My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT Plans 2025-09-26
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
Plans
>
2600 FEDERAL AVE 2021 PORT OF EVERETT Plans 2025-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2025 2:02:42 PM
Creation date
9/26/2025 1:56:04 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Permit
PW2112-023
Year
2021
Notes
SITEWORK FEDERAL AVE AND NORTON TERMINAL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
z 1 EX CONIC VAULT 3/4" DIA SMOOTH ALUMINUM BARS GENERAL NOTES <br /> APPROX 7'Wx19'Lx10'D WITH ENDS WELDED TO BAR FRAME <br /> 24' w RIM=IS.00t 24. 1. ALL WORK BELOW ORDINARY HIGH WATER (OHW) LINE <br /> PORT GARDNER BAY a SHALL OCCUR IN THE 'DRY'. <br /> 20' EAST WATERWAY 3 EX DREDGE SAND 20 <br /> c� 2 EX RIPRAP EX PVMT 2. EXCAVATION AND PLACEMENT OF ROCK BELOW HTL WILL <br /> = OCCUR IN THE 'DRY' WITHIN A SINGLE TIDE CYCLE. <br /> 16" } 16' WORK THAT CANNOT BE COMPLETED IN A SINGLE TIDE <br /> CYCLE SHALL TEMPORARILY COVER AND STABILIZE <br /> z D EXPOSED SOILS WITH GRAVEL, GEOTEXTILE OR OTHER <br /> 12' = 11.19' 12' z <br /> 0 <br /> STAVE PIPE APPROVED METHODS PRIOR TO TIDAL SUBMERSION. <br /> F g' OHW ELEV = 7.9 ' _,, g• - <br /> = o° 4" MAX <br /> w w BAR SPACING CONSTRUCTION KEY NOTES <br /> a 1 EX 12" PVC ----- IE = 6.10' a S PLAN VIEW <br /> 0. OUTFALL W/END WOOD SIAVF TO PVC, <br /> CAP, IE=0.10' 0' 495SR; <br /> REMOVE.FTRANSITION, UNKNOWN EX CDFRIPRAP AND CONCRETE RUBBLE THAT Iii_4' 19 - 90' -4• OUTFACE REPLACEMENT SHALL BEAN APPROVED OFF-SITE LOCATION AND2"x5" ALUMINUM ANCHOR STRIPS LACED WITH NEW RIPRAP <br /> -80' -60' -40' -20' 0' 20' 40' WELDED TO 3/4" DIA BAR-FRAME <br /> (4 PLACES) SPACED UNIFORMLY, FASTEN O REPLACE EXISTING 12" PVC OUTFACE <br /> DISTANCE(FT) 3/4" DIA WITH 1/2" ALUMINUM BOLTS AND NUTS WITH NEW 36" HDPE. <br /> A EXISTING CONDITION & DEMO PROFILE - OUTFALL M ALUMINUM <br /> BAR FRAME 1' O INSTALL 48" HDPE PIPE TO ENCASE 36" HDPE OUTFACE <br /> I <br /> C4.9 MIN PLAN <br /> FOR PIPE. FILL ANNULAR SPACE WITH NON-SHRINK GROUT. <br /> C4.10 1 O' 0 10' 20' PIPE S <br /> COVER <br /> I WA WA END VIEW O FLTER FABRIC TPRIOREXPOSED <br /> TO SQUUARRYB SPADLL PLACEMENT. <br /> 5'5' 15' z Z O RESTORE RIPRAP TO ORIGINAL ELEVATION, DEPTH, AND <br /> SCALE: 1"=10' w 3 3 O 6 LIMITS FOLLOWING OUTFALL REPLACEMENT WITH NEW <br /> TRENCH CUTOFF WALL RIPRAP. <br /> 24' - ¢ C4.10 C4.14 24• E <br /> PORT GARDNER BAY OUTFACE DEBRIS BARRIER 3 MATCH EX PVMT p O PIPE TO UPLAND STORM DRAIN SYSTEM. <br /> 20' EAST WATERWAY C4.10 C4.10 - RESTORE SURFACE FLUSH 20' <br /> x 6 WITH S UH _ O TEMPORARILY RELOCATE EXISTING ROCKERY TO <br /> } - WITH 1-FOOT MIN DEPTH n ACCOMMODATE OUTFALL INSTALLATION. <br /> 16' +O�C <br /> ¢ STREAMBED COBBLES 16' <br /> RIPR P ENERGY DISSIPATOR Z 9PLUG & ABANDON EXISTING 10" DI OUTFALL AND <br /> C0 '< BEVELED PIPE END SECTION REPLACE WITH 18" HDPE OUTFALL. <br /> a 12' HAT ELEV = 11.19' 3 12' PIPE COUPLING <br /> �.. ..