Laserfiche WebLink
Compass Health Broadway Phase 2 <br /> Case A: H=13.5' Cantilever <br /> Depth(ft) <br /> 5 <br /> 10 <br /> 15 <br /> 20 <br /> 25 <br /> Moment E uilibrium <br /> Force Equilibrium <br /> 30 <br /> 0 1 ksf <br /> I <br /> 35 <ShoringSuite> CIVILTECH SOFTWARE USA www.civiltechsoftware.com <br /> Licensed to jmb DBM Contractors, Inc Date: 9/8/2023 <br /> File: 0:\Projects\Jobs\681-23 Compass Health Ph 2\15.1 Bid Estimate\21-9777 Compass Health Broadway Block Phase <br /> Wall Height=13.5 Pile Diameter-2.5 Pile Spacing=8.0 Wall Type: 2. Soldier Pile, Drilled <br /> PILE LENGTH: Min. Embedment=15.84 Min. Pile Length=29.34(in graphics and analysis) <br /> MOMENT IN PILE: Max. Moment=337.90 per Pile Spacing=8.0 at Depth=20.21 <br /> PILE SELECTION: <br /> Request Min. Section Modulus = 122.9 in3/pile=2013.53 cm3/pile, Fy= 50 ksi = 345 MPa, Fb/Fy=0.66 <br /> -> Piles meet Min. Section Requirements: <br /> W10X112 W12X96 HP13X100 HP14X89 W14X82 <br /> W16X77 W18X71 W21X62 W24X62 W27X84 <br /> W30X90 W33X118 W36X135 W40X149 <br /> DRIVING PRESSURES (ACTIVE, WATER, &SURCHARGE): <br /> Z1 P1 Z2 P2 Slope <br /> 0 0 800 24.00 .03 <br /> Surch arge <br /> 0 .1 13.5 0.100 <br /> PASSIVE PRESSURES: <br /> Z1 P1 Z2 P2 Slope <br /> 15.5 .8 800 314.600 .4 <br /> ACTIVE SPACING: <br /> No. Z depth Spacing <br /> 1 0.00 8.00 <br /> 2 13.50 2.50 <br /> PASSIVE SPACING: <br /> No. Z depth Spacing <br /> 1 13.50 5.00 <br /> UNITS: Width,Spacing,Diameter,Length,and Depth -ft; Force - kip; Moment-kip-ft <br /> Friction,Bearing,and Pressure - ksf; Pres. Slope -kip/ft3; Deflection - in <br />