Laserfiche WebLink
R. <br /> BMP C160: Certified Erosion and Sediment Control Lead <br /> Purpose The project proponent designates at least one person as the responsible <br /> representative in charge of erosion and sediment control(ESC), and water <br /> quality protection. The designated person shall be the Certified Erosion <br /> and Sediment Control Lead (CESCL) who is responsible for ensuring <br /> compliance with all local, state, and federal erosion and sediment control <br /> and water quality requirements. <br /> Conditions of Use A CESCL shall be made available on projects one acre or larger that <br /> discharge stonnwater to surface waters of the state. Sites less than one <br /> acre may have a person without CESCL certification conduct inspections; <br /> sampling is not required on sites that disturb less than an acre. <br /> • The CESCL shall: <br /> • Have a current certificate proving attendance in an erosion and <br /> sediment control training course that meets the minimum ESC <br /> training and certification requirements established by Ecology(see <br /> details below). <br /> Ecology will maintain a list of ESC training and certification <br /> providers at: <br /> http://ANww.ecy.wa.gov/pro v 1A/stormwater/cescl.litnil <br /> OR <br /> • Be a Certified Professional in Erosion and Sediment Control <br /> (CPESC); for additional information go to: www.cpese.net <br /> Specifications • Certification shall remain valid for three years. <br /> • The CESCL shall have authority to act on behalf of the contractor or <br /> developer and shall be available, or on-call,24 hours per day <br /> throughout the period of construction. <br /> • The Construction SWPPP shall include the name,telephone number, <br /> fax number, and address of the designated CESCL. <br /> A CESCL may provide inspection and compliance services for <br /> multiple construction projects in the same geographic region. <br /> Duties and responsibilities of the CESCL shall include,but are not limited <br /> to the following: <br /> • Maintaining permit file on site at all times which includes the <br /> Construction SWPPP and any associated pen-nits and plans. <br /> Directing BMP installation, inspection, maintenance, modification, <br /> and removal. <br /> Vohnne ff—Construction Sionnivater Pollution Prevention-August 2012 <br /> 4-53 <br /> ; J <br />