Laserfiche WebLink
MIT <br /> u u Seattle Son Francisco Los Angeles <br /> fl f� �< <br /> F�_- - - - <br /> Permit Correction Letter <br /> To: James Bronder, Plans Examiner Date: 11 January 2021 <br /> City of Everett, Permit Services Permit#: B2008-007 <br /> From: Cheryl Cohen, Mithun Project. Everett Community College <br /> Learning Resource Center <br /> 1001 N Broadway <br /> cc: <br /> Re: Permit # B2008-007 Correction Notice Response Letter <br /> The following is a brief summary of plan updates since the initial submittal.All items noted below <br /> are revision clouded in the revised permit submission. <br /> Added or Removed Sheets and added details: <br /> • Sheets A0.33, A0.34, A0.35 with door&glazing frame types <br /> • Details 3, 6, and 7 added to sheet A1.1 1 for trash enclosure construction <br /> • Overall RCP sheets have been deleted from the drawing set, sheets A2.51, A2.52, and <br /> A2.53 since they duplicated information more easily viewed on sheets A2.61 A, A2.61 B, <br /> A2.62A, A2.62B, A2.63A, and A2.63B <br /> • Sheets A3.21 and A3.22 added for exterior fenestration elevations <br /> • Wall section detail 5 added to sheet A3.64 <br /> • Wall section detail 4 added to sheet A3.65 <br /> • Sheet A3.67 added for rooftop mechanical screen enclosure <br /> • Sheets A7.01, A7.02, A7.11, A7.21, A7.22, A7.23, A7.41, A7.42, A8.01, A8.02, A8.11, A8.12, <br /> A8.22, A8.32, A8.33 have been added with additional exterior assembly and interior wall <br /> and ceiling details <br /> Design updates: <br /> • Sheet A2.21 B: Presentation Storage and Coffee Room locations switched positions. <br /> Accessible height sink added to Gallery Storage. <br /> • Sheet A2.23A: Revised layout of Circulation Desk, Reference desk and shelving in the <br /> Reading Room. Additionally, a built-in bench was added <br /> • Sheet A2.23B: Janitor's room was divided to create Mech Room 315A for location of a <br /> hot water heater. Revised entrance configuration of the Cataloging/ III/Serials room. <br /> Added casework at the General collections along the demising wall to the elevator <br /> • A2.61 A: Lighting track and structural support steel for lighting track added to the <br /> Production Studio <br /> • A2.62A:Spring hung ceiling added at the Production Studio <br /> Structural updates: <br /> • Added structural detail for Trash Enclosure <br /> • Added Load Map <br /> • Added detailed stairs <br /> • Updated Baseplate Schedule with Project Column Sizes <br /> Please see below responses to each of the correction items. <br /> Architectural <br /> Correction #1. <br />