-.. .._ o <br /> z z <br /> _0 OHW ELEV=7.97' IE = 6.56'- z <br /> 0 8' 0.39 g' 0 10 INSTALL 30" HDPE PIPE TO ENCASE 18" HDPE OUTFACE <br /> PIPE. FILL ANNULAR SPACE WITH NON-SHRINK GROUT. <br /> w SIDE VIEW <br /> w 4' TOE ELEV=-2.03', EX GRADE I8't 4' w COVER EXCAVATED, EXPOSED SUBGRADE SOILS WITH <br /> E 11 <br /> MATCH EX GRAD <br /> FOR ROC FABRIC PRIOR TO GRAVEL BACKFILL PLACEMENT <br /> 0 14 3' MIN DE RIPRAP 4 HDPE CASING PIPE 0 e <br /> �� D DETAIL O U T F A L L DEBRIS BARRIER 12 RESTORE EXISTING ROCKERY TO ORIGINAL ELEVATION AND <br /> a KEY FILTER FABRIC INTO 1' M N DEPTH QUARRY SPALLS CASING SPACER/SKID a LIMITS FOLLOWING OUTFALL INSTALLATION. <br /> RIPRAP AT TOE & TOP C4.1O C4.1O SCALE NITS <br /> -6' -6' 13 PIPE TO UPLAND STORM DRAIN SYSTEM. UPLAND STORM <br /> -80' -60' -40' -20' 0" 20' 40' WATER RUNOFF IS TREATED BY FILTER CARTRIDGE(S) FOR <br /> WATER QUALITY TREATMENT BEFORE DISCHARGE TO <br /> DISTANCE(FT) OUTFALL A. <br /> CONFORM TO WSDOT SPEC <br /> B DEVELOPED CONDITION & DEMO PROFILE - OUTFALL M 3' MIN DEPTH CLASS B RIPRAP, PER 14 BIPRAP ROCK FORE EROSION AND SCOUR PROTECTION.4 CLASS <br /> O O 4.9 C4.10 10' 0 10' 20' WSDOT STANDARD SPECIFICATIONS OVER <br /> C V QUARRY SPALLS BENEATH RIPRAP <br /> 5' 15' SEE PLAN SHEETS FOR <br /> SCALE: 1"=10' OUTFALL PIPE SIZE <br /> C C C <br /> p I , <br /> OUTFALL DEBRIS BARRIER ? <br /> C4.10 C4.10 J 8 12 EX ROCKERY TOP <br /> 24' - ELEV = 11.97'f 24' O O O O O ENERGY DISSIPATOR SCHEDULE <br /> PORT GARDNER BAY <br /> 20' EAST WATERWAY 3 Z 20' ( // <br /> �C4 <br /> TRENCH CUTOFF WALL OUTFALL SIZE A B C16 RIPRAP ENERGY DISSIPATOR 11 C4.10 C4.14 16C4.10 - - - O O O O O O 18" 1.5' 10.5' 1.5' 8'± <br /> 12' HAT ELEV = 11.19' z 12' <br /> �••-..-••- GRADE <br /> o c j:d 36 3' 18' 3' 10't <br /> > z <br /> o w <br /> 8' OHW ELEV = 7.17 ' <br /> - , g z 0 <br /> z ._.._.._.._.. .. .._.. Q <br /> F = (OHW ELEV VARIES 0.57 <br /> 4' ALONG SHORELINE) MATCH EX GRADE IE = 3.97'- 13 4' w O O O <br /> 1 <br /> 0' HDPE CASING PIPE 9 0' pp HOURS <br /> -4' Y FILTER FABRI CASING SPACER/ -4' <br /> SKID <br /> _] <br /> INTO RIPRAP AT TOE <br /> 8, 1 MIN DEPTH QUARRY SPALLS 8, g C D CALL 48 <br /> -20' 0' 20' 5 40' 60, 80' 100' AS NEEDED TO BEFORE YOU DIG <br /> 14 3' MIN DEPTH RIPRAP MATCH EX GRADE 11 DIAL 811 oo <br /> < DISTANCE(FT) <br /> T u C DEVELOPED CONDITION & DEMO PROFILE - OUTFALL A E DETAIL - RIPRAP ENERGY DISSIPATOR VERT DATUM: NAVD 88 <br /> ~ C4.2 C4.10 10' 0 0' 20' C4.2, C4.9, C4.10 C4.10 SCALE: NITS CONV TO MLLW = NAVD88+2.03 <br /> n HORZ DATUM: NAD 83/91 <br /> 5' 15' W <br /> CL< SCALE: 1"=10' <br /> m <br /> !D PROJECT ENGINEER: SCALE: DWG. NO <br /> 0� A. !P9 N. WATSON 1" = 30' PORT OF EVERETT C4.10 <br /> aP..tee, T � <br /> "i tib N.J> DESIGNED BY: DATE: <br /> Port of1q ="yR' ��� E NECKER DATE: 2021 NORTON TERMINAL DEVELOPMENT GIP NO, H <br /> EVERETT DRAWN BY: CHECKED BY 1-8-900-05 <br /> e 07/D9/202, NW ADDENDUM , & MTCA 3RD INTERIM ACTION U <br /> 1601 5th Avenue,Suite 1300 0 06 21/2021 NW ISSUED FOR BID 87014 K. EDWARDS, D. YU N. WATSON PROJECT <br /> NP 0. BOX 538 Seattle,Washington98101 / eecrs �fi STORMWATER PROFILES <br /> N EVERETT, WA 98206 Seat)382ashin Fax 9810 382-0500 ® 05/07/2021 NW FOR CITY REVIEW YUFAL$1Tc� b~ APPROVED BY: N0. MT-NT-2021-022 <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE I BY REVISION NO. DATE BY REVISION SHEET NO. 54 OF 150 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.