Laserfiche WebLink
TRUCK <br /> AFFIC <br /> IN FROMRNORH —TRUCK TRAFFIC— v NORTH EBEY R� KEY NOTES <br /> OUT TO NORTH ��//// <br /> TRUCK TRAFFIC O1 THE MAJORITY OF THE SITE WAS BACKFILLED <br /> TO AND FROM <br /> WITH APPROXIMATELY 1 TO 5 FEET OF SAND <br /> Q NORTON AVENUE PRIEST Q q 1-5 BOTH DIRECTIONS <br /> S INTERIM <br /> LL IN FALL CLEANUP. <br /> DURING THE RAC <br /> INTERIM ACTION CLEANUP. THE CONTRACTOR <br /> i POINT �B09T NORTH EBEY SHALL BE AWARE THAT THERE IS THE <br /> / g POTENTIAL THAT SOME CONSTRUCTION xi SMITH ISLAND G� S(O�CN EQUIPMENT OR TRUCKS MAY EXPERIENCE <br /> POOR TRACTION OR GET STUCK DRIVING OVER <br /> _ _ o THE EXISTING SAND IN PORTIONS OF THE <br /> /(DFX <br /> > c NORTH SPENCER <br /> SITE. SEE SPECIFICATIONS FOR ADDITIONAL <br /> HAUL ROAD l 1 NORTH �\ _ = BRINGER FARM MID INFORMATION. <br /> 0 GATE <br /> SITE EBEY O SEPARATE PRELOAD CONTRACT WILL LEAVE A <br /> / n GRAVEL HAUL ROAD FROM FEDERAL AVENUE <br /> JETTY/ Q m TO THE PRELOAD THAT WILL BE AVAILABLE <br /> J ISLAND FOR USE BY THE CONTRACTOR. AN EXISTING <br /> 0 GRAVEL ROAD IS ALSO AVAILABLE AT THE <br /> PORT GARDNER I LLJ - NORTH END. <br /> EAST WATERWAY I x� o POINT <br /> `�y O3 UNLESS OTHERWISE SHOWN OR APPROVED BY <br /> � Fti MID THE ENGINEER, THE CONTRACTOR SHALL <br /> C� \F Sao PENCE LOCATE ALL STOCKPILES AND THEIR <br /> CONSTRUCTION TRAILER WITHIN THE WORK <br /> LiJ C = MAULSBY MAULSBY sy AREA LIMITS SHOWN. SEE SHEET C1.1 FOR <br /> MUD SWAMP FURTHER REQUIREMENTS. <br /> Q <br /> 0 FLAT n <br /> m <br /> EX III o m I OTTER ISLAND 4 CONTRACTOR MAY SHARE CONSTRUCTION <br /> 1 I W icl�BARGE/ I Z JETTY z BOAT T ACCESS POINTS WITH OTHER CONTRACTORS. <br /> DOCK 1 RAMP z UNION SEE SHEET G5.1 AND SPECIFICATIONS FOR <br /> 1 �� ISLAND <br /> 1 1 Q BERM SLOUGH FURTHER DETAILS. <br /> ©PRELOAD AREA <br /> 1 z <br /> 1 STREET CONTRACTOR SHALL PROVIDE TRAFFIC <br /> E OF <br /> i E I I MARINA w SOUT EBEY TRAFFICCONTRO <br /> AND MINTIN ONDURINGAALLAWORKEWI HIIN THE <br /> MARINA FEDERAL AVENUE ROW. THIS WILL BE <br /> EVERETT REQUIRED TO MAINTAIN ACCESS TO EXISTING <br /> 1 3 SLOUGH SHIP REPARTENANTS ONDUNLAPRANDAL AMEAINETERMNA(EVERETT <br /> PROJECT SITE PROJECT <br /> NAVAL SOUTH SPE CER <br /> L SITE <br /> `I T E