Laserfiche WebLink
Compass Health Broadway Phase 2 <br /> Case C: H=8' Cantilever <br /> Depth(ft) ---------------- --------- <br /> 0 <br /> 5 <br /> 10 <br /> 15 <br /> Moment E uilibrium <br /> Force Equilibrium <br /> 20 <br /> 0 1 ksf <br /> I � <br /> <ShoringSuite> CIVILTECH SOFTWARE USA www.civiltechsoftware.com <br /> Licensed to jmb DBM Contractors, Inc Date: 9/8/2023 <br /> File: 0:\Projects\Jobs\681-23 Compass Health Ph 2\15.1 Bid Estimate\21-9777 Compass Health Broadway Block Phase <br /> Wall Height=8.0 Pile Diameter=2.0 Pile Spacing=8.3 Wall Type: 2. Soldier Pile, Drilled <br /> PILE LENGTH: Min. Embedment=11.72 Min. Pile Length=19.72 (in graphics and analysis) <br /> MOMENT IN PILE: Max. Moment=105.82 per Pile Spacing=8.3 at Depth=13.11 <br /> PILE SELECTION: <br /> Request Min. Section Modulus= 38.5 in3/pile=630.58 cm3/pile, Fy= 50 ksi = 345 MPa, Fb/Fy=0.66 <br /> -> Piles meet Min. Section Requirements: <br /> W8X48 HP10X42 W10X39 HP12X53 W12X30 Wj6 X3� <br /> HP13X60 HP14X73 W 14X30 W 16X31 W 18X35 (A S E <br /> W 21 X44 W 24X55 W 27X84 W 30X90 <br /> DRIVING PRESSURES (ACTIVE, WATER, & SURCHARGE): <br /> Z1 P1 72 P2 Slope <br /> 0 0 800 24.00 .03 <br /> Surch arge <br /> 0 .1 8 0.100 <br /> PASSIVE PRESSURES: <br /> Z1 P1 Z2 P2 Slope <br /> 10 .8 800 316.800 .4 <br /> ACTIVE SPACING: <br /> No. Z depth Spacing <br /> 1 0.00 8.25 <br /> 2 8.00 2.00 <br /> PASSIVE SPACING: <br /> No. Z depth Spacing <br /> 1 8.00 4.00 <br /> UNITS: Width,Spacing,Diameter,Length,and Depth -ft; Force- kip; Moment-kip-ft <br /> Friction,Bearing,and Pressure - ksf; Pres. Slope -kip/ft3; Deflection -in <br />