2024 UNDERFLOOR Matt Schreifels APPROVAL see notes <br /> FRAMING <br /> Notes: <br /> Verified installation of straps and holddowns per E.O.R.'s site inspection and memo(see attachments).Ok to cover at areas of straps and hold downs. <br /> 8/16/2024 8/16/2024 BLDG 12- Matt Schreifels CORRECTION see notes <br /> INSULATION REQUIRED <br /> Notes: <br /> TAVO GEMX@YAHOO.COM <br /> Required to have rough in approval for all sub-permits as well as framing and fire stopping/blocking prior to insulation. Installed insulation will need to <br /> be removed in order to see all areas of new work for inspector to be able to visually inspect all areas of work. <br /> BLDG 05- <br /> 8/19/2024 8/19/2024 UNDERFLOOR Matt Schreifels NO ACCESS see notes <br /> FRAMING <br /> Notes: <br /> TAVO_GEMX@YAHOO.COM,425-328-6863 <br /> No Access. Knocked at front door and left inspection notification card. Please reschedule your inspection online for a new date when access will be <br /> available.To speak with an Inspector to get an ETA or to provide access instructions please ca11425-257-8810 option 3 between 7:30 a.m.and 8:30 a.m. <br /> the morning of your scheduled inspection. <br /> 8/22/2024 8/22/2024 TDG 08-FRAMING RAKEEB KHAN PARTIAL <br /> APPROVAL <br /> Notes: <br /> 425-328-6863 <br /> Need Electrical rough in for permit E2404-218 <br /> 8/22/2024 8/22/2024 -7BLDG 12- RAKEEB KHAN PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> 425-328-6863 <br /> Need electrical rough in approval.See framing correction. <br /> 8/27/2024 8/27/2024 BLDG 11-INTERIOR RAKEEB KHAN APPROVAL <br /> SHEAR <br /> Notes: <br /> 425-328-6863 <br /> 8/27/2024 8/27/2024 BLDG 12- RAKEEB KHAN APPROVAL see notes <br /> INSULATION <br /> Notes: <br /> Do not cover area where electrical for mini split is located. <br /> 9/27/2024 9/27/2024 BLDG 10-DRYWALL RAKEEB KHAN APPROVAL as noted <br /> NAILING <br /> Notes: <br /> octavio 425-328-6863 <br /> Area left open for electrical inspection regarding mini split permit e2404-218.Ok to drywall mud and tape these areas after electrical sign off. <br /> I <br /> Printed: Monday,02 June, 2025 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.