Laserfiche WebLink
• Updating all project drawings and the Construction SWPPP with <br /> changes made. <br /> • Completing any sampling requirements including reporting results <br /> using WebDMR. <br /> • Keeping daily logs, and inspection reports. Inspection reports should <br /> include: <br /> • Inspection date/time. <br /> • Weather information; general conditions during inspection and <br /> approximate amount of precipitation since the last inspection. <br /> • A summary or list of all BMPs implemented, including <br /> observations of all erosion/sediment control structures or practices. <br /> The following shall be noted: <br /> 1. Locations of BMPs inspected. <br /> 2. Locations of BMPs that need maintenance. <br /> 3. Locations of BMPs that failed to operate as designed or <br /> intended. <br /> 4. Locations of where additional or different BMPs are required. <br /> • Visual monitoring results, including a description of discharged <br /> stormwater. The presence of suspended sediment,turbid water, <br /> discoloration, and oil sheen shall be noted,as applicable. <br /> • Any water quality monitoring performed during inspection. <br /> • General comments and notes, including a brief description of <br /> any BMP repairs, maintenance or installations made as a result <br /> of the inspection. <br /> • Facilitate,participate in, and take corrective actions resulting from <br /> inspections performed by outside agencies or the owner. <br /> BMP C162: Scheduling <br /> Prsipose Sequencing a construction project reduces the amount and duration of soil <br /> exposed to erosion by wind, rain, runoff, and vehicle tracking. <br /> Conditions of Use The construction sequence schedule is an orderly listing of all major land- <br /> disturbing activities together with the necessary erosion and sedimentation <br /> control measures planned for the project. This type of schedule guides the <br /> contractor on work to be done before other work is started so that serious <br /> erosion and sedimentation problems can be avoided. <br /> Following a specified work schedule that coordinates the timing of land- <br /> disturbing activities and the installation of control measures is perhaps the <br /> most cost-effective way of controlling erosion during construction. The <br /> removal of surface ground cover leaves a site vulnerable to accelerated <br /> Volume H—Coilstt•tietion 5fo7111)UClte]-Pollution Prevention -August 2012 <br /> 4-54 <br />