My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 Plans 2025-09-29 (2)
>
Address Records
>
FEDERAL AVE
>
2600
>
Plans
>
2600 FEDERAL AVE 2021 Plans 2025-09-29 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:10:00 AM
Creation date
9/29/2025 11:03:21 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Permit
PW2105-051
Year
2021
Notes
SITE WORK FOR FEDERAL AVE IMPROVEMENTS RELATED TO NORTON TER
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK <br /> AFFIC <br /> IN FROMRNORH —TRUCK TRAFFIC— v NORTH EBEY R� KEY NOTES <br /> OUT TO NORTH ��//// <br /> TRUCK TRAFFIC O1 THE MAJORITY OF THE SITE WAS BACKFILLED <br /> TO AND FROM <br /> WITH APPROXIMATELY 1 TO 5 FEET OF SAND <br /> Q NORTON AVENUE PRIEST Q q 1-5 BOTH DIRECTIONS <br /> S INTERIM <br /> LL IN FALL CLEANUP. <br /> DURING THE RAC <br /> INTERIM ACTION CLEANUP. THE CONTRACTOR <br /> i POINT �B09T NORTH EBEY SHALL BE AWARE THAT THERE IS THE <br /> / g POTENTIAL THAT SOME CONSTRUCTION xi SMITH ISLAND G� S(O�CN EQUIPMENT OR TRUCKS MAY EXPERIENCE <br /> POOR TRACTION OR GET STUCK DRIVING OVER <br /> _ _ o THE EXISTING SAND IN PORTIONS OF THE <br /> /(DFX <br /> > c NORTH SPENCER <br /> SITE. SEE SPECIFICATIONS FOR ADDITIONAL <br /> HAUL ROAD l 1 NORTH �\ _ = BRINGER FARM MID INFORMATION. <br /> 0 GATE <br /> SITE EBEY O SEPARATE PRELOAD CONTRACT WILL LEAVE A <br /> / n GRAVEL HAUL ROAD FROM FEDERAL AVENUE <br /> JETTY/ Q m TO THE PRELOAD THAT WILL BE AVAILABLE <br /> J ISLAND FOR USE BY THE CONTRACTOR. AN EXISTING <br /> 0 GRAVEL ROAD IS ALSO AVAILABLE AT THE <br /> PORT GARDNER I LLJ - NORTH END. <br /> EAST WATERWAY I x� o POINT <br /> `�y O3 UNLESS OTHERWISE SHOWN OR APPROVED BY <br /> � Fti MID THE ENGINEER, THE CONTRACTOR SHALL <br /> C� \F Sao PENCE LOCATE ALL STOCKPILES AND THEIR <br /> CONSTRUCTION TRAILER WITHIN THE WORK <br /> LiJ C = MAULSBY MAULSBY sy AREA LIMITS SHOWN. SEE SHEET C1.1 FOR <br /> MUD SWAMP FURTHER REQUIREMENTS. <br /> Q <br /> 0 FLAT n <br /> m <br /> EX III o m I OTTER ISLAND 4 CONTRACTOR MAY SHARE CONSTRUCTION <br /> 1 I W icl�BARGE/ I Z JETTY z BOAT T ACCESS POINTS WITH OTHER CONTRACTORS. <br /> DOCK 1 RAMP z UNION SEE SHEET G5.1 AND SPECIFICATIONS FOR <br /> 1 �� ISLAND <br /> 1 1 Q BERM SLOUGH FURTHER DETAILS. <br /> ©PRELOAD AREA <br /> 1 z <br /> 1 STREET CONTRACTOR SHALL PROVIDE TRAFFIC <br /> E OF <br /> i E I I MARINA w SOUT EBEY TRAFFICCONTRO <br /> AND MINTIN ONDURINGAALLAWORKEWI HIIN THE <br /> MARINA FEDERAL AVENUE ROW. THIS WILL BE <br /> EVERETT REQUIRED TO MAINTAIN