My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT Plans 2025-09-26
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
Plans
>
2600 FEDERAL AVE 2021 PORT OF EVERETT Plans 2025-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 2:02:42 PM
Creation date
9/26/2025 1:56:04 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Permit
PW2112-023
Year
2021
Notes
SITEWORK FEDERAL AVE AND NORTON TERMINAL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br /> 1. ALL WORK BELOW ORDINARY HIGH WATER(OHW) LINE SHALL OCCUR IN THE <br /> PORT GARDNER BAY 'DRY'. <br /> EAST WATERWAY 2. EXCAVATION AND PLACEMENT OF ROCK BELOW HTL SHALL OCCUR WITHIN A <br /> SINGLE TIDE CYCLE. IF WORK IS NOT COMPLETED WITHIN A SINGLE TIDE <br /> CYCLE,TEMPORARILY COVER AND STABILIZE EXPOSED SOILS WITH GRAVEL, <br /> 6p GEOTEXTILE OR OTHER APPROVED METHODS PRIOR TO TIDAL SUBMERSION, <br /> E RIPRAP ENERGY DISSIPATOR, CONSTRUCTION KEY NOTES <br /> C4.9 C4.10 SLOPE TO MATCH EX GRADE <br /> \\ EX TIDEFLAT 0RESTORE RIPRAP TO ITS ORIGINAL ELEVATION, DEPTH,AND LIMITS <br /> \ ^'C4.10 SUBSTRATE FOLLOWING OUTFALL REPLACEMENT. <br /> C4.9 <br /> (SAND/GRAVEL) <br /> \ \ O2 KEY RESTORED RIPRAP INTO EXISTING RIPRAP FOLLOWING OUTFALL <br /> \ \ REPLACEMENT WORK. <br /> \ \ O3 EXISTING RIRRAP AND CONCRETE RUBBLE THAT IS REMOVED FOR <br /> \\ OUTFALL M CONSTRUCTION SHALL BE STOCKPILED IN A CONTAINED AREA <br /> \\ \\ DEMO EX 12"OUTFACE, AT THE UPLANDS FOR CHARACTERIZATION BY THE PORT IN <br /> \ \ IE=0.10' \ _ CONFORMANCE WITH THE SOIL AND GROUNDWATER MANAGEMENT PLAN. <br /> \ \\ <br /> ---- --- \ \�- O4 RIPRAP SHALL BE REPLACED WITH NEW MATERIALS THAT THE REQUIRED <br /> \\ \ O - — \ <br /> \ \ \ 1 \ 1OC EX CONC IMPORT CRITERIA AS DESCRIBED IN THE SPECIFICATIONS. <br /> \ \ \ Q —— \ \ :DED AND REPL w <br /> -EX PILE BENT \ \ \ <br /> \ \ \ EX RIPRAP =ALL CONSTRUCTION. <br /> 3 \ SLOPE, TYP —————— io <br /> --��OUTFALL M O \\\ — --— os '� EX BERM <br /> =OUTFACE REPLACEMENT, <br /> IE ——— <br /> —� ---- <br /> ----- - - APPROX DEW ELEV= 7.9T CB TYPE 2 72. <br /> ' DIA W/48" <br /> (ELEV VARIES ALONG SHORELINE) SQUARE ACCESS HATCH , <br /> RIM= 17.10 17.28 ' <br /> IF-AAR4 6.82 (36"E,W) <br /> N iC/ <br /> \ SEE PROFILE FOR CASING F <br /> — PIPE AT SHORELINE _ o _ - O&w S C L J IN-LINE CHECK VALVE <br /> .TRENCH CUTOFF WALL.SEE_ - _ �- OR APPROVED EQUAL <br /> DETAIL 3 ON SHEET C4.14 _ SEE DETAIL 3 ON C4.13 <br /> "V W-— 14 LF-36"HDPE DR <br /> Q 13.5,S=0.39 <br /> REPLACE EX 12" -'o`� � ip�9 � <br /> I PVC WITH 11" 77 P p <br /> EX PVMT HDPE DR 13.5 2 12 <br /> �\ <br /> DEMO EX CONIC VAULT 14� 1-�], j 7.pg— P(APPROX 6.5'Wx18.5'Lx10'D) / �" RIM=+7-R7- —— - <br /> 7.08 <br /> VALVE VAULT, <br /> SAWCUT AND DEMO EX ACP FOR OUTFALL <br /> M REPLACEMENT. RESTORE SURFACE / <br /> ✓ v <br /> FLUSH WITH SURROUNDING ACP WITH <br /> 1-FOOT MIN DEPTH STREAMBED COBBLES <br /> REPLACE EX 21" <br /> \ WOOD STAVE PIPE WITH �' T 5— HIGH FLOW BYPASS/LIFT STATION, <br /> �- 36"HDPE DR 13.5 c� <br /> � SEE SHEEP C4.14,C4.15,C4.16 <br /> —16— <br /> i <br /> TEMPORARILY RELOC EX CONIC <br /> BLOCKS AS NEEDED AND REEL <br /> FOLLOWING OUTFALL CONSTRUCTION. <br /> ————— ————— /—�� oi- A. <br /> -15—=--_----- <br /> EX BERM - <br /> --- 2 WGH-FLOW BYPASS & LIFT STATION DETAIL PLAN <br /> CB TYPE 2 72"DIA W 48" —---—————— <br /> / � .1 C4 <br /> --- -------16--- C4 .9 <br /> SQUARE ACCESS HATCH �5 1 7—————— <br /> P P 1,7..-19 17.28 ——- <br /> P IM6:84 6.82(36"E,W) ^ Z- <br /> 1 OUTFALL M DETAIL PLAN CALL 48HOURS <br /> BEFORE YOU DIG <br /> C4.1 _j DIAL811 oo <br /> �� 10' 0 1 0' 20' <br /> VERT DATUM: NAVD 88 <br /> CONV TO MLLW = NAVD88+2.03 <br /> HORZ DATUM: NAD 83/91 W <br /> <,< SCALE: 1"=10' <br /> (D <br /> a< W <br /> PORT OF EVERETT <br /> !D PROJECT ENGINEER: SCALE: <br /> DWG. N0C4.V <br /> � p, N. WATSON 1" = 10' <br /> Port o,fA oP'�g'9� <br /> ® 09/17/2021 NW UPDATED ELEVATIONS Q,`� - ,so DESIGNED BY: DATE: N 0 R T 0 N TERMINAL DEVELOPMENT <br /> c 2 m �Z J. BECKER 05/07/2021 po'' CIP N0, V <br /> EVERETT 1q)ff ® 07/23/2021 NW ADDENDUM 3 DRAWN BY: CHECKED BY: « M T C A 3 R D INTERIM ACTION 1-8-900-05 <br /> 1601 5th Avenue,Suite 1300 0 06 21/2021 NW ISSUED FOR BID s�o>.a K. EDWARDS, D. YU N. WATSON PROJECT <br /> N P 0. BOX 538 Seattle,Washington98101 / e�rs �fi STORMWATER DETAIL PLAN <br /> NO. MT-NT-2021-022 <br /> EVERETT, WA 98206 ® 05/07/2021 NW FOR CITY REVIEWYUFAL�TCJ h APPROVED BY: <br /> N (425) 259-31 64 (206)CT NO.1 Fax(206)382-OB00 LL <br /> " OUTFALL M SHEET NO. 53 OF 1 50 <br /> PROJECT NO.1600120 N0. DATE BY REVISION N0. DATE BY REVISION <br />
The URL can be used to link to this page
Your browser does not support the video tag.