Laserfiche WebLink
SEWER STRUCTURE SCHEDULE <br /> NORTHING & EASTING COORDINATES ARE TAKEN <br /> AT THE CENTER OF EACH STRUCTURE <br /> ID NORTHING EASTING <br /> SSFM CO V1 361527.24 1301487.70 <br /> SSFM CO V2 361622.55 1301486.52 <br /> SSFM CO V3 361722.49 1301490.00 <br /> SSFM CO V4 361822.43 1301493.48 <br /> SSFM CO V5 361922.37 1301496.96 <br /> SSFM CO V6 362022.31 1301500.44 <br /> SSFM CO V7 362122.25 1301503.92 <br /> SSFM CO V8 362222.19 1301507.40 <br /> SSFM CO V9 362322.13 1301510.88 <br /> SSFM CO V10 362422.07 1301514.36 <br /> SSFM CO V11 362522.00 1301517.84 <br /> SSFM CO V12 362622.01 1301521.32 <br /> SSFM CO V13 362721.95 1301524.80 <br /> SSFM CO V14 362821.89 1301528.28 <br /> SSFM CO V15 362870.47 1301458.98 <br /> SSFM CO V16 362921.83 1301531.76 <br /> SSM CO V17 363021.77 1301535.23 <br /> SSFM CO V18 363121.71 1301538.80 <br /> SSFM CV-GV V19 363186.65 1301547.82 <br /> SSFM CV-GV V20 363221.65 1301542.19 <br /> SSCO1 1301555.39 363202.25 <br /> SSCO2 1301608.14 363186.57 <br /> SSCO3 1301530.27 361431.48 <br /> SSLS1 1301554.92 363186.31 <br /> (D <br /> IF SHEET IS LESS THAN 22x34 W <br /> a m REDUCE SCALE ACCORDINGLY > <br /> !° PROJECT ENGINEER: SCALE: <br /> �� PORT OF EVERETT °W N C5.23 <br /> � p. N. WATSON AS SHOWN <br /> A,-s ��Q/N Tip DESIGNED BY: DATE: <br /> Port of =��,t aye J. BECKER 06/21/2021 NORTON TERMINAL DEVELOPMENT CIP NO. H <br /> p0'' <br /> EVERETT DRAWN BY CHECKED BY « MTCA 3RD INTERIM ACTION 1-8-900-05 V <br /> v` K. EDWARDS, D. YU N. WATSON PROJECT <br /> N - P.O. BOX 53a 16015th Avenue,Suite 1300 ' �° SEWER STRUCTURE SCHEDULE <br /> NO MT-NT-2021-02.2 <br /> Seattle,Washington 98101 ® 06/21/2021 NW NEW SHEET ♦ h~ APPROVED BY: <br /> EVERETT, WA 98206 <br /> N (206)382-0600 Fax(206)382-05007p�`L <br /> (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION SHEET NO. 80 OF 149 LL <br />