STATION 19TH ST. TRAFFIC) AND OTHER CONSTRUCTION <br /> J EVERETT STEAMBOAT PROJECTS AS SHOWN. <br /> I <br /> m 'a SLOUGH © CONTRACTOR SHALL PROVIDE ACCESS TO <br /> O2 HAUL o PORT SURVEYORS TO THE SETTLEMENT <br /> 0 <br /> ROAD D o MONITORING POINTS ON THE PRELOAD <br /> z m J FOOTPRINT BETWEEN SEPTEMBER 2021 AND <br /> < DEADMAN MARCH 2O22. <br /> SLOUGH <br /> EVERETT O7 CONTRACTOR CAN UTILIZE EXISTING NORTH <br /> CONSTRUCTION ACCESS SHOWN ON SHEET <br /> w—�w Pc, P3 MA LSB C1.1 FOR THE MAJORITY OF THE PROJECT <br /> _ FEDERAL 1 HEWITT HWY 2 UNTIL DIRECTED BY ENGINEER TO UTILIZE THE <br /> NAVIGATION o O FEDERAL NEW NORTH GATE ALIGNMENT. <br /> CHANNEL PACIFIC <br /> �• ® NO CONTRACTOR TRAFFIC QUEUING IS TRUCK TRAFFIC �� > I DEADWATER ALLOWED ON EITHER TERMINAL AVENUE OR <br /> OUT TO NORTH J�P��� < SLOUGH FEDERAL AVENUE. <br /> EX WAREHOUSE TRUCK TRAFFIC �� h <br /> I TRUCK TRAFFIC <br /> SOUTH FROM -5 TO 1-5 <br /> GATE <br /> SOUTHBOUND NORTHBOUND <br /> _ VERETT VENUE <br /> q)Q(:D FEDERAL AVENUE Q�O 41ST E JELL <br /> TRUCK TRAFFIC IN FROM W TRUCK TRAFFIC I <br /> LJ OUT TO SOUTH Q <br /> NORTH AND SOUTH z PIGEON <br /> 3 <br /> Q � MUKILTEO BLVD. <br /> � 11 TRUCK TRAFFIC <br /> MAIN MARINE w F o FROM -5 <br /> TERMINAL TRAFFIC CRE�K ZE o No. 1 TRUCK TRAFFIC NORTHBOUND <br /> TERMINAL AVENUE® oo No 2 0o TO -5 <br /> o SOUTHBOUND <br /> City of Everett <br /> EVERETT Reviewed for Permit 10/26/2021 <br /> SITE ACCESS PLAN TRUCK HAUL ROUTES <br /> N SCALE: 1 = 200' N SCALE: 1 = 2000' IF SHEET IS LESS THAN 22x34 LJ.I <br /> REDUCE SCALE ACCORDINGLY <br /> PROJECT ENGINEER: SCALE: PORT OF EVERETT W <br /> P� DWG. N0 G4.1 w <br /> p. N. WATSON AS SHOWN <br /> DESIGNED BY: DATE: <br /> Port Of J. BECKER 06/21/2021 NORTON TERMINAL DEVELOPMENT III NO. <br /> EVERETT1Tff DRAWN BY CHECKED BY & MTCA 3RD INTERIM ACTION 1-8-900-OS V <br /> 16015th Avenue,Suite 1300 s�oia ov K. EDWARDS, D. YU N. WATSON PROJECT <br /> P.O. BOX 538 Seattle,Washington 98101 �� e�1 � SITE ACCESS AND STOCKPILE PLAN No. MT-NT-2o21-02.2 <br /> EVERETT, WA 98206 ® 06/21/2021 NW NEW SHEET �9laNd1 � 10 APPROVED BY: O <br /> (425) 259-3164 (206)382-0600 Fax <br /> PROJECT NO.1600120 NO. DATE BY REVISION N0. DATE BY REVISION SHEET NO. 09 OF 149 LL <br />