Laserfiche WebLink
Clearing/grading work shall comply with the Stormwater Manual, geotechnical <br /> recommendations, SEPA (State Environmental Policy Act) conditions, and other applicable <br /> regulations and standards. <br /> Installation Schedules: Install BMPs after soil disturbance. <br /> Inspection and Maintenance plan: Reseed and protect with mulch any areas that experience <br /> erosion. <br /> Responsible Staff: Contractor <br /> 2.1.7 Element 7: Protect Drain Inlets <br /> List and describe BMPs: Storm Drain Inlet Protection (BMP C220) <br /> Catch basin filters prevent coarse sediment from entering drainage systems prior to permanent <br /> stabilization of disturbed areas. <br /> Installation Schedules: Install catch basin filters prior to construction activities. <br /> Inspection and Maintenance plan: Inspect catch basin filters frequently (at least once per <br /> calendar week), especially after storm events. Clean and replace clogged inserts. Do not wash <br /> sediment into storm drains while cleaning. <br /> Responsible Staff: Contractor <br /> 2.1.8 Element 8: Stabilize Channels and Outlets <br /> Provide stabilization, including armoring material, adequate to prevent erosion of outlets, <br /> adjacent stream banks, slopes, and downstream reaches. <br /> List and describe BMPs: Not Applicable. There are no existing stream channels or other natural <br /> discharge points within the project limits. <br /> Installation Schedules: NA <br /> Inspection and Maintenance plan: NA <br /> Responsible Staff: NA <br /> 2.1.9 Element 9: Control Pollutants <br /> The following pollutants are anticipated to be present on site: <br /> Table 2 — Pollutants <br /> Pollutant (List pollutants and source, if applicable) <br /> Dust released from demolished buildings, asphalt, and construction activities <br /> Process water and slurry from concrete handling <br /> F, g e 19 <br />