Laserfiche WebLink
should be assumed to be low when designing infiltration systems.We recommend a preliminary long-term <br /> design infiltration rate of not more than 0.25 inches per hour be used for design of the infiltration <br /> facilities in the native glacial soils. <br /> If infiltration facilities will be used for this project, we recommend that in-situ testing, such as pilot <br /> infiltration tests (PIT), be completed in accordance with the governing jurisdictional requirements to more <br /> accurately determine the infiltration capacity of the soil. <br /> 5.0 RECOMMENDED ADDITIONAL GEOTECHNICAL SERVICES <br /> Throughout this report, recommendations are provided where we consider additional geotechnical <br /> services to be appropriate. These additional services are summarized below: <br /> GeoEngineers should be retained to review the project'plans and specifications when complete to <br /> confirm that our design recommendations have been implemented as intended. <br /> GeoEngineers should be retained to provide additional recommendations for design of stormwater <br /> infiltration facilities, including performing pilot infiltration testing, if infiltration is being considered at <br /> the site. <br /> During construction, GeoEngineers should observe and evaluate the suitability of the wall and <br /> foundation subgrades, observe removal of.unsuitable soils, evaluate the suitability of floor slab and <br /> pavement subgrades, observe installation of subsurface drainage measures including footing drains, <br /> observe and test structural,backfill including wall and'trench backfill, and provide a summary letter of <br /> our construction observation services.The purposes of GeoEnglineers construction phase services are <br /> to confirm that the subsurface conditions are consistent with those observed in the explorations and <br /> other reasons described in Appendix D, Report Limitations and Guidelines for Use. <br /> 6.0 LIMITATIONS' <br /> We have prepared this report"for the exclusive use of EvCC and their authorized agents for the planned <br /> LRC building, in Everett, Washington. The data and report should be provided to prospective contractors <br /> for the bidding or estimating purposes, but our report, conclusions and interpretations should not be <br /> construed as a warranty of the subsurface conditions. <br /> Within the limitations of scope, schedule and budget, our services have been executed in accordance <br /> with generally accepted practices in the field of geotechnical engineering in this area at the time this <br /> report was prepared. No warranty or other conditions, express or implied, should be understood. <br /> Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if <br /> provided, and any attachments are only a copy of the original document. The original document is stored <br /> by GeoEngineers, Inc. and will serve as the official document of record. <br /> Please refer to Appendix D for additional information pertaining to use of this report. <br /> GMENGINEERS� au!y 22,2019 rage 18 <br />