Laserfiche WebLink
Compass Health Broadway Phase 2 <br /> Case D: H=6' Cantilever <br /> Depth(ft) <br /> 0 ---------------- ------------- <br /> 5 <br /> ---------------------------------------------------------------------------------------------------------------------------- <br /> 10 <br /> Moment E uilibrium <br /> 15 Force Equilibrium <br /> 0 1 ksf <br /> � I <br /> <ShoringSuite> CIVILTECH SOFTWARE USA www.civiltechsoftware.com <br /> Licensed to jmb DBM Contractors, Inc Date: 9/8/2023 <br /> File: 0:\Projects\Jobs\681-23 Compass Health Ph 2\15.1 Bid Estimate\21-9777 Compass Health Broadway Block Phase <br /> Wall Height=6.0 Pile Diameter=2.0 Pile Spacing=8.3 Wall Type: 2. Soldier Pile, Drilled <br /> PILE LENGTH: Min. Embedment=9.62 Min. Pile Length=15.62(in graphics and analysis) <br /> MOMENT IN PILE: Max. Moment=56.62 per Pile Spacing=8.3 at Depth=10.28 <br /> PILE SELECTION: <br /> Request Min. Section Modulus = 20.6 in3/pile=337.37 cm3/pile, Fy= 50 ksi = 345 MPa, Fb/Fy=0.66 <br /> -> Piles meet Min. Section Requirements: <br /> HP8X36 W8X24 HP10X42 W10X22 HP12X53 <br /> W12X19 HP13X60 HP14X73 W14X22 W16X26 05 % iv 12-�3E, <br /> W 18X35 W 21 X44 W 24X55 W 27X84 <br /> DRIVING PRESSURES (ACTIVE, WATER, &SURCHARGE): <br /> Z1 P1 Z2 P2 Slope <br /> 0 0 800 24.00 .03 <br /> ' Surch arge <br /> 0 .1 6 0.100 <br /> PASSIVE PRESSURES: <br /> Z1 P1 Z2 P2 Slope <br /> 8 .8 800 317.600 .4 <br /> ACTIVE SPACING: <br /> No. Z depth Spacing <br /> 1 0.00 8.25 <br /> 2 6.00 2.00 <br /> PASSIVE SPACING: <br /> No. Z depth Spacing <br /> 1 6.00 4.00 <br /> UNITS: Width,Spacing,Diameter,Length,and Depth -ft; Force -kip; Moment-kip-ft <br /> Friction,Bearing,and Pressure-ksf; Pres. Slope -kip/ft3; Deflection - in <br />