Laserfiche WebLink
FLAG NOTES Q: <br /> NA <br /> 1. 48"X 48"SPACE RESERVED FOR DAB EQUIPMENT.LOW VOLTAGE <br /> DESIGN-BUILD CONTRACTOR TO COORDINATE EXACT LOCATION WITH <br /> ARCHITECT AND AHJ IT DEPARTMENT FOR OPTIMAL INTERFACE WITH <br /> BROADCAST ANTENNAS. <br /> an <br /> 2. SOLAR ZONE FOR FUTURE PHOTOVOLTAIC(PV)SYSTEM.SEE E003 FOR L I <br /> CONDUIT REQUIREMENTS,E501 FOR FUTURE EQUIPMENT SPACE. <br /> 3. FIELD VERIFY EXACT RECEPTACLE LOCATIONS WITH MECHANICAL <br /> CONTRACTOR;INSTALL RECEPTACLES WITHIN 25 FT OF ALL MECHANICAL <br /> EQUIPMENT. <br /> 4. INDOOR UNIT TO BE FED FROM THE OUTDOOR UNIT.PROVIDE <br /> IRA- <br /> DISCONNECTS AT BOTH LOCATIONS AND CONNECT PER CODE AND <br /> MANUFACTURER'S INSTRUCTIONS.GROUND PER CODE AND <br /> MANUFACTURER'S INSTRUCTIONS.FIELD VERIFY EXACT CONNECTION <br /> REQUIREMENTS FOR FINAL UNIT SELECTED FOR PROJECT WITH 38 NORTHINESF DAVE,SUITE 300 <br /> MECHANICAL CONTRACTOR;ADVISE ENGINEER OF CONFLICTS. PORTLAND,OR 97209 <br /> 503.245.7100 <br /> 5. INDOOR UNIT TO BE FED FROM THE OUTDOOR UNIT;SEE DRAWING <br /> E2.02M.PROVIDE DISCONNECTS AT BOTH LOCATIONS AND CONNECT PER 1505 5TH AVE,SUITE 300 <br /> CODE AND MANUFACTURER'S INSTRUCTIONS.GROUND PER CODE AND SEATEE,WA 98101 <br /> MANUFACTURER'S INSTRUCTIONS.FIELD VERIFY EXACT CONNECTION 206.5]6.1600 <br /> REQUIREMENTS FOR FINAL UNIT SELECTED FOR PROJECT WITH 1014 HOWARD STREET <br /> MECHANICAL CONTRACTOR;ADVISE ENGINEER OF CONFLICTS snN FRAxClsco,a 94103 <br /> 415.252.]063 <br /> AD AN.M AREA.A@71...ING <br /> SIDER+BYERS ASSOCIATES,INC. <br /> MECHANICAL AND Eu:Cmlru <br /> 7 w\ <br /> 192 NICKERSON,SURE 300 <br /> SEATTLE,WA98109 <br /> 206.2852966 hom <br /> C M <br /> PJ SS <br /> Huth <br /> 2 1-XR FIRE PFSSTANCE 2 LUTUSRATED PARAPET <br /> —— ——— ——— ——— ———— — — — — — Gmw, — p <br /> L4P5 L4P-3 development partners <br /> I I I I <br /> I I I I 3 <br /> —� — TYPIC —— ———-------- ---- — — E -1 B <br /> I 0 0 4H-11®702 0 O L4H-E10 <br /> ER-1H (5702 U13 <br /> 0 4H-2 ZFIlL4H-3 <br /> I L4P-5 -OUZ- -- — — '1 --_UPI_ eL'S_ -- CU-6 L4�3l <br /> L4H-2 L4H GFI,WP L4H•5 L4H-8 <br /> CU-1 CU-7 <br /> I L4H-1 OL4H-3 <br /> 702 <br /> 4 M MR ® FkW CU-13 <br /> OL4E-18,20 CU-8 T44P� <br /> IWP L4H-S <br /> __—_—_ _—_—_—_— _ _ _ _ _ ®IL4H ____ CU-12 �J. W <br /> - I CU•9 CU-10 MAINTENANCE Aces � <br /> L4H-7 L4H-8 U-11 ROOF HATCH Q <br /> OL4 .I, = o <br /> a m <br /> y p L2K-12,14 CU-247 <br /> I pE llll L4P-3 OL4H-03 <br /> 0 P-5 GFI,WP 0 , L4P-3 O F_ <br /> — —————— ———————— — W dh— — — ——— — — I P J W <br /> m W <br /> Lu <br /> Q r <br /> J <br /> W_ <br /> 0 Q <br /> Q C/3 <br /> O CO a <br /> m rm U <br /> NO ROOF OPENINGS WITHIN 10'-0' <br /> OF INTERIOR PARAPET FACE <br /> FEW DATE REAEON FOR ISSUE <br /> 001 w <br /> I wrl L4P-1 0o 100 10 0 LAP-1 — E z �a9.Os zz PERMIT REVISIONS <br /> 3 09.2022 GMPADOENOUM <br /> 4 10.20.22 ASI-01 <br /> y _ <br /> SOU APPROVAL STAMP <br /> I <br /> I I <br /> L4P-1 L4P-1 00 L4P-1 <br /> -- -- — - 1 — - -_ —J-- — — —�— --- '� L —L-- -- — — — — GF1,M� <br /> ———� ROOF PLAN-POWER PLAN <br /> I I I I I I I I I <br /> 2 ASI-01 SET <br /> f A R <br /> -L q <br /> ROOF PLAN - POWER PLAN 10 <br /> �® DATE PIER NUMBER <br /> ° .zo.zozz 21016 <br /> N SCALE:1/8'-1"-O SHEETNUMBER <br /> KEY <br /> 0 4 8 16 32 <br />