My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY LEARNING RESOURCE CENTER 2026-01-15
>
Address Records
>
N BROADWAY
>
1001
>
LEARNING RESOURCE CENTER
>
1001 N BROADWAY LEARNING RESOURCE CENTER 2026-01-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2026 8:47:21 AM
Creation date
9/23/2025 9:58:56 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
LEARNING RESOURCE CENTER
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1616
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> K 03-FIRE PARTIAL <br /> 6/16/2022 PM 6/16/2022 PM SUPPRESSION JEFF ALFORD APPROVAL See Notes <br /> COVER/ROUGH-IN <br /> Notes: <br /> (6/14/2022 12:30 PM JA) <br /> Contact: <br /> Ryan 253-293-0614 <br /> Hydro/cover on flloors 1&2 <br /> (6/16/2022 12:49 PM JA) <br /> Ok to cover floor 2 hard lid areas.Grid ceiling areas still need cover inspection.Ensure sprinkler heads are placed in hard lid area above 2nd floor stairs <br /> K 02-FIRE <br /> 7/18/2022 AM 7/18/2022 SUPPRESSION JEFF ALFORD APPROVAL Floors 1,2,3 <br /> HYDRO TEST <br /> Notes: <br /> K 03-FIRE <br /> 7/18/2022 AM 7/18/2022 SUPPRESSION JEFF ALFORD APPROVAL Hard Lid only 1,2,3 <br /> COVER/ROUGH-IN <br /> Notes: <br /> K 03-FIRE <br /> 8/15/2022 AM 8/15/2022 SUPPRESSION KURTIS BROWN APPROVAL Floors 1 and partial 2 See notes <br /> COVER/ROUGH-IN <br /> Notes: <br /> Site contact,Brian 425-954-9922,requesting a Noon cover inspection. <br /> Columbia Fire 206-232-8569 <br /> (8/15/2022 1:29 PM KAB) <br /> Floor 1 completed,Floor 2 also completed with the exception of hallways and north portion of atrium. <br /> K 03-FIRE <br /> PARTIAL <br /> 9/14/2022 9/14/2022 SUPPRESSION JEFF ALFORD <br /> COVER/ROUGH-IN APPROVAL <br /> Notes: <br /> Floors 1&2 completed with the exception of Room 211(Flex Classroom)needs grid ceiling in place. <br /> 1st floor north corridor hallway <br /> One head above level 2 east stairway needs placed <br /> K 03-FIRE <br /> 10/18/2022 Elo/ <br /> 18/2022 SUPPRESSION FIRE INSPECTOR APPROVAL <br /> COVER/ROUGH-IN <br /> Notes: <br /> Foil needs removed from upright sprinkler head in non-gridded utility rooms floor 2&3 <br /> Floor 3 south utility room has an AC unit obstruction the upright sprinkler head.Sprinkler needs relocated to the side or below the obstruction. <br /> OK to cover floors 2&3 <br /> I <br /> Printed:Wednesday, 24 September, 2025 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.