My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY 2020 EVCC 2025-10-03
>
Address Records
>
N BROADWAY
>
1001
>
EVCC
>
1001 N BROADWAY 2020 EVCC 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:23:53 AM
Creation date
9/26/2025 11:35:03 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
EVCC
Year
2020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concrete thickness be increased by an amount equal to the diameter of the dowels. The base course <br /> should be compacted to at least 95 percent MDD. <br /> We recommend PCC pavements incorporate construction joints and/or crack control joints spaced <br /> maximum distances of 12 feet apart, center-to-center, in both the longitudinal and transverse directions. <br /> Crack control joints may be created by placing an insert or groove into the fresh concrete surface during <br /> finishing, or by sawcutting the concrete after it has initially set-up. We recommend the depth of the crack <br /> control joints be approximately one-fourth the thickness of the concrete; or about 1.5 inches deep for the <br /> recommended concrete thickness of 6 inches. We also recommend the crack control joints be sealed <br /> with an appropriate sealant to help restrict water infiltration into thejoints. <br /> 4.7.4.Asphalt-Treated Base <br /> If pavements are constructed during the wet seasons, consideration may be given to covering the areas <br /> to be paved with ATB for protection. Light-duty pavement areas should be surfaced with 3 inches of ATB, <br /> and heavy-duty pavement areas should be surfaced with 6 inches of ATB. Prior to placement of the final <br /> pavement sections, we recommend the ATB surface be evaluated and areas of ATB pavement failure be <br /> removed and the subgrade repaired. If ATB is used and is serviceable when final pavements are <br /> constructed, the CSBC can be eliminated, and the design PCC or asphalt concrete pavement thickness <br /> _ can be placed directly over the ATB..The contractor may need to increase the thickness of these <br /> recommended ATB sections based on planned heavy equipment and traffic loading. <br /> - 4.8. Drainage Considerations <br /> The contractor should anticipate shallow perched groundwater conditions may develop and seepage may <br /> enter excavations depending on the time of year construction takes place, especially in the spring and <br /> winter months. However,we expect this seepage water can be handled by digging interceptor trenches in <br /> the excavations and pumping from sumps. The seepage water if not intercepted and removed from the <br /> excavations will make it difficult to place and compact structural fill and may destabilize cut slopes. <br /> All paved and landscaped'areas should be graded so surface drainage is directed away from the building <br /> to appropriate catch basins. <br /> Water collected in roof downspout lines must not discharge into or be routed to the perforated pipes <br /> intended for footing or wall drainage. <br /> 4.9. Lid and Infiltrator Consi&�r t'Rons <br /> Sieve analyses were performed on selected soil samples collected from the borings that were completed <br /> as part of this study. The soil samples typically consisted of native weathered or relatively unweathered <br /> glacial soils. Design infiltration rates for glacially consolidated deposits based on grain size analyses are <br /> not recommended by the Washington State Department of Ecology Storm Water Management Manual <br /> (2014). <br /> Based on our analysis, it is our opinion that the on-site soils have a very low infiltration capacity. The <br /> majority of the soils across the site are composed of glacially consolidated, dense advance outwash with <br /> a relatively high fines content, which limits the infiltration capacity. The results of the sieve analyses <br /> indicated that the fines content (material passing the U.S. No. 200 sieve) typically ranges from about 10 <br /> to 26 percent. Due to the density of the native glacial soils and relatively high fines content, infiltration <br /> GWENGINEERS� lufy 22,2Q19 €'age 17 <br /> -.., file NO.5S26.011-00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.