Laserfiche WebLink
EXHIBIT A <br />PROFESSIONAL SERVICES AGREEMENT <br />TASK 4. PRELIMINARY AND FINAL PUNCH LIST <br />4.1 Prepare for and attend in person (1) Preliminary and (1) Final Punch List Inspection. <br />Provide final punch list notes and photographs. <br />TASK 5. AS BUILT PLANS <br />5.1 Provide (1) set of As Built plans from Contractor-provided redline drawings. <br />Assumptions: <br />• Construction support limited to the estimated hours as shown in the fee proposal. City <br />has the option to reallocate funds between tasks and between consultants. <br />• Scope does not include archaeological monitoring during construction. <br />• As-Built documents are not field verified by consultant team. <br />• All documents in electronic (PDF) format. <br />• As Builts in both PDF and CAD format. <br />Deliverables: <br />• Preconstruction Agenda and Meeting Notes <br />• Weekly (or as on site) Construction Agenda and Meeting Notes <br />• RFI, ASI, Change Order, Pay Request responses <br />• Preliminary and Final Punchlist <br />• As-Built Plans <br />Forest Park Pickleball Court Improvements <br />Amendment 1 Construction Administration - Fee Summary <br />August 2025 <br />Compensation: <br />Maximum hourly additional compensation not to exceed $59,123.44 <br />4