Laserfiche WebLink
Compass Health Broadway Phase 2 <br /> Case B: H=10' Cantilever <br /> Depth(ft) <br /> 0 <br /> ---------------- ------------- <br /> 5 <br /> 10 -------------------•------------------- <br /> 15 <br /> 20 <br /> Moment E uilibrium <br /> Force Equilibrium <br /> 25 0 1 ksf <br /> I I <br /> <ShoringSuite> CIVILTECH SOFTWARE USA www.civiltechsoftware.com <br /> Licensed to jmb DBM Contractors, Inc Date: 9/8/2023 <br /> File: 0:\Projects\Jobs\681-23 Compass Health Ph 2\15.1 Bid Estimate\21-9777 Compass Health Broadway Block Phase <br /> Wall Height=10.0 Pile Diameter=2.0 Pile Spacing=8.0 Wall Type: 2. Soldier Pile, Drilled <br /> PILE LENGTH: Min. Embedment=13.66 Min. Pile Length=23.66 (in graphics and analysis) <br /> MOMENT IN PILE: Max. Moment=170.34 per Pile Spacing=8.0 at Depth=15.88 <br /> PILE SELECTION: <br /> Request Min. Section Modulus = 61.9 in3/pile=1015.05 cm3/pile, Fy=50 ksi = 345 MPa, Fb/Fy=0.66 <br /> -> Piles meet Min. Section Requirements: <br /> W10X60 HP12X53 W12X50 HP13X60 HP14X73 <br /> W 14X43 W 16X40 W 18X40 W 21 X44 W 24X55 c S E �-L.r G''C `tS <br /> W27X84 W30X90 W33X118 W36X135 <br /> DRIVING PRESSURES (ACTIVE, WATER, &SURCHARGE): <br /> Z1 P1 Z2 P2 Slope <br /> 0 0 800 24.00 .03 <br /> Surch arge <br /> 0 .1 10 0.100 <br /> PASSIVE PRESSURES: <br /> Z1 P1 Z2 P2 Slope <br /> 12 .8 800 316.000 .4 <br /> ACTIVE SPACING: <br /> No. Z depth Spacing <br /> 1 0.00 8.00 <br /> 2 10.00 2.00 <br /> PASSIVE SPACING: <br /> No. Z depth Spacing <br /> 1 10.00 4.00 <br /> UNITS: Width,Spacing,Diameter,Length,and Depth -ft; Force- kip; Moment-kip-ft <br /> Friction,Bea ring,and Pressure- ksf; Pres. Slope -kip/ft3; Deflection -in <br />