My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/10/01 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/10/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2025 8:57:51 PM
Creation date
10/1/2025 8:54:49 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Call for Bids for the Edgewater Park Renovation Project <br />Council Bill # <br /> <br />Project: Edgewater Park Renovation Project <br />Partner/Supplier: TBD <br /> Location: 3731 Mukilteo Blvd, Everett, WA 98203 <br />Preceding action: Ordinance No. 4089-25 <br />Fund: Fund 354, Program 084 (CIP-3) <br />Agenda dates requested: <br /> <br /> <br />Briefing <br />Proposed action <br />Consent 10/01/25 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br /> <br /> <br />Department(s) involved: <br />Parks and Facilities <br /> <br />Contact person: <br />Bob Leonard <br /> <br />Phone number: <br />425-257-8335 <br /> <br />Email: <br />bleonard@everettwa.gov <br />Initialed by: <br />RML <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The source of funds for the Edgewater Park Renovation Project is Fund 354, Program 084 (CIP-3). <br />Project construction documents have been revised and resubmitted for City of Everett Public <br />Works permit. Authorizing the call for bid at this time will allow the project to be advertised for <br />competitive bids after the permit review is complete. <br />The total project costs will be determined upon the receipt of competitive bids and a funding <br />Ordinance will be created to fund the construction. The Edgewater Park Renovation Project is <br />listed in the CIP-3 financial model. <br />Project summary statement: <br />The City recognizes that many of the park amenities have reached the end of their useful life and <br />require replacement and renovation. Project construction will combine phase 1 and phase 2 into <br />one contract and will include the demolition of the existing tennis court, grading and grubbing of <br />the parcel lot to the west, construction of the new multi-sport court, playground, walking path, <br />site amenities, parking, landscaping, and stormwater facility. <br /> <br /> <br /> <br />Recommendation (exact action requested of Council): <br />Authorize the Call for Bids for the Edgewater Park Renovation Project. <br /> <br /> <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.