Laserfiche WebLink
Describe drainage flow paths (direction, location): <br />Currently the drainage flows into rain gardens around the main structure. All <br />other flows move from west to east towards the rear lot line abutting the <br />alleyway <br />Are there Critical Areas? What are they and where are they located relative to your project? <br />(Check with the Planning Division at olanning(a)everettwa.gov if you are unsure if the property is in <br />close proximity to a Critical Area.): <br />None exist near my project <br />Task 2: Describe proposed project <br />Describe your proposed project: <br />The project will consist of construction and attachment of a modular 340 sgft <br />detached accessory dwelling unit, an adjacent concrete parking pad, and rebuild <br />of previously demolished garage <br />How will your project change the existing condition?: <br />The project will add approx. 700 sgft of impervious surface <br />Describe roofs, patios, driveways, or structures added: <br />The roofs of the DADU will be low slope asphalt shingles with a 6" & 18" <br />overhang around the backsides and front respectively. The entry deck will be <br />covered with no additional overhang. The garage will have a higher slope with <br />19" nvPrhann-._ ThP narkinn nsd will ha annrnx. 180 gnft of IPvPI rnnrrPtP <br />How will stormwater be managed in the final condition?; <br />Stormwater will be drained into downspout dispersion trenches <br />Describe how the projectwill affect existing drainage systems onsite or on adjacent properties <br />or both: <br />The project will add an additional approx. 700 sgft of drainage directly into the <br />sewer that previously was not existing. All the drainage flow from the proposed <br />project will be managed on -site through downspout dispersion. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report for Projects in <br />the Combined Sewer Area -April 2021 <br />