Laserfiche WebLink
2015 Washington State E. j Code Compliance Forms for Commercial,R2 and R3 ove,,. ,.Tories and all R1-Page 9 of 17 <br /> Mechanical Permit Plans Checklist MECH-CHK, <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over3 stories and all R1 Revised January 2017 <br /> Project Title: Everett Community College-Learning Resource Center Date 7/24/2020 <br /> The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the <br /> Washington Slate Energy Code,Commercial Provisions. <br /> Applicable(yes,no,na) Code Section Code Provision Information Required-Must be in permit documents Location in Building Department <br /> Documents Notes <br /> C403.7, Application of single duct Indicate VAV terminal <br /> NA and fan-powered terminal types on plans;verify fan-powered terminal units only serve perimeter <br /> Item 11 units zones with envelope loads;verify all other zones are served by single duct terminal units NA <br /> C403.7, Fan-powered terminal unit Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint <br /> NA Item 12 r) of all fan-powered terminal units to the minimum required to maintain ventilation during <br /> prima air reset occupied heating or deadband,based upon the VAV air handling unit OSA ventilation fraction <br /> NA <br /> For spaces>150 sf with occupant density a 25 people/1000 sf,indicate space is served by a <br /> NA C403.7, High occupancy space dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint;also <br /> Item 13 controls indicate occupancy sensorcontrol that automatically reduces minimum ventilation to zero and <br /> sets back room heating and cooling setpoints by>_5'F NA <br /> For server,electronic equipment,telecom or similar spaces with cooling loads>5 WJsf, <br /> NA <br /> C403.7, indicate spaces are served by independent HVAC systems that are separate from HPVAV <br /> Item 14 Dedicated HVAC systems <br /> systems serving rest of building:indicate dedicated HVAC systems have air economizer <br /> controls or energy recovery per C403.3 Exception 9 NA <br /> Indicate whether systems are served by a high efficiency heating water plant,or a high <br /> efficiency chilled water plant NA <br /> If complying via high efficiency heating water plant:indicate all VAV terminals have hydronic <br /> heating coils served by heating water system with either gas-fired boiler(s)with thermal <br /> NA C403.7, Central plant efficiency efficiency z 90%,air-to-water heat pumps,or heat recovery chillers NA <br /> Item 15 If complying via high efficiency chilled water plant:Indicate all VAV air handlers have cooling <br /> coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least <br /> 25%per Table C403.2,3(7)(note water-cooled IPLV is max,all others are min);indicate <br /> smallest chiller or compressor in plant is s 20%of total plant capacity,or provide thermal <br /> storage sized for s 20%of total plant capacity NA <br /> C403.7, Fault detection and Indicate DOG system includes a fault detection and diagnostics(FDD)system configured to <br /> NA Item 16 diagnostics monitor operation and provide fault reporting of required parameters for all VAV air handlers <br /> and VAV air terminal units in the HPVAV system NA <br /> HVAC Equipment Energy Use Metering <br /> M7,M10 <br /> HVAC equipment energy For new buildings>50,000 sf and building additions>25,000 sf,verify energy use metering of M7,Ser & <br /> Yes C409.3.1 all equipment used to provide space heating and cooling,dehumidification and ventilation wal Electrical <br /> use metering be provided per C409;indicate equipment eligible for exception <br /> Plans <br /> Documentation and System Specific Requirement To Support Commissioning <br /> Indicate that all mechanical systems,equipment,and controls for which the WSEC requires Spec <br /> control functions and /or configuration to perform specific functions are required to be 230800- <br /> commissioned; <br /> By Cx <br /> Yes C408.2 Scope of mechanical Agent <br /> systems commissioning For buildings with 2 240,000 Btu/h total output cooling capacity or a 300,000 Btulh total output Spec <br /> heating capacity,indicate that all mechanical systems regardless of individual capacity are 230800- <br /> required to be Commissioned;or provide building heating/cooling capacity calculation By Cx <br /> demonstrating eligibility for exception Agent <br /> Spec <br /> Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical 230800- <br /> systems; By Cx <br /> C403.2.10 Agent <br /> C406.1.1 Commissioning Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 Spec <br /> Yes C408.1.2 requirements in construction including;narrative description of activities,responsibilities of the Cx team,schedule of 230800- <br /> C408.1.4.2 documents activities including verification of project Close out documentation per C103.6,and conflict of By Cx <br /> C103.6 interest plan(if required); Agent <br /> Include in general summary that a Cx project report or Compliance Checklist(Figure Spec <br /> C408.1.4.2)shall be completed by the Certified Cx Professional and provided to the owner 230800- <br /> By Cx <br /> prior to the final mechanical inspection. Agent <br /> Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances Spec <br /> Yes C408.2.2 Air system and hydronic defined in the specifications;indicate 230800- <br /> system balancing p systems shall be balanced in a manner to first minimize By Cx <br /> throttling losses,then adjusted to meet design flow conditions Agent <br /> Spec <br /> Yes C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets,zone terminals and 230800- <br /> devices air handling equipment requiring system balancing By Cx <br /> Agent <br /> Spec <br /> Yes C408.2.2.2 Hydronic system balancing Indicate devices that provide the capability to isolate,balance and measure flow across all 230800- <br /> devices hydronic equipment requiring system balancing including heating and tooling coils and pumps By Cx <br /> Agent <br /> Spec <br /> Yes C408.2.3 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during 230800- <br /> te sting criteria all modes of operation,including interfacing between new and existing-to-remain systems By Cx <br /> Agent <br /> Project Close Out Documentation <br />............................................ <br />