My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS <br />McGRANAHAN ARCHITECTS <br />Section 01 19 00, Page 1 <br />ABBREVIATIONS AND DEFINITIONS <br />ABBREVIATIONS AND DEFINITIONS <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. Definitions. <br />B. Abbreviations. <br />1.02 RELATED SECTIONS <br />A. Division 1 — Reference Standards. <br />1.03 DEFINITIONS <br />A. Defmitions: (The following definitions, of terms or words used in this Project Manual, are in addition to those in <br />the Conditions of the Contract). <br />1. The term "product" as used in the Project Manual includes materials, systems, and equipment. <br />2. The term "project manual" is the volume which includes the Bidding Requirements, Conditions of the <br />Contract and the Specifications, Division 01 to 33 inclusive, as applicable, and as listed in the Table of <br />Contents bound herein. <br />3. The term "Architect/Engineer (A/E)" as used herein, shall mean "McGranahan Architects, 2111 Pacific <br />Avenue, Suite 100, Tacoma, Washington 98402." <br />4. The term "Owner" as used herein, shall mean "Mukilteo School District, 8925 Airport Road, Everett, WA <br />98204" <br />5. "As directed" means "as directed by the Architect or Owner." <br />6. Where the words "or approved", "as approved" or "for approval" are used the Architect or the Owner are <br />the sole judge of the quality and suitability of the proposed substitutions. <br />7. The word "furnish" as used herein, shall mean "purchase, pay for, receive and/or store the material, item or <br />equipment at the site ready for installation or erection" unless otherwise specifically noted. <br />8. The word "install" as used herein shall mean "pay for, and do all work necessary for installing and/or <br />erecting and/or connecting the item or material complete in place" unless otherwise specifically noted. <br />9. The word "provide" as used herein shall mean "furnish and install, pay for complete in place". <br />10. Where the words "similar to" are used and followed by a manufacturer's name and product, model or type <br />number, such manufacturer, product, model or type number shall be considered as the standard of quality <br />for the item or material or work specified, in a general and technical sense, not meaning "identical". <br />11. Wherever in these documents an article, device or piece of equipment is referred to in the singular number, <br />such reference shall mean to include as many such articles as are shown on the Drawings or are required to <br />complete the -installation. <br />1.04 ABBREVIATIONS <br />A. These specifications are, for certain sections, written in the imperative mood, abbreviated, or "streamlined" and <br />frequently include incomplete sentences. In sections or parts of sections written in the imperative mood, words <br />such as "shall", "shall be", "the Contractor shall", and similar mandatory phrases and the words "of', "the", "a", <br />and "all" shall be supplied by inference in the same manner as they are in but not on the Drawings. <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.