My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY LEARNING RESOURCE CENTER 2026-01-15
>
Address Records
>
N BROADWAY
>
1001
>
LEARNING RESOURCE CENTER
>
1001 N BROADWAY LEARNING RESOURCE CENTER 2026-01-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2026 8:47:21 AM
Creation date
9/23/2025 9:58:56 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
LEARNING RESOURCE CENTER
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1616
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: K2110-009 Description: NFPA 13-2016, DESIGN&INSTALL NEW WET SYSTEM. <br /> (665)HEADS <br /> Applied: 10/29/2021 Approved: 12/7/2021 Site Address: 1001 N BROADWAY <br /> Issued: 12/10/2021 Finaled: 3/21/2023 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant: MARCO BELLUTTA <br /> Parent Permit: B2008-007 Owner: EVERETT COMMUNITY COLLEGE <br /> Parent Project: Contractor: COLUMBIA FIRE INC <br /> Details: <br /> NFPA 13-2016,DESIGN&INSTALL NEW WET SYSTEM. (665) HEADS <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> K 01-FIRE <br /> 4/14/2022 4/14/2022 5:00 SUPPRESSION RUSSELL JACK APPROVAL Flush passed <br /> PM UNDERGROUND/FL <br /> USH <br /> Notes: <br /> 1001 N Broadway <br /> Rich 206-793-7504 <br /> Billy Forebush 425-750-3291 <br /> K 02-FIRE CORRECTION <br /> 6/6/2022 6/6/2022 SUPPRESSION JEFF ALFORD REQUIRED See notes <br /> HYDRO TEST <br /> Notes: <br /> First floor hydro not conducted.Ok to cover first floor hard lid area.Drop ceiling area still needs inspection <br /> K 03-FIRE PARTIAL <br /> 6/6/2022 6/6/2022 SUPPRESSION JEFF ALFORD APPROVAL See notes <br /> COVER/ROUGH-IN <br /> Notes: <br /> First floor hard ceiling area ok to cover. Drop ceiling areas still need inspection. Hydro still needed on entire first floor. <br /> K 02-FIRE PARTIAL <br /> 6/16/2022 E <br /> 6/2022 SUPPRESSION JEFF ALFORD APPROVAL Floors 1&2 Hydro Ok <br /> HYDRO TEST <br /> Notes: <br /> Contact: <br /> Ryan 253-293-0614 <br /> Hydro/cover on floors 1&2 <br /> I <br /> Printed:Wednesday, 24 September, 2025 1 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.