ACCESS TO EXISTING <br /> 1 3 SLOUGH SHIP REPARTENANTS ONDUNLAPRANDAL AMEAINETERMNA(EVERETT <br /> PROJECT SITE PROJECT <br /> NAVAL SOUTH SPE CER <br /> L SITE <br /> `I T E STATION 19TH ST. TRAFFIC) AND OTHER CONSTRUCTION <br /> J EVERETT STEAMBOAT PROJECTS AS SHOWN. <br /> I <br /> m 'a SLOUGH © CONTRACTOR SHALL PROVIDE ACCESS TO <br /> O2 HAUL o PORT SURVEYORS TO THE SETTLEMENT <br /> 0 <br /> ROAD D o MONITORING POINTS ON THE PRELOAD <br /> z m J FOOTPRINT BETWEEN SEPTEMBER 2021 AND <br /> < DEADMAN MARCH 2O22. <br /> SLOUGH <br /> EVERETT O7 CONTRACTOR CAN UTILIZE EXISTING NORTH <br /> CONSTRUCTION ACCESS SHOWN ON SHEET <br /> w—�w Pc, P3 MA LSB C1.1 FOR THE MAJORITY OF THE PROJECT <br /> _ FEDERAL 1 HEWITT HWY 2 UNTIL DIRECTED BY ENGINEER TO UTILIZE THE <br /> NAVIGATION o O FEDERAL NEW NORTH GATE ALIGNMENT. <br /> CHANNEL PACIFIC <br /> �• ® NO CONTRACTOR TRAFFIC QUEUING IS TRUCK TRAFFIC �� > I DEADWATER ALLOWED ON EITHER TERMINAL AVENUE OR <br /> OUT TO NORTH J�P��� < SLOUGH FEDERAL AVENUE. <br /> EX WAREHOUSE TRUCK TRAFFIC �� h <br /> I TRUCK TRAFFIC <br /> SOUTH FROM -5 TO 1-5 <br /> GATE <br /> SOUTHBOUND NORTHBOUND <br /> _ VERETT VENUE <br /> q)Q(:D FEDERAL AVENUE Q�O 41ST E JELL <br /> TRUCK TRAFFIC IN FROM W TRUCK TRAFFIC I <br /> LJ OUT TO SOUTH Q <br /> NORTH AND SOUTH z PIGEON <br /> 3 <br /> Q � MUKILTEO BLVD. <br /> � 11 TRUCK TRAFFIC <br /> MAIN MARINE w F o FROM -5 <br /> TERMINAL TRAFFIC CRE�K ZE o No. 1 TRUCK TRAFFIC NORTHBOUND <br /> TERMINAL AVENUE® oo No 2 0o TO -5 <br /> o SOUTHBOUND <br /> City of Everett <br /> EVERETT Reviewed for Permit 10/26/2021 <br /> SITE ACCESS PLAN TRUCK HAUL ROUTES <br /> N SCALE: 1 = 200' N SCALE: 1 = 2000' IF SHEET IS LESS THAN 22x34 LJ.I <br /> REDUCE SCALE ACCORDINGLY <br /> PROJECT ENGINEER: SCALE: PORT OF EVERETT W <br /> P� DWG. N0 G4.1 w <br /> p. N. WATSON AS SHOWN <br /> DESIGNED BY: DATE: <br /> Port Of J. BECKER 06/21/2021 NORTON TERMINAL DEVELOPMENT III NO. <br /> EVERETT1Tff DRAWN BY CHECKED BY & MTCA 3RD INTERIM ACTION 1-8-900-OS V <br /> 16015th Avenue,Suite 1300 s�oia ov K. EDWARDS, D. YU N. WATSON PROJECT <br /> P.O. BOX 538 Seattle,Washington 98101 �� e�1 � SITE ACCESS AND STOCKPILE PLAN No. MT-NT-2o21-02.2 <br /> EVERETT, WA 98206 ® 06/21/2021 NW NEW SHEET �9laNd1 � 10 APPROVED BY: O <br /> (425) 259-3164 (206)382-0600 Fax <br /> PROJECT NO.1600120 NO. DATE BY REVISION N0. DATE BY REVISION SHEET NO. 09 OF 149 LL <br />
The URL can be used to link to this page
Your browser does not support the video tag.