Laserfiche WebLink
DRAWING INDEX DRAWING RELEASE HISTORY GENERAL NOTES Pennitlt: 8190"35 <br /> Site Address: 17 E MARINE VIEW OR BLDG 2 <br /> DRAWING TITLE PAGES TYPE DATE DESCRIPTION Owner: SHADOW DEVELOPMENT <br /> MATERIALS ASTM DESIGNATION Tenant: CADMAN <br /> Apo.Date: 4/23/2019 <br /> Cover Sheet <br /> 1 Approval Drawings 11/01/2018 PERMIT SET-For Building Dept.Approval 3 PLATE WELDED SECTIONS A529,A572,A1011,A1018 GRADE 55 Proposed Use:NEW COMMERCIAL <br /> Codes and Loads z Approval Drawings Rev.1 04/08/2019 PERMIT SET-For Building Dept.Approval COLD FORMED LIGHT GAGE SHAPES A653,Al 011 GRADE 60 Description: SOIL REMEDIAT10N RECYCLING FACILITY BY <br /> BRACE RODS A572,A510 GRADE 50 CADMAN <br /> Notes HOT ROLLED MILL SHAPES A36,A529,A572,A588,A992 GRADE 36 OR 50 <br /> 3 HOT ROLLED ANGLES A529,A572,A588,A992 GRADE 50 Ree—wed B Dater <br /> HOLLOW STRUCTURAL SECTION(HSS) A500 GRADE B &ffice Set _Job Site Set _Fire/Pla'nnin/g Set' <br /> ® Anchor Rod Plan 4 CLADDING A653,A792 GRADE 50 OR GRADE 80 <br /> FVPBUILIDINGS Primary Structural 5-15 HIGH STRENGTH BOLT TIGHTENING REQUIREMENTS <br /> Secondary Structural 16-24 IT IS THE RESPONSIBILITY OF THE ERECTOR TO ENSURE PROPER BOLT TIGHTNESS IN ACCORDANCE WITH APPLICABLE <br /> VARCO P R U D EN Covering 25-34 REGULATIONS.SEE RCSC SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH STRENGTH BOLTS FOR MORE INFORMATION. <br /> SEE ERECTION GUIDE FOR BOLT TIGHTENING INSTRUCTIONS.THE FOLLOWING CRITERIA MAY BE USED TO DETERMINE <br /> Special Drawings THE BOLT TIGHTNESS(I.E.-SNUG TIGHT OR PRE-TENSION)UNLESS REQUIRED OTHERWISE BY LOCAL JURISDICTION OR <br /> CONTRACT. <br /> a division of BlueScope Buildings North America,Inc. Standard Erection Details 15,17,18,24, <br /> 33,24 ALL A490 BOLTS SHALL BE"PRE-TENSIONED".A325 BOLTS IN PRIMARY FRAMING AND BRACING CONNECTIONS MAY BE <br /> Planograph Details 35-38 "SNUG-TIGHT'EXCEPT AS FOLLOWS; <br /> PRE-TENSION A325 BOLTS IF BUILDING SUPPORTS A CRANE GREATER THAN 5 TON CAPACITY. <br /> PRE-TENSION A325 BOLTS IF BUILDING SUPPORTS MACHINERY THAT CREATES VIBRATION,IMPACT,OR STRESS <br /> APPROVAL OF DRAWINGS REVERSALS ON CONNECTIONS. <br /> These drawings are released for review and APPROVA- PRE-TENSION A325 BOLTS IF LOCATED IN HIGH SEISMIC AREAS.FOR IBC BASED CODES;HIGH SEISMIC IS <br /> ONLY.Please review carefully.Approval constitutes the DESIGN CATEGORY D,E OR F.SEE CODES AND LOADS SECTION BELOW FOR DETAILS. <br /> Builder/Contractor's acceptance of the Varco-Pruden PRE-TENSION ANY CONNECTION WITH DESIGNATION A325-SC.SLIP CRITICAL(SC)CONNECTIONS MUST BE FREE <br /> interpretation of the contract Purchase Order.Fabrication is pending the return of one set signed by Builder i Contractor OF PAINT,OIL OR OTHER MATERIALS THAT REDUCE FRICTION AT CONTACT SURFACES.GALVANIZED OR LIGHTLY <br /> RUSTED SURFACES ARE ACCEPTABLE. <br /> ❑Approved as Submitted ❑Approved as Noted IN CANADA,ALL A325 AND A490 BOLTS SHALL BE"PRE-TENSIONED",EXCEPT FOR SECONDARY MEMBERS AND <br /> ❑Disapproved.Please resubmit. FLANGE BRACES. <br /> SECONDARY MEMBERS AND FLANGE BRACE CONNECTIONS ARE ALWAYS"SNUG TIGHT",UNLESS INDICATED OTHERWISE IN <br /> Builder!CDnir. Data _ ERECTION DRAWING DETAILS. <br /> VP Buildings <br /> 7440 Doe Avenue INSPECTION AND TESTING <br /> Visalia,CA 93291 <br /> SPECIAL INSPECTIONS AND TESTING REQUIRED BY AUTHORITY HAVING JURISDICTION(AHJ)DURING CONSTRUCTION AND/OR <br /> STEEL FABRICATION IS THE RESPONSIBILITY OF THE OWNER OR OWNERS AUTHORIZED AGENT.WHEN REQUIRED,THE OWNER <br /> SHALL EMPLOY A QUALITY ASSURANCE AGENCY(QAA)APPROVED BY THE AHJ.THE BUILDER IS RESPONSIBLE TO <br /> COORDINATE BETWEEN THE QAA FIRM AND BBNA FABRICATION FACILITIES.THE TYPE AND EXTENT OF SPECIAL INSPECTIONS <br /> AND NOT WELD TESTING MUST BE SPECIFICALLY STIPULATED IN CONTRACT DOCUMENTS OR BBNA WILL ASSUME SPECIAL <br /> INSPECTIONS ANDIOR NOT TESTING ARE WAIVED AS PERMITTED BY THE BUILDING CODE BASED ON BBNA FACILITIES IAS <br /> AC472 ACCREDITATION. <br /> PLANNING DEPT.INSPECTION REQUIRED <br /> PRIOR TO REQUEST FOR FINAL INSPECTION <br /> _L�_Landstaping _Fencing_Signs <br /> _Environmentally Sensitive Area <br /> _Othe r <br /> Contact: <br /> (425) 257-8731 ext. <br /> (01(ed 4;7'4< Plop an�� <br /> =11� <br /> UNITY <br /> THESE DOCUMENTS HAVB';,:T 33 'I EPT <br /> APPROVED FOS THE ISF CE"F <br /> P SUpp UBLIC WORKS,MECHANICAL,FINE <br /> FLU M�NGI PERMITS, <br /> Additional Additional Permits Are Required " <br /> For This Project To include: <br /> ® Plumbing ❑Sprinkler <br /> © Mechanical ❑FireAlarrn <br /> ® Electrical <br /> 14 <br /> This document has been <br /> y - <br /> electronically signed and <br /> sealed by Derrick Wessel, 2 <br /> PE.The seal and 54 <br /> signature applied are mine <br /> and I approve this /OVAL <br /> doc Nnt <br /> 2019.04.0909:19:04-or00' 04/09/2019 <br /> VP Buildings 3200 Players Club Circle Memphis TN 38125 <br /> I APPROVAL DRAWINM DESIGN REVIEWED I PAGES 1-2 i 2741 JS 4.8.2019 <br /> THE VP ENGINEER'S SEAL APPLIES ONLY TO THE WORK PRODUCT OF VP THIS DRAWING,INCLUDING THE INFORMATION HEREON,REMAINS THE PROPERTY OF VP <br /> AND DE AND PERFORMANCE REQUIREMENTS SPECIFIED BY VP.THE BUILDINGS.IT IS PROVIDED SOLELY FOR ERECTING THE BUILDING DESCRIBED IN THE P�(CSAgss I\\\ COVER SHEET <br /> VP ENGINEER'S SEAL DOES NOT APPLY TO THE PERFORMANCE OR DESIGN APPLICABLE PURCHASE ORDER AND MAY BE REPRODUCED ONLY FOR THAT PURPOSE.IT SHALL C) O <br /> OF ANY OTHER PRODUCT OR COMPONENT FURNISHED BY VP EXCEPT TO NOT BE MODIFIED,REPRODUCED OR USED FOR ANY OTHER PURPOSE WITHOUT PRIOR WRITTEN //���C`a/t n' I euILOER CHG Building Systems,Inc. 'pfo <br /> ANY DESIGN OR PERFORMANCE REQUIREMENTS SPECIFIED BY VP. APPROVAL OF VP BUILDINGS. I]JL]1\ \\\►// CUa1OMER 18-040735-01 <br /> Cadman PATE <br /> THE GENERAL CONTRACTOR AND/OR ERECTOR IS SOLELY RESPONSIBLE FOR ACCURATE GOOD QUALITY ri fiBd ACCREDITED" LOCATIGN Everett,Washington VP BUILDINGS 04/08I2019 <br /> WORKMANSHIP IN ERECTING THIS BUILDING IN ACCORDANCE WITH THIS DRAWING,DETAILS REFERENCED IN THIS AC 472 DRANK(CHECK <br /> PROJECT VARCOPRuOaJ <br /> DRAWING,ALL APPLICABLE VP BUILDINGS ERECTION GUIDES,AND INDUSTRY STANDARDS PERTAINING TO PROPER Cadman Everett Bldg 2 LND <br /> ERECTION,INCLUDING THE CORRECT USE OF TEMPORARY BRACING. BDILDERS Pon PAGE <br /> 28103 vPc vstince:2018.2b 1 <br /> 4/5/2019 10:56:21 FILENAME Cadman ealnonmewesmrx ena��rra,m n,reaal�. <br />